Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section.

Slides:



Advertisements
Similar presentations
Site Grading Site Grading Civil Engineering and Architecture
Advertisements

Measurement for Civil Engineering works
CTC-275 Construction Methods
PIPE CULVERT By CH. VENKATARAMAIAH.
Earthwork Operations & Equipments
Highway Engineering Pavement Types
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
HIGHWAY ENGINEERING AND TRAFFIC ENGINEERING CENG 95.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
ROADS. Roads Introduction Transportation engineering is one of the most important branches of civil engineering. Transportation means conveyance of human.
Carpentry Skilled Trades 1201 Footings and Foundations.
Foundations and basements
E4014 Construction Surveying
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
PAVEMENT DESIGN. Introduction Pavement design is the major component in the road construction. Nearly one-third or one-half of the total cost of construction,
Highway Engineering Code No. (CM 304) Lec. 1.
Geosynthetic in Road Pavement and associated Works
Chapter 3 Compaction. To improve the density and other properties of soil Increases the solid density improves strength Lowers its permeability Reduces.
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
Roman Roads Notes October 2, 2013 You write:. Via – the Latin word for road.
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
PPT Installing Dry Stack Stone 1 PPT PROCEDURES TO INSTALL DRY STASCK STONE.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Earthwork: Use of Fine Grained & Granular Material.
Chapter 18 Foundations.
Sanitary Engineering Lecture 16
CONSTRUCTING A FIVE CABIN LATRINE
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Intro to Concrete 18.0 & 19.0 Class notes.
Wes Marshall, P.E. University of Connecticut March 2007
Pavement Analysis and Design
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
CAISSON FOUNDATION.
Preparing Foundations for Cylinders & ASME Tanks
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA CVE 409 HIGHWAY ENGINEERING.
Road Construction Technology
Civil Engineering Department Design of Nablus Tulkarm Highway Prepared by Ahmed Mohammed Mustafa Anas Zeyad Belbeasi Under the Supervision of Dr. Khaled.
Soil Compaction Topic I Topic I.
Highway Subgrade (1) Introduction
Pavement Types Dr. TALEB M. Al-ROUSAN.
Bases, Subbases, & Low Cost Surfaces Dr. TALEB M. AL-ROUSAN.
بسم الله الرحمن الرحيم AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Evaluation, Design and Redesign Beit Wazan and.
TRANSPORTATION ENGINEERING
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
BUILDING CONSTRUCTION
Soil cement   1 1.
PRESENTATION ON FOUR WEEK SUMMER TRAINING AT PWD GORAKHPUR
Highway Network System
DESIGN OF FLEXIBLE PAVEMENT
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
COMPACTION BY EQUIPMENTS
DO NOT SCARIFY SUBSOIL WITHIN TREE PROTECTION AREA OR DRIPLINE
GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
HIGHWAY MAINTENANCE Failures in flexible pavement.
Introduction to Pavement Design
FBE05 – Mathematics and Statistics
Pavement Structural Analysis
Pavement Structural Analysis
Earth and Rock fill Dams
Light Compaction Equipment
Presentation transcript:

Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section of ancient road 1) Three courses (bottom-up) A layer of broken stones A layer of small stones mixed with mortar A wearing course of massive stone blocks 3. Construction of ancient roads 1) a trench was excavated first so the finished surface would be at ground level; 2) a layer of small broken stones was placed at the bottom of trench; 1 Monday, May 30, 2016Monday, May 30, 2016Monday, May 30, 2016Monday, May 30, 2016

Introduction 3) the layer of small stones mixed with mortar and firmly tamped into place; 4) the wearing course of massive stone blocks was set and bedded in mortar 4. Highway, turnpike, toll road, expressway, freeway II. *Construction of modern roads 1. Project Appraisal 2. Plan the route (alignment design):Plan the route (alignment design) 1) Determination of OD, control stations, control stakes, and the like 2) Determination of width of highway, the number of driving lanes, the number and location of entrances and exits, and the essential strength of the road on the basis of the traffic volume 2 Monday, May 30, 2016

Introduction 3. Test earth foundation: 1) Strength test: density, moisture content, draining ability 2) Preparation of soil for foundation: thickness of the road layers (depth), aggregates proportion and their designated particle sizes 4. Cost estimate: how much work needs to to done (earth and rock quantities, steel, concrete, plants and equipment, overheads, salaries, and others); 5. Foundation construction: first remove the top layer of trees, plants, and organic materials; then excavate earth and/or rocks; and finally fill and compact the fillings till the roadbed meets the specifications. 6. Drainage problems: cross slope, longitudinal slope, side ditches, blind drains, culverts, inception drenches, impervious layers against capillary action and frost heave 3 Monday, May 30, 2016

Introduction 7. Earth-bound macadam surface: a bottom layer 10 to 20 cm thick of larger stones; an upper course about 8 cm thick of smaller stones 8. Types of pavements: rigid pavement (concrete) and flexible pavement (asphalt/ bitumen, tar, or heavy oils) III. Questions: 1. How is a modern road built? 2. What plants are used in a modern road construction? Name at least five. 3. What’s the difference between highway, street , road , way, path , track , trail, avenue, lane, alley, pavement/sidewalk, and boulevard?highway, street , road , way, path , track , trail, avenue, lane, alley, pavement/sidewalk, and boulevard? 4 Monday, May 30, 2016