Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.

Slides:



Advertisements
Similar presentations
Zebra® 105SL™ * Removing and Installing Printhead
Advertisements

CHAPTER 45 Engine Lubrication.
The EZ-SAT.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
CricketSat Assembly.
AC-SSC-1 Installation and operation manual
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
Pixel Ladder QA manual Setup Testing Disassembly R. Akimoto, A. Shaver. July 2010.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
BE-2110i VF/WIDEBAND TRANSMISSION TEST SET OPERATING OVERVIEW Slide 1 of 9.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
E102 LAB Temperature Control of Heated Block. Temperature Controller Specifications Design, simulate and test a control system for temperature control.
AccuMax Multi-Point Injection Mechanics
Embedded Programming and Robotics
3D Micromanufacturing Lab. School of Mechatronics Gwangju Institute of Science and Technology 3D Micromanufacturing Lab. School of Mechatronics Gwangju.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
1 DC ELECTRICAL CIRCUITS ELECTRONIC TRAINER AND BREADBOARDING.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
Installation. Indoor Unit Installation Typical Installation.
Pixel Ladder QA manual Software R. Akimoto, A. Shaver. July 2010
Settings & Adjustments. Settings & Adjustments.
Mercury G3 Service Tool Training Overview
Setting up the Ricoh C305 Press F5 to start the Presentation
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
GCS 300 System Operation Application – Level 1.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
Mercury G3 Service Tool Training Overview When opening G3 you will start at this screen first import thing to look for is communication.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Introduction to Vexnet
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Pixel Ladder QA manual Hardware R. Akimoto, A. Shaver. July 2010.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Trouble Shooting Smart Board! Click here to see menu. Trouble Shooting Smart Board! Click here to see menu. By Rob Fioretta.
Data Acquisition Device (DAQ) A DAQ is a cool little device that allows you to interface hardware to a computer. Here is what we will do:  Create a square.
New features of Chamber Monitor Panel E. Furfaro 9 april 2012.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
NN-CS596S Steam Microwave Oven. NN-CS596S Oven Specification.
USER GUIDE TEMPERATURE CONTROLLER TR-2006 Hot runner temperature controller ShenZhen TanRex Electronic Co.ltd.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Introduction to Vexnet
Louisiana State University Radiation Safety Office
Soxhlet Unit B Maintenance By: Shawna Brookes.
Maintenance masterdrive siemens
T-6B On-Board Oxygen Generation System (OBOGS)
Maki KUROSAWA VTX Group 2014 Feb 20
McCrometer Nano Board Test Procedure
1/17/2019.
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Ladder QA manual

Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than 5 ℃. - Humidity inside test box. ✓ Check the difference from the value where the QA in RIKEN was performed is less than 5% Power supply - Voltage and current of the power supply for SPIRO and LADDER at the operational voltage. ✓ SPIRO: Check the difference of the current from the value of the same SPIRO is less than 0.1A. ✓ LADDER: Check the difference of the current from the value where the QA in RIKEN was performed is less than 0.1A. - Bias voltage and leakage current at each 5V. ✓ Check the difference of the leakage current from the value where the QA in RIKEN was performed is less than 0.3μA.

Check items 2 DAC value SPIRO S/N Confirm that the SPD FEM is reading the correct S/N value - Reference voltage. (DAC_REF_VDD, DAC_MID, and GTL_REF) ✓ Check the difference from the value of the same SPIRO is less than 2. - Threshold value for each chip. ✓ Check the difference from the value where the QA in RIKEN was performed is less than Mask pixel. ✓ Check there are difference from the result of the QA in RIKEN. Hit map using β ray source. ✓ Check the difference of dead area.

Procedure of QA

Test Box Setup You have to do all the processes very carefully. 1. Remove the top cover and bottom acrylic plate. It is helpful to place across the test box to support the stave just above it until you’re ready to lower the stave into the box. This is also useful during disassembly. 2. Attach tubes for NOVEC. - Silicon grease is used to put on and off them smoothly. It is applied to the inside of the tubes. 3. Set extenders and cables for power supplies for ALICE chips and bias voltage and for GND. - You have to be care about the connection at connector for data or control signals since a wrong connection cause some wrong responses of ladders.

Applying Silicon Grease

Ladder Connector Bias Voltage input Bias may be connected to either Bus Data Connectors 3.5 V Gnd

Bus Connections Bus data connectors Ground Ladder 3.5 V Bias Bus/ladder power connections Ground and Ladder wires may be connected in any position within their correct connector

Connecting Bus and ladder Power connections: Ladder and Ground are soldered onto the ladder side, so they must be plugged into the bus connection. Bias should remain connected to the bus, and plugged in to the ladder Data connectors are attached after power. They should be clean of dust before connection. Use canned/compressed air, and make sure that you are blocking or preventing dust from blowing onto the ladder itself. Line up the bus and ladder connectors and when the connection is aligned, press the connectors into place. Be Careful with this connection.

Interlock system Before powering the system, you must pass the interlock system checks. Interlock system checks humidity inside test bench, the flow rate and temperature of NOVEC, and whether the valve is open or not. 1. First, you have to flow N2 gas to decrease the humidity. This has to be done before flowing NOVEC to prevent condensation on ladders. 2. After the humidity gets low enough (0% relative humidity), start the pump and refrigeration, and open the valves (including the valve on the interlock).

