PDO NORM Storage Facilities

Slides:



Advertisements
Similar presentations
AND OTHER ACCESS RESTRICTIONS
Advertisements

Radiation Safety Training Rights and Regulations. Washington State University Radiation Safety Office.
P R E S E N T.  We appreciate the opportunity to introduce you to our water based, (not petroleum or acid based), chemicals that dissolve the paraffin.
Naturally Occurring Radioactive Material Supervisors Training Course
Mini A Probe (Gamma detector)
Options for Disposal of Active Material Dr. Brian Heaton Aberdeen Radiation Protection Services Ltd.
Hazardous Materials Management Presented by. James E. Roughton, MS, CSP, CRSP, CHMM.
Safety on Call HAZARDOUS MATERIALS MANAGEMENT. Safety on Call HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER) 29 CFR
Low-Level Waste Advisory Committee Meeting October 2, 2014 TENORM Study Update 3 rd Quarter Tom Corbett, Governor E. Christopher Abruzzo, Secretary.
21 –23 Feb 2005NORM Workshop 2005 PDO NORM Management System Brett Young.
Ivan P. Salati de Almeida Director of Radiation Protection and Nuclear Safety Brazilian Nuclear Energy National Commission- CNEN September 2012 Small Scale.
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
Developing a Chemical Risk Management Program
AL FURAT PETROLEUM CO. NORM MANAGEMENT SYSTEM
The RTD Group NORM TRAINING: Increasing Awareness, Reducing Exposure Richard van Sonsbeek Röntgen Technische Dienst bv Dept. Radiation Protection Services.
Kathy Metropulos Division of Drinking and Ground Waters Protecting your aquifer: What to consider when drilling oil and gas wells.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
1 Safety & Occupational Health LCDR Kenneth “KP” Pounds IH w/ Gulf Strike Team D-8 Response Div Federal On-Scene Coordinator Representative Training.
Module 3: PPE 3.1 Hazard Assessment Susan Harwood Grant Number SH F-23.
1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.
WORKER SAFETY Radionuclides Web Cast August 4, 2004 Loren W. Setlow Office of Radiation and Indoor Air
Waste Management in PDO Corporate Environmental Advisor
Managing NORM - Oman and Regional Issues
ENVIRONMENTAL SAFETY – SPILL MANAGEMENT TRAINING August 2009.
Session IV Chemical Storage Signage Chemical Inventory Physical Storage Storage Room Environment Waste Management Material Safety Data Sheets.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
21 –23 Feb 2005NORM Workshop 2005 Costs of Managing NORM Brett Young.
Oman & PDO NORM Regulation and Specifications
SHE Code 31: Controlled and Hazardous Waste Safety, Health and Environment (SHE) Group.
Version One Naturally Occurring Radioactive Material Awareness Training Course.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
Unit 5.6 Evidence and Sampling.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
21 –23 Feb 2005NORM Workshop 2005 Controlling Exposures Brett Young.
Some points on management of waste resulted from decontamination State agency on the Exclusion zone management L. Zinkevych Kiev June
HAZWOPER Management and Supervisor. Personnel responsible for safety/health v Personnel and alternates responsible for safety and health v May vary according.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
 Radiopharmaceuticals are agents used to diagnose certain medical problems or treat certain diseases. They may be given to the patient in several different.
1 Safety Issues for the n-TOF target Thomas OTTO, Radiation Protection Group, SC-RP, CERN.
【機密性2、機構内限り 】 Phase to start waste management Main RN OriginWaste typeWaste quantity Site/Operator/ Intention to carry out waste management Temporary Storage.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
F & A Advisory Group. Background Over 80 labs vacated as part to the ISC move and another 14 labs will be moving to University Hall These labs and ancillary.
Management and Safe Disposal of Radioactive Waste Sulaiman Al Hinai Industrial Hygienist Petroleum Development Oman LLC.
Regional Workshop on Waste Management and Safe Disposal of Radioactive Waste - Tunis, Tunisia; March 2014 Management of Radioactive Waste in Jordan.
End disposal of petroleum industry NORM in Norway - Stangeneset NORM Disposal Site Per Varskog, Norse Decom AS Egil Kvingedal, Wergeland-Halsvik AS EAN.
Page 1/28 Health Course Introduction Organization of radiation protection and exposure control measures for "work activities" in the oil and gas production.
NORM: Radiation Surveys (an Attempt for Source Inventory) Gert Jonkers Engineering & Analytical - GSEA/4 “ Problem Solving ” (Shell E&P Ionising Radiation/NORM.
Introduction Radioactive waste in Iraq arises mainly from decommissioning of destroyed nuclear facilities and waste related to previous nuclear research.
Mu2e Target Hall Remote Handling - Contamination Control, Schedule, Risk & Conclusions Ryan Schultz Deputy L3 Manager Target Station 11/17/2015.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Radioactive Materials Licensing Authorizing licenses for: Low-level radioactive waste disposal By-product material disposal Public water system NORM waste.
Gasunie ranks among the largest gas infrastructure companies in Europe. Safety is a top priority within Gasunie; it forms the basis of our “licence to.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Responsible Conduct of Research: Safe Laboratory Practices Jill M. Daniel Neuroscience and Psychology School of Science and Engineering.
THE NEWLY DESIGNED SUZA II EQUIPMENT FOR SLUDGE IMMOBILISATION
Environmental Assessment
Beware of hazards around you
Site Based Preconstruction – Site Set Up
Safety and Security of Radiation Sources
Labeling Requirements
Gasunie is one of the biggest gas infrastructure companies in Europe
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
SITE SPECIFIC INFORMATION Brooks Drive, Dandenong
SITE SPECIFIC INFORMATION MARIA ST SITE, VIC
Radiation Protection Handbook
29 - HAZWOPER
Presentation transcript:

PDO NORM Storage Facilities Ahmed Al-Sabahi Corporate Environmental Advisor

PDO NORM Storage Facilities PDO Has two Storage facilities: Zualayah Storage area Bahja Storage Facility

Storage of Radioactive Materials SP-1170 All NORM contaminated items or materials must be taken to the PDO designated storage site in Zauliyah as soon as reasonably practicable. The NORM storage area must comply with the following: The NORM storage areas must be protected with proper fencing and security so that uncontrolled entry is not possible. There must be proper signage (pictorial and written in English and Arabic) around the fence so that the hazards are understood by everybody. A contour of dose rates for the site shall be available through the supervisor. People who are given access to the site are briefed on the location of hazards. The key for access to the site must only be issued to authorised personnel and must be signed out and back into the custodian’s control. The dose rate outside at the fence of the storage facility shall not exceed 2.5 1 Sv/hr.

Zauliyah Storage Facility In 1994 a pig sample from Hasirah – Zauliyah line was found to have radioactive reading above background level comprehensive survey for Naturally occurring radioactive material (NORM) was conducted in Zauliyah station high contamination reading were observed and materials. This discovery lead to have a NORM storage area in Zauliyah.

What we are storing in Zualiyah Tubulars Contaminated Sludge ( in Drums). X-Mass trees Cables Scrap metals The NORM radioactive material prior to being placed in the storage were cemented and solidified, in thick numbered steel drums and transferred to an enclosed, top open wall (10L*15W*1.5H)

Zauliyah NORM Storage Yard 10” -Zualiyah- Sahmah line 6” Sahmah -Zualiyah line 8” Hasirah -Zualiyah line Drainage pit TANK MAIN GATE Contaminated tubulars- Total number-2675 End capped and parts that are rusted covered with polyethylene Water disposal line NORM Storage Yard

Some of the drums in the Storage

Contaminated tubular from Zauliyah –5

Present NORM Storage Facility AD Hoc facility set up in Zauliya Does not meet required standards or specifications Licensed but threat of license revocation exists due to standards breaches. Increasing quantities have increased dose rate to dangerous levels RAC (Radiation Advisory Committee Approved Setting up permanent facility

