Altoona Outdoors. A Non-Profit Group with a mission to: Encourage Healthy Lifestyles in and around Altoona 2-3 year project: Complete a Trail System in.

Slides:



Advertisements
Similar presentations
E X P E R I E N C E Y O U R A M E R I C A Challenges and Opportunities for Bicycling and the NPS Bob Ratcliffe Chief Conservation, Recreation and Community.
Advertisements

Aspen Falls Park Development Land Acquisition for Parks One Minute to Start.
Cowlitz Regional Trails Plan. Introduction Cowlitz County Parks Facilities Plan Cowlitz County Parks Facilities Plan Cowlitz County Bikeway Plan Cowlitz.
Borough of Carlisle, PA Smart Transportation Projects SCORP Technical Advisory Committee November 18, 2010.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
Titusville to Edgewater Bike Loop PD&E Study
Citizen Survey Results. Mecklenburg County Citizen Survey  Questions on full range of usage, customer satisfaction, needs, unmet needs, and priorities.
Shared Road Markings “Sharrows” For Bicycles Max Starcke Park Connection to the Future TxDOT Hike and Bike Trail.
The Great Ohio Lake-To-River Greenway PICTURE THIS…. An 100 mile-long green band of protected open space running through fertile farmlands, lush woodlands,
Public recreation sites (Municipal) Public recreation sites (County) Pleasant Valley Park BERNARDS TOWNSHIP PARKS AND TRAILS Dunham Park Whitenack Woods.
Beech Mountain Recreation 87% Increase 250 Passes Buckeye Recreation Center Summer 2010 Numbers Passes Sold.
December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
If the railway is no longer feasible, Then we have a decision to make.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Space Coast Loop Trail - Brevard County
The Appalachian Trail (AT) is one of the longest continuously marked footpaths in the world and a popular outdoor resource on the East Coast. Winding roughly.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Ontario by Bike Workshop April 16, 2015 Lambton College.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
The Bull Shoals City Park and Freedom Trail A GPS Project Mapped By: Mark Dombkowski Mike LeCompte.
11/01/04 - DRAFT1 King Bridge Partnership A partnership of The Kingfield and Bryant Neighborhood Organizations.
Parks and Recreation Division October 2, 2012 IMPACT FEE FUND UPDATE.
Location: East of the Visitor Center and Scenic Loop on Calico Basin Length: ½ mile round trip Difficulty: Easy; wheelchair accessible Estimated Minimum.
Lompoc Community Assessments “What We Learned” Presented by Judy Taggart MS, CHES March 25, 2010.
Vision Investment Proposal. Meeting Vision Renewal Goals QUALITY OF LIFE CONNECTIVITY HEALTH.
HIKE ASPEN FALLS Guide to hiking and walking paths in and around our city.
“Connecting Our Communities” January 6, Mission “To encourage the creation of trails and greenway corridors, parks, and preserves in order to enhance.
School Bike Route Analysis City of Seattle Michael Houston CEE 424 Final Project.
LULA GREEN ROAD UNION, SOUTH CAROLINA Jerry A. Brannon, Sr.,PE Union County Engineer.
Phase 2: 30% Design Plans September 4 th, 2012.
Southeast Michigan Council of Governments. SEMCOG Region St. Clair Macomb Oakland Livingston Washtenaw Wayne Monroe.
City Leadership & Bike Edina Task Force Annual Work Session February 16 th, 2010.
Our Trail Journey So Far and The Adventure Ahead.
Effective Active Living Strategies – Tools to Improve Community Health & Vitality Carver County Active Living September 24 th, 10am Tracy Bade, Public.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
City Leadership & Bike Edina Task Force Annual Work Session June 7 th, 2011.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
Is Our Water Safe to Drink? By Kylee, Zaliyah, Dorothy, Malik, Charonjia.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
 Woodcock Creek Lake Anne Grill Vtrip Extra Credit.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
White County Greenways Trails and Byways Presentation.
Ped/Bike Crossing to Pigs Eye Presentation by the District 1 Community Council.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Greenway Connectivity Soft Trails Road Trails Shared Use Trails.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
City of Woodstock Trail Watch Program City of Woodstock Parks and Recreation Department.
Naperville Park District Outdoor Recreation Opportunities.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Project Name County: X (Cuyahoga District #) Photo Type (All-purpose, Mountain Bike, Bike Lanes, etc.— pavement must be dedicated for non- motorized use.)
FY 2011 Pathways Construction Priority List City Council January 4, 2011.
Parks, trials and recreation opportunities are a fundamental part of every good community. The City of Midway is very fortunate to be located in an area.
Transportation Initiative Sales Tax Prioritization
What led to Temple Hill Road and Nirvana Gardens?
CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT
Your name, group, a member of the Circuit Trails Coalition
Multi-Use Trail Proposal
Crossing Lake Washington
Citrus Park Drive Extension
Seeking to create a concept. Mission for the deparment.
Keeper 1: Estimating Crowds SAS 1 #1 & 2
City of Wilmington Bike Plan Update
Construction Management & Engineering
PRO Plan Update Definition of Park Facility Types
Heart of Florida Loop East Section
“The North Crossing” Accessible Connection from Rideau Heights to Kingscourt and the Downtown.
Keeper 1: Estimating Crowds SAS 1 #1 & 2
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

Altoona Outdoors

A Non-Profit Group with a mission to: Encourage Healthy Lifestyles in and around Altoona 2-3 year project: Complete a Trail System in and around Altoona This year: Build trails: –Lake Road –Otter Creek

City Trail Plan

Lake Road Project 2006 – with your help Extends the entire length of Lake Road Off-street - in the City’s right-of-way - south side. 10 foot wide asphalt Estimated Cost: $209,100 50% grant-funded from the DNR 50% funded by Altoona Outdoors with the help of your donation

Otter Creek Segments 2006 with your help Starts at Spooner Road at Centennial Park On-and off street Connects to Vernon Street Connects into the Otter Creek Footpaths Estimated Cost: $100,960 50% Grant-funded by the DNR 20% by the City 30% by Altoona Outdoors with the help of your donation

2-3 year goals A safe, 7-mile Fitness Loop around Altoona Safe recreation for all Altoona residents Safe passage to schools for Altoona students Connect all Altoona parks Connect with Eau Claire City and County trails

Fitness Loop

Connect to the Eau Claire City and County Trails

Safe Transit to School

Please support Altoona Outdoors!