Interlock system Valve control: Open Close Interlock power Relative Humidity: measured threshhold Temperature reading (here, of the NOVEC, as no temp. sensor is on the staff) System Checks: green light indicates check passed, red light indicates check failed Valve, Output, Humidity, Temp, Flow Humidity sensor reading

Low voltage After all interlocks are passed, you can start to supply voltages to SPIRO board (SPIRO), chips on ladder (LADDER), and silicon (BIAS). First you have to supply to SPIRO, next to LADDER, and the last to BIAS. The voltage supplied to SPIRO is 5.0V. When you supply to LADDER, you have to turn up the voltage slowly from 0V to 3.5V. (approximately at the rate of.1V/sec) - Before you turn on the power supply, you have to check the output voltage set to its lowest value. - As you increase the voltage the current through the ladder goes through a rapid rise around 2 V. If it rises quickly to 5 A, pause to allow the system to equilibrate and then continue without allowing the current to pass 5 A. You’ll notice after the system is powered up, the current will drift down over time. When you supply to BIAS, you have to turn up the voltage slowly from 0V to 50V. - If the current is anomalously large in comparison with the value at the test in RIKEN, consider that there may be some problem. - There are some modules which can not operate with the bias voltage of 50V due to large leakage current or continuous increase of leakage current. You have to check proper operational bias voltage before supplying the voltage.

Low Voltage Setup Right Half-LadderLeft Half-Ladder

Disassembly notes In general, simply proceed through the assembly procedures in reverse Gradually decrease the Ladder/Bias voltage, power down electronics. Turn off cooling, allow the stave to come closer to room temperature (to prevent condensation when you open the test box) Open test box, lift out stave. Carefully disconnect the NOVEC tubes: Use a ~2mm or 5/64” hex (Allen) wrench to support the Stave (see following picture) Twisting back and forth, slowly pull off the NOVEC tube. Using a plastic sheathed eyeglass screwdriver (as pictured) carefully pry the bus data connection off of the ladder. Disconnect the Ladder and Ground from the Bus, and the Bias from the Ladder. Tilt ladder to drain remaining NOVEC. Return stave to casing.

Disassembly Tools Minor divisions are ~ 1mm

Novec Tube Removal Note the position of the wrench supporting the stave

Removing Data Connector

Data acquisition Data are send from SPIRO board to FEM via fiber cable and read from FEM through USB cable. Ops system is used for data acquisition. User name and password of DAQ PC is - User name : pixel - Password : pixel*3186

Detail of DAQ operation

1. Select USB mode. 2. Check the HS channels which you are using. 3. Push “RST” button. 4. Push “GO” button

Set proper values for taking data at some registers. - ADDR=0x4, 0x14, 0x24 : select the chips where FastOR signals (self trigger signal) are accepted. ✓ If you use readout channel of 0-3 and accept all FastOR signal from them, you have to set 0x4, 0x14=0xff and 0x24=0x0. - ADDR=0x60, 0x61 : set the maximum trigger rate ✓ 0x60=0x20 and 0x61=0x0 means the maximum rate is 20Hz - ADDR=0x62, 0x63 : set trigger mode. (external trigger mode or self trigger mode) ✓ External trigger mode : 0x62=0x0 and 0x63=0x0 ✓ Self trigger mode : 0x62=0x1 and 0x63=0x1 (Ladder QA is carried out in self trigger mode.)

Set DAC values (DAC_VDD, DAC_MID, GLT_REF) of analog pilot. - Set the HS channel which you intend to set DAC values via “HS Channel Number” panel and set proper DAC values via “Set Analog Pilot DACS” panel. - The DAC values are optimized so that the reference voltage be proper values. ✓ The proper reference voltages are DAC_REF_VDD=1.8V, DAC_REF_MID=0.955V, GTL_REF=0.8V ✓ The reference voltage can be measured at tester adapters. - The above values are stored for each SPIRO board in a spreadsheet. The FEM should read off the proper S/N automatically, but you should confirm that the S/N matches each time you power up the FEM.

Set trigger latency Set threshold values for each chip Set mask and test bit

Set threshold values Threshold values have to be optimized. - You can this optimization by checking FastOR signals which are triggered by noise. FastOR signal can be checked via tester adapters. - Setting larger number means setting lower threshold. - You can find the pixels which have to be masked. The pixels whose threshold is higher than the other pixel at the same chip have to be masked.

Set mask and test bit 1. Select the chip which has the pixel you want to mask (send test pulse). 2. Select the pixel position. 3. Set mask (test) bit. - ALL : Set all the pixel in the chip. - COL : Set all the pixel in the column. - BIT : Set the pixel in the column and the row. 4. You can save and read the bit information

Two dimensional hit map for each chip is shown Take data with external or self trigger Take data with force trigger. Convert data to EXEL file.

DAQ rate is shown Start data taking with external of self trigger. Stop data taking. - Write file: Write data to a file - Graph Display Display hit map. If you display hit map, DAQ rate decrease. It is better not to display when you intend to store data for analysis. Clear hit maps. Take data with force trigger by pushing this button.

Additional Pictures

Chiller

Supporting the Ladder We used this book to support ladders coming out of and going into the test box.

Spiro connection on Bus

Bus connection on SPIRO Test Boards

SPIRO board connected

Left Ladder connection