Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Production Operations Management - 5 th Edition Chapter.

Slides:



Advertisements
Similar presentations
Operations and Supply Chain Management, 8th Edition
Advertisements

Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Inventory Management Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Production Operations Management - 5 th Edition Chapter.
Chapter 16 Lean Systems.
Just-in-Time and Lean Systems
Just-In-Time and Lean Systems
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 4 Supplement Roberta.
Beni Asllani University of Tennessee at Chattanooga
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
Beni Asllani University of Tennessee at Chattanooga
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Inventory Management Operations Management - 5 th Edition Chapter.
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Lean operations and JIT
JIT and Lean Operations
Chapter 7, Lean Thinking and Lean Systems
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Just-In-Time & Lean Systems
JIT and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Products and Services Operations Management - 5 th Edition Chapter.
PRODUCTION & OPERATIONS MANAGEMENT Module II JIT & LEAN PRODUCTION Prof. A.Das, MIMTS.
Copyright 2011 John Wiley & Sons, Inc. Chapter 5 Operations Management 5-1.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
5S Workplace Audit Category Item Level Sort Store Shine Standardize
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 11 Just-In-Time and Lean Production.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Facilities Operations Management - 5 th Edition Chapter 7 Roberta.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Production.
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services.
© Wiley Chapter 10 – Facility Layout Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Chapter 7 – Just-in-Time and Lean Systems
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 10 Supplement Roberta.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean System Methods ISV Operations Management - 6 th Edition.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Cost Management, Second Canadian Edition LO1 Explain how value chain analysis, supply chain, and JIT are used to improve operations LO2 Explain target.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operational Decision-Making Tools: Simulation
Chapter 16 Lean Systems Russell and Taylor Operations and Supply Chain Management, 8th Edition.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 12 Supplement Roberta.
Lean operations and JIT
Beni Asllani University of Tennessee at Chattanooga
Inputs and Outputs to Aggregate Production Planning
Chapter 7 – Just-in-Time and Lean Systems
The Quality System Chapter 13
Just-In-Time and Lean Production
Lean Operations in Services
Transportation and Transshipment Models
Beni Asllani University of Tennessee at Chattanooga
Just-In-Time and Lean Production
Beni Asllani University of Tennessee at Chattanooga
Sales and Operations Planning
Beni Asllani University of Tennessee at Chattanooga
Supply Chain Management Strategy and Design
Inputs and Outputs to APP
Presentation transcript:

Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Production Operations Management - 5 th Edition Chapter 15 Roberta Russell & Bernard W. Taylor, III

Copyright 2006 John Wiley & Sons, Inc.15-2 Lecture Outline   Basic Elements of Lean Production   Benefits of Lean Production   Implementing Lean Production   Lean Services

Copyright 2006 John Wiley & Sons, Inc.15-3 Lean Production   Doing more with less inventory, fewer workers, less space   Just-in-time (JIT) smoothing the flow of material to arrive just as it is needed “JIT” and “Lean Production” are used interchangeably   Muda waste, anything other than that which adds value to the product or service

Copyright 2006 John Wiley & Sons, Inc.15-4 Waste in Operations

Copyright 2006 John Wiley & Sons, Inc.15-5 Waste in Operations (cont.)

Copyright 2006 John Wiley & Sons, Inc.15-6 Waste in Operations (cont.)

Copyright 2006 John Wiley & Sons, Inc.15-7 Basic Elements   Flexible resources   Cellular layouts   Pull production system   Kanban production control   Small lot production   Quick setups   Uniform production levels   Total productive maintenance   Supplier networks

Copyright 2006 John Wiley & Sons, Inc.15-8 Flexible Resources   Multifunctional workers perform more than one job general-purpose machines perform several basic functions   Cycle time time required for the worker to complete one pass through the operations assigned   Takt time paces production to customer demand

Copyright 2006 John Wiley & Sons, Inc.15-9 Standard Operating Routine for a Worker

Copyright 2006 John Wiley & Sons, Inc Cellular Layouts   Manufacturing cells comprised of dissimilar machines brought together to manufacture a family of parts   Cycle time is adjusted to match takt time by changing worker paths

Copyright 2006 John Wiley & Sons, Inc Cells with Worker Routes

Copyright 2006 John Wiley & Sons, Inc Worker Routes Lengthen as Volume Decreases

Copyright 2006 John Wiley & Sons, Inc Inventory Hides Problems

Copyright 2006 John Wiley & Sons, Inc Less Inventory Exposes Problems

Cost Impact of Inventory  High inventory  high inventory holding costs  High inventory hides problems, and the company pays for the cost of the problems  In manufacturing, high inventory requires large lot sizes Long manufacturing lead times Long manufacturing lead times Harder to meet changing customer demand Harder to meet changing customer demand Delays in introducing new or improved products Delays in introducing new or improved products

Reducing Inventory Kanban Pull System  Production kanban: authorization to make a container of parts No production can be done without a production kanban and an empty container No production can be done without a production kanban and an empty container  Withdrawal kanban: authorization to get a container of parts for use in the next process step  Work in process (WIP) inventory WIP < (number of kanbans)(lot size) WIP < (number of kanbans)(lot size) Lot size = number of parts of a certain type produced at one time Lot size = number of parts of a certain type produced at one time

Reducing Inventory Kanban Pull System

Copyright 2006 John Wiley & Sons, Inc Pull System  Material is pulled through the system when needed  Reversal of traditional push system where material is pushed according to a schedule  Forces cooperation  Prevent over and underproduction   While push systems rely on a predetermined schedule, pull systems rely on customer requirements

Reducing Inventory Small Lot Sizes and Quick Setups  Benefits of small lot sizes Shorter manufacturing lead time  Faster response to changes in customer demand Shorter manufacturing lead time  Faster response to changes in customer demand Lower inventory and inventory holding costs Lower inventory and inventory holding costs  Small lot sizes require more setups Setups must be done more quickly and at lower costs. This is necessary Setups must be done more quickly and at lower costs. This is necessary To ensure adequate capacity To ensure adequate capacity To control setup costs To control setup costs To avoid production delays To avoid production delays

Copyright 2006 John Wiley & Sons, Inc Uniform Production Levels   Result from smoothing production requirements  Kanban systems can handle +/- 10% demand changes  Smooth demand across planning horizon  Mixed-model assembly steadies component production

Copyright 2006 John Wiley & Sons, Inc Mixed-Model Sequencing

Copyright 2006 John Wiley & Sons, Inc Quality at the Source   Visual control makes problems visible   Poka-yokes prevent defects from occurring   Kaizen a system of continuous improvement; “change for the good of all”   Jidoka authority to stop the production line   Andons call lights that signal quality problems   Under-capacity scheduling leaves time for planning, problem solving, and maintenance

Copyright 2006 John Wiley & Sons, Inc Examples of Visual Control

Examples of Visual Control (2) Copyright 2006 John Wiley & Sons, Inc.15-24

Copyright 2006 John Wiley & Sons, Inc Examples of Visual Control (3)

Copyright 2006 John Wiley & Sons, Inc Total Productive Maintenance (TPM)  Breakdown maintenance Repairs to make failed machine operational Repairs to make failed machine operational  Preventive maintenance System of periodic inspection and maintenance to keep machines operating System of periodic inspection and maintenance to keep machines operating  TPM combines preventive maintenance and total quality management concepts

Copyright 2006 John Wiley & Sons, Inc   Unneeded equipment, tools, furniture; unneeded items on walls, bulletins; items blocking aisles or stacked in corners; unneeded inventory, supplies, parts; safety hazards   Items not in their correct places; correct places not obvious; aisles, workstations, & equipment locations not indicated; items not put away immediately after use   Floors, walls, stairs, equipment, & surfaces not lines, clean; cleaning materials not easily accessible; labels, signs broken or unclean; other cleaning problems   Necessary information not visible; standards not known; checklists missing; quantities and limits not easily recognizable; items can’t be located within 30 seconds   Number of workers without 5S training; number of daily 5S inspections not performed; number of personal items not stored; number of times job aids not available or up-to-date   Keep only what you need   A place for everything and everything in its place   Cleaning, and looking for ways to keep clean and organized   Maintaining and monitoring the first three categories   Sticking to the rules   Seiri (sort)   Seiton (set in order)   Seisou (shine)   Seiketsu (standardize)   Shisuke (sustain) 5S ScanGoalEliminate or Correct

Copyright 2006 John Wiley & Sons, Inc Supplier Networks   Long-term supplier contracts   Synchronized production with suppliers   Supplier certification   Mixed loads and frequent deliveries   Precise delivery schedules   Standardized, sequenced delivery   Locating in close proximity to the customer

Copyright 2006 John Wiley & Sons, Inc Benefits of Lean Production   Reduced inventory   Improved quality   Lower costs   Reduced space requirements   Shorter lead time   Increased productivity

Copyright 2006 John Wiley & Sons, Inc Benefits of Lean Production (2)   Greater flexibility   Better relations with suppliers   Simplified scheduling   Increased capacity   Better use of human resources   More product variety than repetitive manufacturing   More efficient than intermittent manufacturing

Limitations of lean production  If the company makes only a small number of high-volume items, then mass production or continuous manufacturing will be more efficient  Lean production does not work well when many low-volume items make scheduling hard many low-volume items make scheduling hard total demand is seasonal or highly variable total demand is seasonal or highly variable the company must accommodate large rush orders the company must accommodate large rush orders the company is small and cannot afford enough equipment for cellular manufacturing the company is small and cannot afford enough equipment for cellular manufacturing Copyright 2006 John Wiley & Sons, Inc.15-31

Copyright 2006 John Wiley & Sons, Inc Lean Services  Basic elements of lean production apply equally to services   Most prevalent applications lean retailing lean banking lean health care

Copyright 2006 John Wiley & Sons, Inc Copyright 2006 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permission Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages caused by the use of these programs or from the use of the information herein.