NORM DESIGNATED AREA-PDO NORM CONTAMINATION =10 c/s Dose Rate= 0.11-0.29mSv/h RADON in Gas= 66Bq/m3 NORM CONTAMINATION = 0 c/s Dose rate = <0.10mSv/h RADON in Gas = 61 Bq/m3 MAF NORM CONTAMINATION = 400 c/s Dose Rate = <0.33-0.47mSv/h LKH-128L=660 Bq/g LPS-T-2612=260Bq/g LEKHWAIR Mazoon DHULAIMA NORM CONTAMINATION = 20 c/s DOSE RATE = 0.12-0.25mSv/h RADON IN GAS - 66 NORM CONTAMINATION = 60 c/s Dose Rate= 0.22-0.27mSv/h RADON in Gas= 435Bq/m3 NATIH FAHUD YIBAL NORM CONTAMINATION = 0 c/s Dose Rate= <0.12mSv/h RADON in Gas= 407Bq/m3 NORM CONTAMINATION = 0 c/s DOSE RATE = <0.12 mSv/h RADON IN GAS - 86Bq/M3 AL HUWAISAH MUSALLIM SAIH NUHAYDA TAWF DAHM SAIH RAWL G.NORTH NORM CONTAMINATION = 60 c/s Dose Rate= 0.25-0.50mSv/h RADON in Gas= 107Bq/m3 NORM CONTAMINATION = 18c/s DOSE RATE = 0.19-0.25mSv/h RADON IN GAS =317 Bq/M3 MABROUK QALN-ALARM BARIK AL-GHUBARA NORM CONTAMINATION = 2500 c/s DOSE RATE = 1.99-2.40mSv/h RADON IN GAS -44Bq/M3 ZL-5 =592 Bq/g NORM CONTAMINATION = 0 c/s DOSE RATE = <0.12mSv/h RADON IN GAS = 260Bq/m3 ZAULIYAH HASIRAH ANZAUZ NORM CONTAMINATION = 0 c/s DOSE RATE = <0.12mSv/h RADON IN GAS= 47Bq/m3 NORM CONTAMINATION = 20 c/s DOSE RATE = 0.15-0.20mSv/h WAFRA WAFRA-10 = 1110Bq/g HASIRAH- ZAULIYAH LINE-CONTAMINATED LINE = 60 c/s SUWAIHAT SAYYALA BAHJA NORM CONTAMINATION = 20 c/s DOSE RATE = 0.12-0.15mSv/h RADON IN GAS = 43Bq/m3 NORM CONTAMINATION = 60 c/s DOSE RATE = 0.15-0.18mSv/h NORM CONTAMINATION \ = 15 c/s DOSE RATE = 0.12mSv/h RADON IN GAS = 46Bq/m3 SADAD MUKHAIZNA NIMR NORM CONTAMINATION = 30 c/s Dose Rate= <0.18-0.24mSv/h RADON in Gas = 53 Bq/m3 NORM CONTAMINATION = 0 c/s DOSE RATE = <0.12 mSv/h RADON in Gas= 430Bq/m3 AMIN SIMSIM NORM CONTAMINATION = 20 c/s Dose Rate = 0.12-0.25mSv/h RADON in Gas - N/D AMAL MARMUL AL BURJ RAHAB THULEILAT QAHARIR LE G E N D Specifications. NORM contamination- reading 3 times the back-ground on the contamination meter is a NORM trace or NORM suspect area.- NORM area - Area confirmed to have materials with quantitative radioactive level of more than 100 Bq/g Dose rate-Accepted limit is below 2.5mSv/h PPE should be used when dose rate is above 7.5mSv/h. Contamination reading are back-ground subtracted Note-NORM traces area,procedures must be followed c/s-counts/seconds Bq/g -Becquerel/ grams Bq/m3-Becquel/ cubic meter Sv/h - Sievart/hour NORM AREA NORM AREA NORM TRACES NORM TRACES Oil pi pel in e Gas pi pe lin e LAST UP DATED ON 24/02/99 - Compiled and prepared by RASHID AL-ZAKWANI-TKL2B Interior-Radiation-Focal-point

Issues Due to Lack of NORM Storage Many Tanks cleaning delayed Mounting Inventory of NORM materials Non compliance to HSE-MS or ISO-14001 Potentially serious HSE risks

Present NORM Inventory Expected drums = 7000-8000 Down hole equipments = 40 – 50 pieces (about 4 meters length) Tubing’s (3/4”) = 20000 pieces. Pipes = 50 pieces (different sizes and lengths). X- Mass trees = 10 pieces. Cables ( down hole work) = 3000m Suspected NORM Sludge = 1500m³

NORM Strategy Storage Facilities in Bahja as per SP-1170 MRME constructing NORM disposal facility in 2 years Operation of facility to be managed by Waste Management Contractor

Storage Facility Details Total Area – 400m x 400m All the area should be lined Temporary storage for the incoming sludge Toilets Equipment & PPE Store Drummed sludge only - (50 m x 25 m x 0.4 m area) Contaminated equipment (tubulars, esp’s) - (50 m x 25 m area) Scrap material/metals (50 m x 25 m area) Dedicated concrete pits for storage of liquid/bulk sludge from tanks (100m*100m*1m)

NORM facility 400 m Entrance * Concrete pad Rest Room & Toilet 400 m 100 m x 50 m Rest Room & Toilet 400 m gate 2 Pits Sludge Storage 100m*10m*1m depth Source Pit Tublars 50m x 25m Scrap metal 50m x 25m Drum storage 50m x 25m Note:- * Not decided yet due to change in design basis. CSM32 to advise

Project Phases Phase 1 project started in June & was completed in August 2004 as per agreed plan. Preparation of the site Fencing of the site Phase 2 under construction and target completion Dec.’04. Two HDPE lined pits being built Tubular Area Metal Area Drum Yard Source Pit Toilets Phase3 will be mid June 2005 and it will include for additional 4 pits & decontamination area Initiate development of decontamination facility Determine and agree on long term disposal options for NORM Tender out the design for the decontamination facility

1st PIT

2nd PIT

TUBALAR AREA

METAL AREA

DRUMS YARD

SOURCE PIT

Rest Room