EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Specifying the Use of CIM in an EMS Project Jay Britton, Fellow, IEEE 2009 PSCE, Seattle
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
MTEI Methods & Tools for Enterprise Integration
© 2013 Jones and Bartlett Learning, LLC, an Ascend Learning Company All rights reserved. Security Strategies in Linux Platforms and.
Processing of structured documents Spring 2003, Part 6 Helena Ahonen-Myka.
Configuration Management Supplement 67 Robert Horn, Agfa Healthcare.
3rd Annual Energistics Standards Summit Standards – Benefits across Industries Michael Strathman Aspen Technology, Inc 23 October 2008.
Network Modeling Group Modeling Off Nominal Transformers in NMMS By Nitika Mago, Model Administration.
Network (Common) Model Management System Presentation to ERCOT October 21, 2008 Thomas F Garrity Vice President Energy Management and Automation Siemens.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
EMS User’s Group 2008 Presented By Curtis Crews of ERCOT and Margaret Goodrich of Project Consultants, LLC Presented to EMS User’s Group Atlanta, GA September.
Jay Britton
PTD Energy Management & Information Systems FERC TC: Information Technology for Reliability & Markets ISO-RTO Standards Collaborative July 14, 2004 J.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange? - Schematic.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
1 RDFid Examples of RDFid: _a73ed7b8a60a4b2ea46318a370b9c7de Definition from the profile The document requires only that in a given full model,
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
RPG Meeting Five Year Plan Extension Brad Schwarz.
CIM for Planning and CIM for Dynamic Models - Project Report Terry Saxton Xtensible Solutions CIM User Group Vasteras, Sweden June.
1 What’s Next for Financial Management Line of Business (FMLoB)? AGA/GWSCPA 6 th Annual Conference Dianne Copeland, Director, FSIO May 8, 2007.
(Business) Process Centric Exchanges
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
WEB BASED DATA TRANSFORMATION USING XML, JAVA Group members: Darius Balarashti & Matt Smith.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
European Model Exchange Standard based on - IEC , IEC (updated 2009) - IEC (updated 2009) Jay Britton
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
PI Data Archive Server COM Points Richard Beeson.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Network Model Management System (NMMS)
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Schematic Layout Exchange ( )
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
EDS 2 Early Delivery Systems Approach March 2007.
Nodal Planning Go Live Austin, TX February 3, 2011
NMMS Nodal Network Mgmt and Monitoring System Update
CIM Test Development Process
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
Proposed SysML v2 Submission Plan
The state of implementation of CIM in MAVIR
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Definition from the profile
CIM Model Manager Report
The Network Model Management System
Metadata The metadata contains
Time-Based Management of Large Scale Network Models
Presentation transcript:

EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September 25, 2007 CIM Extended to Power System Planning at ERCOT

2 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX Topics ERCOT Requirement ERCOT CIM Extensions –New Packages –New Classes –New Attributes Topology Processor Customization EPRI CIM for Planning Project –Objectives –Key Steps –Use Cases –Additional Extensions

3 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT Requirements and Needs ERCOT has been mandated by Nodal Protocols to use CIM standards for model exchange and posting Annual Planning Models are required by protocols to be posted in CIM/XML format ERCOT needs an agreed upon framework to: –Map a planning model to the CIM –Provide incremental Planning files in CIM/XML –Convert a solved model in Network Operations to a solved model in planning Improve consistency between the Planning model and the Operations model. Obtain naming consistency between Operations and Planning models

4 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions The Network Modeling Group has extended the CIM for all ERCOT needs including EMS and/or Planning For Planning, we have identified: –In-Service/Out-of-Services Flags –Ownership & Operatorship –Ratings (Static & Dynamic) –Latitude & Longitude –Location/County –Bus Number

5 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions In-Service/Out-of-Services Flags - an Attribute of a PSR (Boolean) Ownership - This contains one or more names of the owners and the percentage of ownership. Every Device in the model will inherit from this. Operatorship - This contains one or more names of the operators and companies that operate the Transmission Element.

