V ERMONT Y ANKEE E MERGENCY R ESPONSE D URING SAFSTOR AND DECON P RESENTATION TO THE N UCLEAR D ECOMMISSIONING C ITIZENS A DVISORY P ANEL Bill Irwin, Sc.D.,

Slides:



Advertisements
Similar presentations
Public Health and Healthcare Issues. Public Health and Healthcare.
Advertisements

01/29/09For Official Use Only Perspective on Radiological/Nuclear Preparedness and Response: Roles and Capabilities.
Radiological Assessment March 29, AMS Summary Ops Summary – Aerial Measuring Systems totaled more than 130 hours of flying – Flight operations were.
Pollutant Valuation Cost Containment Calculation of Damaged Assets Eddie Leung Secured Environment.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Spill Prevention and Control Regulatory Requirements Hazardous Waste Operations and Emergency Response (HAZWOPER) –29 CFR –Covers spill response.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
HAZWOPER Overview.
Federal Energy and Environmental Regulation Agencies and Laws
Hazardous Waste and Emergency Response
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Regulations / Definitions
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Spill Prevention and Control.
Copyright ©2000 Business & Legal Reports, Inc. SPCC Safety Training Presentations Spill Prevention and Control.
INCIDENT AND EMERGENCY CENTRE Department of Nuclear Safety and Security IECIEC.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Transportation of Radioactive Material in the United States Earl P. Easton.
James A. FitzPatrick NPP Ingestion Pathway Exercise May and June 21-23, 2011 and LHD Radiological Plan Template Kevin Kraus Associate Radiological.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Radiological Emergency Response Plan (RERP) Emergency Planning Overview- Now and in the Future Vermont Division of Emergency Management and Homeland Security.
EPA's Radiological and Nuclear Emergency Response Program June 18, 2009 Presented by: Ronald Fraass, Lab Director National Air and Radiation Environmental.
Intervention for Chronic and Emergency Exposure Situations Module IX Basic Concepts for Emergency preparedness and Response for a nuclear accident or radiological.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Protective Action Guides for Radiological/Nuclear Incidents November 1, 2005 Craig Conklin Department of Homeland Security.
PA State Participation in Liberty RadEx Randolph Easton PA BRP.
Bernards Township Office of Emergency Management February 28, 2012.
Containing Toxicity with Policy Natural Disaster.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
Bridging the Gaps: Public Health and Radiation Emergency Preparedness Planning Guidance and Infrastructure Effects March 23, 2011.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Hazardous Materials Business Plan Training Topic 2
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
PROTECTIVE ACTIONS AND REENTRY. Protective Actions Promptly and effectively implemented or recommended for implementation to minimize the consequences.
Radiological Assessment - of effects from - Fukushima Daiichi Nuclear Power Plant April 7, 2011.
Radiological Assessment - of effects from - Fukushima Daiichi Nuclear Power Plant April 18, 2011.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Business Continuity Disaster Planning
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Chapter 3 Routes of Entry and Environmental Effects.
Royal Canadian Navy Nuclear Vessel Visit Safety Program
New Hanover County Schools Managing Crisis Events
PAG Manual Revision Update and Next Steps
Transition To Keyhole, A Better Approach To Emergency Response Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Transportation of Radioactive Material in the United States
Update on EPA Regulatory and Guidance Activities
Vermont Yankee Decommissioning Update
The Path Forward for WIPP: A State and Local Perspective
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Joseph D. Anderson, Chief
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Research and Test Reactor Decommissioning Inspections
Allen Chan U.S. Government Accountability Office October 2, 2018
Japanese Nuclear Accident And U.S. Response
Community College track: Emergency Operations
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

V ERMONT Y ANKEE E MERGENCY R ESPONSE D URING SAFSTOR AND DECON P RESENTATION TO THE N UCLEAR D ECOMMISSIONING C ITIZENS A DVISORY P ANEL Bill Irwin, Sc.D., CHP Radiological & Toxicological Sciences Chief, Vermont Department of Health September 24, 2015

C URRENT N EEDS & C APABILITIES A CCORDING TO E NTERGY AND THE NRC Through April 2016, the incidents that require offsite response capabilities are spent fuel accidents including those that result in overheating of the spent fuel within the spent fuel pool. Other incidents do not require an offsite response because the dose to the public from those accidents will be less than the Environmental Protection Agency (EPA) Protective Action Guidelines (PAGs).

R ESOURCES SUPPORTED BY E NTERGY T HROUGH A PRIL 2016 Those needed by the six Emergency Planning Zone town Emergency Operations Centers, the State Emergency Operations Center, and several state agencies for full-scale implementation of the current Radiological Emergency Response Plan (RERP). The capabilities that are supported include: Notifications and continuous communications Evacuation, shelter and reunification Radiological accident assessment Radiological environmental assessment Incident management Law enforcement, fire safety, emergency medical services Food and water protection, restrictions and replacement Recovery

N EEDS & C APABILITIES A FTER A PRIL 2016 A CCORDING TO E NTERGY AND THE NRC No accidents will result in doses in excess of the EPA Protective Action Guidelines (PAGs)*. As such, no offsite capabilities beyond what local fire, law enforcement and emergency medical services can provide require Entergy support. *The EPA PAGs are found at public-comment pdf.

T HE EPA P ROTECTIVE A CTION G UIDELINES According to the EPA, their guidance “does not address or impact site cleanups occurring under other statutory authorities such as the: United States Environmental Protection Agency’s (EPA) Superfund program, the Nuclear Regulatory Commission’s (NRC) decommissioning program, or other federal or state cleanup programs”.* Nonetheless, Entergy and the NRC use the guidance to address emergency planning during site cleanup occurring under the NRC decommissioning program. *EPA PAG Manual, page i.

T HE EPA P ROTECTIVE A CTION G UIDELINES The purpose of the EPA Protective Action Guidelines is to help public officials decide whether to evacuate, shelter-in-place, administer potassium iodide, provide alternate sources of water, interdict food or milk, and other actions.* These actions are designed to avoid public doses over specific thresholds. The EPA PAGs were not intended to determine whether facilities support offsite emergency response capabilities. *EPA PAG Manual page 1

T HE EPA P ROTECTIVE A CTION G UIDELINE D OSE From the EPA PAG Manual page 7

O FFSITE E MERGENCY R ESPONSE N EEDS & C APABILITIES A CCORDING TO THE V ERMONT D EPARTMENT OF H EALTH Needs are not based solely on dose. Doses below the EPA PAG dose thresholds are unacceptable from incidents occurring at a shutdown nuclear power station awaiting cleanup. What yields dose to members of the public is contamination that was released and deposited offsite. Offsite radioactive contamination of the environment has human impacts, especially psycho-social and economic impacts. Disregarding the possible added risk of cancer from excess radiation dose, socioeconomic effects can lead to adverse physiological health impacts.

V ERMONTERS W ILL D EMAND A R ESPONSE TO C ONTAMINATION OF T HEIR E NVIRONMENT AND R ISK TO T HEIR E CONOMIC W ELL - BEING This contamination has to be measured. Measurements are made of samples taken from the environment. Samples and measurements are obtained, calculated, interpreted by and acted upon by people with skills other than those possessed by firefighters, law enforcement officers and emergency medical service providers, the only offsite responders funded after June 30, The state has developed and time-tested exceptional capabilities for these functions. Each year that passes after the state ceases these tasks, the capacity to start them up in response to an incident weakens more.

O FFSITE E MERGENCY R ESPONSE N EEDS & C APABILITIES A CCORDING TO THE V ERMONT D EPARTMENT OF H EALTH We concede that most nuclear emergencies for which we have been prepared for decades during reactor operations are not going to occur, and the resources needed for response and recovery may be scaled back. We maintain that zero resources is not the appropriate amount to which the state and locals should scale back.

W HAT K INDS OF R ELEASES ARE P OSSIBLE ? Leaks or release of radioactive materials inside structures, systems and components left in SAFSTOR into the air or soil. Causes include: Transportation accidents; An air release due to the combustion of radioactive materials by fire; Loss of container integrity by the effects of natural phenomena like flooding or earthquakes; Hostile actions, including ground or air attack. Groundwater carriage of radioactive materials in soils on site from: Past leaks Stack fallout Surficial spills

W HAT W OULD W E R EALISTICALLY N EED We should continue to independently monitor environmental media around the station Helps us identify contaminants from the very large quantity of radioactive materials stored on site until the facility is decontaminated and dismantled and the NRC license is terminated. Projected for 2072 in the PSDAR. Keeps our sample collection and analysis skills which we would need should there be a release fortified through periodic training. Maintain the capacity to measure hard-to-detect radionuclides like strontium-90 and transuranics. Both were significant concerns at other decommissioning sites. The Department of Health can develop a scaled-back budget for what is appropriate during SAFSTOR and DECON.

T HANK YOU ! Q UESTIONS ? WILLIAM. VERMONT. GOV