2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.

Slides:



Advertisements
Similar presentations
1GTE – October 23rd 2003 Regulation of the gas market in France Dominique JAMME Gas Directorate
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
ERGEG Gas Regional Initiative North-West IP Medelsheim / Obergailbach TSOs’ joint diagnostic 9 October 2007.
South Region LNG market changes and cross border flows SGRI – 15th November 2013.
RCC Meeting 13 December 2007 Interconnections: primary market IP Taisnières / Blaregnies / Quévy IP Taisnières / Blaregnies / Quévy IP Obergailbach / Medelsheim.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
French transport structure SG meeting Madrid – 15 July 2009.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
GRI NW Transparency Stockholm Stakeholder Group Conference 26 November 2009 Martin Crouch Partner: European Strategy.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
New tariffs system in France GTE 23 rd October 2003 Jacques Laurelut.
1 Open season th IG Meeting 26 th March 2010 Paris.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gaz de France Réseau de Transport Jacques Laurelut How Gaz de France – Transport can contribute to further competition in France
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
First results of Market Coupling in gas: the French experience SG-meeting GRI NW 25 November SG-meeting GRI NW – 25 November 2011.
1 1 Brussels, 31 st March 2009 Presentation by Peter Hohaus Senior Manager Legal & Regulatory Affairs ERGEG North West Gas Regional Energy Market Transparency.
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
ERGEG South Gas Regional Initiative
ENAGAS – TIGF Agreement Larrau Interconnection, November 2007
Current status of the existing interconnections between France and Spain ERGEG – 2nd implementation meeting group of the South GRI ERGEG, 11 Décembre.
26th February 2015 Teleconference
41st IG meeting 24th January 2017
European Transparency Requirements
41st IG meeting 24th January 2017
Enagás, GRTgaz, REN and TIGF
26th February 2015 Teleconference
Presentation transcript:

2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation Group meeting

ERGEG South GRI – 2 nd IG 2006 December 11th- 2 - GRTgaz / TIGF interface : Physical (1/2) Map of the area with the pipeline system of GRTgaz and TIGF:

ERGEG South GRI – 2 nd IG 2006 December 11th- 3 - GRTgaz / TIGF interface : Physical (2/2) Capacity physically available at both points (current plans): GWh/dTIGF->GRTgaz (Castillon)GRTgaz->TIGF (Castillon) Exit TIGFEntry GRTgazExit GRTgazEntry TIGF 2007S: 100 W: 50 S: 20 W: 30 S: 110 W: 90 S: 110 W: S: 180 W:180 S: 180 W:180 S: 180 W:150 S: 180 W: S: 180 W:180 S: 180 W:180 S: 180 W:150 S: 180 W: S: 180 W:180 S: 180 W:180 S: 180 W:150 S: 180 W: S: 180 W:180 S: 180 W:180 S: 180 W:150 S: 180 W:150 GWh/dTIGF->GRTgaz (Cruzy)GRTgaz->TIGF (Cruzy) Exit TIGFEntry GRTgazExit GRTgazEntry TIGF 2007S: 100 W:20 S: 20 W:20 S: 180 W:170 S: 180 W: S: 30 W: 30 S: 30 W: 30 S: 190 W:180 S: 190 W: S: 30 W: 30 S: 30 W: 30 S: 190 W:180 S: 190 W: S: 30 W: 30 S: 30 W: 30 S: 190 W:180 S: 190 W: S: 30 W: 30 S: 30 W: 30 S: 190 W:180 S: 190 W:180 Note: S = Summer capacity W= Winter capacity

ERGEG South GRI – 2 nd IG 2006 December 11th- 4 - GRTgaz / TIGF interface : Contractual (1/2) Two contractual links are offered to shippers: Hérault: between “GRTgaz Sud” and TIGF Dordogne: between “GRTgaz Ouest” and TIGF Additionally, GRTgaz purchases capacity from TIGF for the internal needs of the “GRTgaz Sud” zone (invisible to shippers) TIGF PEG Sud PEG Ouest Montoir Biriatou Capacity bought by GRTgaz on TIGF’s network Entry capacity offered to shippers by the TSOs Exit capacity offered to shippers by the TSOs Contractual entry-exit point Contractual LNG entry point Larrau Hérault Dordogne Fos Dordogne Montoir

ERGEG South GRI – 2 nd IG 2006 December 11th- 5 - GRTgaz / TIGF interface : Contractual (2/2) Annual capacity (at year end) is as follows: (Total / Booked / Available for Firm and Interruptible) GWh/dTIGF->GRTgaz (Hérault)GRTgaz->TIGF (Hérault) Exit TIGFEntry PEG Sud Exit PEG SudEntry TIGF 2007 F: 10 / 7 / 3 I: 20 / 0 / 20 F: 50 / 50 / 0 I: 175 / 150 / F: 20 / 5 / 15 I: 30 / 0 / 30 F: 285 / 215 / 70 I: 0 / 0 / F: 20 / 5 / 15 I: 30 / 0 / 30 F: 285 / 215 / 70 I: 0 / 0 / F: 20 / 5 / 15 I: 30 / 0 / 30 F: 285 / 215 / 70 I: 0 / 0 / F: 20 / 5 / 15 I: 30 / 0 / 30 F: 285 / 215 / 70 I: 0 / 0 / 0 GWh/dTIGF->GRTgaz (Dordogne)GRTgaz->TIGF (Dordogne) Exit TIGFEntry PEG Ouest Exit PEG Ouest Entry TIGF 2007 F: 0 / 0 / 0 I: 40 / 5 / 35 F: 43 / 34 / 9 I: 13 / 11 / F: 0 / 0 / 0 I: 40 / 5 / 35 F: 43 / 34 / 9 I: 13 / 0 / Not relevant 2010 Not relevant 2011 Not relevant Note: from 2009 PEG Ouest will cease to exist as the balancing zones in the North of France will be merged.

ERGEG South GRI – 2 nd IG 2006 December 11th- 6 - Utilisation rate in 2005/06 Utilisation rate data are for the period 01/01/2005 to 30/11/2006 Hérault (GRTgaz data) (Negative value means entry onto GRTgaz Network) Commercial (GWh/d)From 50 (F) (I) to - 10 (F) - 20 (I) Average daily flow (GWh/d)99.2 Maximum daily flow (GWh/d)225.4 Minimum daily flow (GWh/d)- 3.0 Average utilisation rate (GRTgaz -> TIGF) (%)198.3% of annual firm capacity[1], 44.1% of F+I[1] [1] Additional capacity is sold as monthly firm capacity in the summer. Dordogne (GRTgaz data) (Negative value means entry onto GRTgaz Network) Commercial (GWh/d)From 43 (F) + 13 (I) to - 40 (I) Average daily flow (GWh/d)42.0 Maximum daily flow (GWh/d)59.4 Minimum daily flow (GWh/d)- 0.5 Average utilisation rate (GRTgaz -> TIGF) (%)97.7% of annual firm capacity, 74.4% of F+I

ERGEG South GRI – 2 nd IG 2006 December 11th- 7 - Capacity published on GRTgaz’ website (1/2) Exit capacity in 2007

ERGEG South GRI – 2 nd IG 2006 December 11th- 8 - Capacity published on GRTgaz’ website (2/2) Entry capacity in 2007