6 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions Ratings (Static & Dynamic) - This class needs to model both Static and Dynamic ratings (or we can add an additional class for Dynamic ratings). There must be three types of Ratings: Normal, 2 Hour, and Emergency (15 minutes for operations and conductor for planning). Latitude & Longitude - is a decimal number that is an attribute of a Substation

7 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions Location/County – is a string that is an attribute of a Substation Bus Number – is an integer that is an attribute of a Topological Node

8 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX CIM Extension - New Packages New Packages include: –ETXContingency –ETX –ETXLoadModel –ETXMonitoring –ETXNetwork –ETXPlanning –ETXRASE –ETXRating –ETXRegulation –ETXSCADA

9 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX New Classes Some of the classes include: –BranchGroup –MonitoredGroup –ConnectivityNodeGroup –PlanningArea –PlanningZone –ProtectiveAction –RemedialActionScheme

10 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX New Attributes Some of the attributes include: –minimumEnergencyMW –MWMax –PSSEBusNumber –maximumActivePower –minimumReactivePower –isRAS –isRAP –Generationloss –Loadloss

11 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX Updated Topology Processor ERCOT has procured a new Topology Processor that provides options to handle the differences between the operations and planning model: –Option to Collapse the three 2-winding transformers that represent a three winding transformer to one 3-winding –Option to convert Distributed Generators to Negative Loads –Option to select a containment schema - Zone or Area population has a containment of Load, Owner and Weather –Option to provide an updated contingency list based on topology processed file – Option to specify a temperature to be used as the basis for the rating of dynamically rated lines

12 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM Planning Project Objectives Develop a common model that both operations and planning groups can use as a basis for information exchange Provide the possibility of entering network model data once for both planning and operations applications To build transparency between the operation models and planning models, thus allowing both sides to share critical common information (e.g. ratings, impedance etc). This effort will also evaluate the CIM readiness from two vendors (one for EMS and one for Planning). To evaluate the adequacy of CIM database as a single data source for a power system model repository for PLANNING.

13 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM for Planning Project - Key Steps 1.Define and analyze use cases to identify priority business processes and requirements that need to be supported in the CIM and when exchanging models –Identify processing requirements for transformation/translation –Identify data exchange requirements that need to be supported in the CIM 2.Identify and resolve differences between operational and planning models. 3.Identify and document planning extensions for the CIM –Develop extensions to UML diagrams – add to existing and/or create new class diagrams for planning models –Define new planning profile(s) sufficient to support model types. 4.CIM Mapping Spreadsheets –Develop agreements to map proprietary data representations to CIM- based representations

14 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM for Planning Project - Key Steps (cont’d) 5.Define the XML/RDF schemas needed to support the priority information exchange requirements between planning and operations 6.Conduct interoperability tests to prove the feasibility of model resolutions, CIM extensions, planning profiles defined, and XML/RDF schema definitions. 7.Prepare technical report to document recommendations and issues 8.Conduct industry workshops 9.Submit documents produced to the appropriate standards committees to incorporate the planning extensions into the CIM and related standards.

15 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX Mapping Spreadsheets Generic Data Requirement CIM Class and PropertyCIM Extension Area IdentifierInterchangeArea.mRIDYes Area NameInterchangeArea.nameYes Swing Bus IdentifierTopologicalNode.type=area swing bus Yes Scheduled Net InterchangeInterchangeArea.pNetChangeYes Interchange ToleranceInterchangeArea.pToleranceYes Area DescriptionInterchangeArea.aliasName or InterchangeArea.description Yes

16 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM for Planning - Use Cases Operation to Planning -- Allow planning to import CIM compliant power flow model from EMS. Planning then can compare critical common information used in both Operation and planning models. Planning to Operation -- Allow planning to send new equipment parameters in CIM format back to EMS. Planning to Planning -- Be able to generate base cases efficiently, consistently and reliably and exchange these with other planning applications.

17 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX More Information Cell: (903) CIM User’s Group Web Site: