D.GuilhemITER IR/VIS Diagnostic -- April 4th 2006 -- Cadarache Euratom 1/22 ITER wide-angle viewing thermographic and visible system Y.Corre, S.Droineau,

Slides:



Advertisements
Similar presentations
Examples of ITER CODAC requirements for diagnostics
Advertisements

1 1 – Experience of diagnostics used for LH grill protection 2 – Layout of the suitable diagnostics in ITER 3 – Info on fibre optics for wave guide arc.
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
30-meter cabin refurbishment for a large Field Of View: status of on-going study S.Leclercq 28/04/2008.
Laser Speckle Extensometer ME 53
1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
LH SOL generated fast particles meeting, Prague, Dec 2004 J. Mailloux JET Programme 2005 Selected issues that could affect LH experiments.
SIW 2003 The antenna element Ravi ATNF, Narrabri 1.The role of the antenna in a Fourier synthesis radio telescope 2.The Compact array antenna.
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
On-Orbit Adjustment Calculation for the Generation-X X-ray mirror Figure D. A. Schwartz, R. J. Brissenden, M. Elvis, G. Fabbiano, D. Jerius, M. Juda, P.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Generation-X telescope: Measurement of On-Orbit Adjustment Data Dan Schwartz, R. J. Brissenden, M. Elvis, G. Fabbiano, T. Gaetz, D. Jerius, M. Juda, P.
1Xxxxxx Titre xxxx © NDT expert © NDT expert - The ultimate control INFRARED THERMOGRAPHY ON AIRCRAFT.
Science Specification of SOLAR-C payload SOLAR-C Working Group 2012 July 23.
Chapter 5.
J AN D ESIGN OF I NFRARED THERMOGRAPHY DIAGNOSTICS F OR THE WEST P ROJECT X. Courtois, MH. Aumeunier, Ph. Moreau, C. Balorin, H. Roche, M. Jouve,
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
1 Applications of ADAS to ITER Diagnostics Robin Barnsley and ITER Diagnostics Division Martin O’Mullane, Strathclyde University ADAS Workshop, Cadarache,
Optical Design Work for a Laser-Fiber Scanned
22 February 2006 Quo Vadis ? Wide Field Imaging A Wide Angle Very Low Threshold Air Cherenkov Imaging Telescope Razmick Mirzoyan MPI Munich, Germany.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
PSI 2008 Toledo E.Gauthier TORE SUPRA Association EURATOM-CEA 26-30/05/2008 Progress in diagnostics for characterization of plasma-wall interaction in.
MIT 2.71/ /22/04 wk3-b-1 Imaging Instruments (part I) Principal Planes and Focal Lengths (Effective, Back, Front) Multi-element systems Pupils &
Ottó Bede TBM Consortium Meeting, Brasimone ITER PPE Goal Oriented training program RST meeting 17th January 2011, Cadarache, France József.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
SPIE Optics for EUV, X-Ray, and Gamma-Ray Astronomy VI
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
An IFU for IFOSC on IUCAA 2m Telescope
Optical Subsystem Roy Esplin Dave McLain. Internal Optics Bench Subassembly 2 Gut Ray Dichroic Beamsplitter (MWIR reflected, LWIR transmitted) LWIR Lens.
USING OF METEOSAT SECOND GENERATION HIGH RESOLUTION VISIBLE DATA FOR THE IMPOVEMENT OF THE RAPID DEVELOPPING THUNDERSTORM PRODUCT Oleksiy Kryvobok Ukrainian.
Recent Results from Dragonfire Armor Simulation Experiments Farrokh Najmabadi, Lane Carlson, John Pulsifer UC San Diego HAPL Meeting, Naval Research Laboratory.
14 Oct. 2009, S. Masuzaki 1/18 Edge Heat Transport in the Helical Divertor Configuration in LHD S. Masuzaki, M. Kobayashi, T. Murase, T. Morisaki, N. Ohyabu,
EAST Data processing of divertor probes on EAST Jun Wang, Jiafeng Chang, Guosheng Xu, Wei Zhang, Tingfeng Ming, Siye Ding Institute of Plasma Physics,
Direct Observation of Runaway Electron Beams in EAST Yuejiang Shi Baonian Wan, Jia Fu, Huixian Gao, Fudi Wang, Jiahong Li, and EAST team Institute of Plasma.
Pellet Charge Exchange Measurement in LHD & ITER ITPA Tohoku Univ. Tetsuo Ozaki, P.Goncharov, E.Veschev 1), N.Tamura, K.Sato, D.Kalinina and.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
Low Polarization Optical System Design Anna-Britt Mahler Polarization Laboratory Group College of Optical Sciences.
Image at:
January 2008ITPA on Diagnostics, Philip Andrew, A. Herrmann1 Albrecht Herrmann EURATOM - IPP Association, Garching, Germany ITER Divertor Thermography.
A Broad Band Imager for the European Solar Telescope Matteo Munari & Salvo Scuderi INAF – Osservatorio Astrofisico di Catania Massimo Cecconi INAF – FGG.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
GSFC/Spinhirne 03/13/2002 Multispectral and Stereo Infrared Cloud Observations by COVIR (Compact Visible and Infrared Imaging Radiometer) J. Spinhirne,
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
“Phase C” Design of the JWST/FGS Tunable Filter Imager TIPS/JIM June 15, 2006 Alex Fullerton STScI / UVic.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Hard X-rays from Superthermal Electrons in the HSX Stellarator Preliminary Examination for Ali E. Abdou Student at the Department of Engineering Physics.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Integral Field Spectrograph Eric Prieto LAM. How to do 3D spectroscopy.
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
Update of the SR studies for the FCCee Interaction Region
Temperature Measurements of Limiter Surfaces at High Heat Flux in the HT-7 Tokamak H. Lin, X.Z. Gong, J. Huang, J.Liu, B. Shi, X.D. Zhang, B.N. Wan,
Manuel Marchiò, Raffaele Flaminio, Shunshi Kuroki
LumiCal mechanical design, integration with LDC and laser alignment
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
Design of Infrared thermography diagnostics For the WEST Project
Intra-pixel Sensitivity Testing Preliminary Design Review
Progress on 1.8m Telescope with 127-element Adaptive Optics at IOE
Alignment of the first two magnet system modules of Wendelstein 7-X
On the accuracy of port assembly at Wendelstein 7-X
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 1/22 ITER wide-angle viewing thermographic and visible system Y.Corre, S.Droineau, A.Geraud, D.Guilhem, R.Jasper, E.Thomas, G.Madalluno, J.B.Migozzi, C.Walker Duties: - IR Thermography of the main chamber - Visible Spectroscopy (D , impurities: W, Be, C…) - Runaway Studies

