1 Open season 2015 11 th IG Meeting 26 th March 2010 Paris.

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 July 2007 Gas Interconnection between Spain and France Comments to the TSO’s document on the analysis of the future interconnection infrastructures needed.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
31st IG meeting 26th February 2015
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
GRI NW Investment Cross border investment Dublin 19 May Bid Capture Process Adam Cooper & Mike Young.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
26th IG meeting 23th January 2014
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
Results of the First Phase of the OS 11th IG meeting
ERGEG South Gas Regional Initiative
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
26th February 2015 Teleconference
24rd SG meeting 8th february 2018
Enagás, GRTgaz, REN and TIGF
26th February 2015 Teleconference
RO-HU-AT - a pilot project for incremental capacity
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

1 Open season th IG Meeting 26 th March 2010 Paris

2 Capacities offered GWh/dSouth  NorthNorth  South GRTgaz North  GRTgaz South 160 (100% of incremental capacity +80 GWh/d existing capacity) 160 (80% of incremental capacity) GRTgaz South  TIGF 55 (capacity not allocated during 2013 OS) AND 184 (80% of incremental capacity) 100 (without additional investment : capacity not allocated during 2013 OS) OR 144 (with additional investment : CS at Montpellier) Perthus interconnection : TIGF  Spain 184 (80% of created capacity) 144 (80% of created capacity) Biriatou interconnection : TIGF  Spain 48 (80% of incremental capacity) 48 (80% of incremental capacity)

3 Localisation of the infrastructures

4 Total costs on the French side TIGFGRTgaz Perthus interconnection Perthus-Barbaira pipe : 234 M€ CS Barbaira : 40 M€ Lupiac-Baran pipe : 40 M€ Eridan (pipe, CS and interconnection stations): – 50% of the costs –302 M€ CS Montpellier : 80 M€ Biriatou interconnection Arcangues-Coudure pipe : 110M€ Link GRTgaz South/GRTgaz Noth Bourgogne pipe = 398 M€ European subsidies 74 M€

5 Economic test to validate capacity allocation MidCat Based on the coverage of the investments costs by the revenues generated by the long term commitments collected through the OS 2015 Proposal: validate the investments if 70% or more of the costs are covered Limit scenario for capacity demand: –100% of the capacity offered Spain  France is requested –0% of the capacity offered in the other direction is requested  With the current tariff the economic test for MidCat is not validated : only 44% of the costs are covered  To validate the economic test, an increase of the entry tariff into France of + 50 €/MWh/d/y is needed

6 The same analysis has been done for Biriatou and GRTgaz North  GRTgaz South  With capacity requests in only one direction, the economic test is validated with the current tariff for these two points When applying the economic test at the interconnection between Spain and France, the priority will be given to MidCat over Biriatou Economic test to validate capacity allocation Biriatou and GRTgaz South  North

7 Possible phasing of the OS 2015 – For discussion Shippers active in France would prefer the OS to be organised in 2 steps –Offer and allocation of the 5 product sold in the OS 2013 –Once these 5 products allocated, then offer and allocation of GRTgaz North  GRTgaz South  Would allow shippers to assess whether there is a need for additional supply of the South coming from the North before making long term commitments, or not, for GRTgaz North  GRTgaz South  Would also avoid over-investment Shippers active in Spain would prefer sticking to the rule established in the former information memorandum, i.e. having the 6 products allocated at once  In order not to reveal commercial information before shippers bringing gas from the North  Stakeholder’s views requested

8 Coordination – For discussion The possibility to coordinate requests proposed in the OS 2013 bears the risk that no capacity is allocated at the interconnection Spain  France even if there is enough capacity requested, in case no capacity is allocated between GRTgaz South and GRTgaz North If shippers do not agree with taking this risk, they should raise their concerns

9 Capacity GRTgaz North  GRTgaz South to be offered It is envisaged to offer 160 GWh/d in both directions Decision to be made by CRE in April 2010