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 2/22 This presentation Our “know-how” for TORE-SUPRA Optical and Mechanical Pre-designs of IR and VIS Spatial resolution Pellet viewing Points to be Adressed and Developments Conclusions

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 3/22 IR Thermography on Tore-Supra

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 4/22 Feed-Back Control Participates to the security of PFC - Feed-Back on surface temperature of PFC - Antenna limiter protections (LHCD, ICRH) - Main Toroidal Pumped Limiter - Feed-Back compatible with others feedback - Width of current profile  n // - V loop  Poloidal Field Current - Heating power  IR thermography - Detection and Killing of ARCs at the LHCD mouth

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 5/22 Global Assembly : Ports Configurations Study STARTING POINT: - 4 Mounting places : EQ#01, EQ#03, EQ#09, EQ# known & approved (by ITER Team) port configurations : Preliminary design in Port 1 and Port 3 (C.Walker 2001) ITER preliminary design EQ #3

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 6/22 Diagnostics space occupation port plug EQ#01 Top view Side view

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 7/22 Points of Interest Blind Spot

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 8/22 REFERENCE Optical Line Distance between Front-End mirror and Cassegrain Relay is FIXED Fixed

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 9/22 Generic Viewing Line Head mirrors + Deflecting flat mirrors in the dogleg + Cassegrain telescopes + Adaptative relay Visible IR 2 Cassegrains telecopes Head mirrors Adaptative relay Flat Mirrors

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 10/22 Visible and IR Cassegrain telescopes embedded together IR Cassegrain Visible Cassegrain IR Image Visible Image

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 11/22 Ray tracing of one hollow relay Field groups IR Visible

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 12/22 General view of an assembled line (from the Cassegrain telescopes to the Bio-shield) Auto-Adaptative relay : - 5 mm in X,Y directions - 45 mm Z direction Auto-Adaptative « sliding » relay x y z

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 13/22 Integration of Optical design into a Mechanical design

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 14/22 Clashes Port-Plug#1 Interference 1 and 2 Interference 3

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 15/22 Side view of the port-plug Opening to access the mirrors adjustments An opening is necessary on the side for mirrors adjustments Bio-Shield

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 16/22 Infrared Cameras Expected F-number on IR sensor : 1200 x 1000 pixels array with 15µm pitch (y=18mm x 15mm), then: FN = y / SQGE = 3.3 Maximum Resolution : If one inject the “point size” 1pt =. FN 55% ensquared energy) it comes (resolution = SQGE / ): - For IR : = 1800pts = 1080pts - For hollow Visible : = 3375pts = 1928pts

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 17/22 Spatial resolution and wall covering r (m) z (m) median in median out top divertor out divertor in  Sampling : poloidal section = 150 points reproduced every   1   ~ points main chamber view: ( ,  ) r (cm)  (radian)  EQ#01, 03, 09, 12  /2 inner wall outer wall  (radian) top Good Coverage of the first wall > 80% Outer wall completely covered (r  9 mm) Half inner wall is viewed with : good resolution. Small areas not seen : top part and divertor region Divertor

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 18/22 The respective locations of the pellet tracks and endoscopes from a top view. Pellet viewing 2 LFS injections 3 HFS injections P6 track P18 track P12 track P6 track P12 track

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 19/22 Port plug EQ#01 #01 LEFT #01 DIVERTOR #01 RIGHT P18 P6 Same views for #03, #09 and #12 Conclusion: Good for Pellet tracking

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 20/22 DEVELOPMENTS I. Wide band Visible and Infrared antireflection coating for lenses Simplified architecture Reduction of Optical and Mechanical tolerances Large increase of the Visible performances (but not the IR) II. Test the auto-adaptative shifting relay (solution more reliable than active method) : Relative movement of the machine respectively to the bio-shield, Can accommodate the ITER on-axis translation (45mm) and the transverse directions (5mm) III. Optical generic line choice and optimisation Actually not fully designed  missing elements / information Broadband coating ? Number of beam-splitters ? IV. A mechanical design should be done when points I to III will be achieved V. Any type of cooled infrared camera (3µm – 5 µm) is sensitive to magnetic field

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 21/22 Points to BE ADRESSED 1)New optical calculations  Use Up-to-Date DATA (diagnostics, pupils, AR coating, etc…)  Remove off-Axis (8° between Optical Axis and Blind Spot) 2)Mechanical update to take into account new optical design 3)Design a test-stand (how to qualify the IR endoscopes)

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 22/22 CONCLUSIONS TORE-SUPRA  FEED-BACK and ARC-DETECTION with IR Thermography ITER  Architecture design of a GENERIC Optical and Mechanical Line CLASHES : Some identified  Have to be solved COVERAGE and SPATIAL RESOLUTION : have been estimated  Good Is-it adequate for : - IR-Thermography ?  YES - Visible Spectroscopy : - D  ?  YES - W ?  NO - Be ?  To be checked - Runaways (10-50 MeV with detection limit of 1 kA) ?  YES - Pellets Injections (#06, #12 and #18) ?  YES - Replacing IR-Divertor thermography ?  NO

D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 23/22 Thank you for your attention