Cost Effective Drainage Structures Henry J. “Hank” Gottschalk, III Technical Resources Engineer Virginia Concrete Conference March 2010.

Slides:



Advertisements
Similar presentations
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advertisements

ODOT Structure Project Manager Training
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
RESEARCH PROGRAMS Culvert Liners High Value Research Sue Sillick Montana Department of Transportation July 2011.
County Transportation System Governor’s Transportation Advisory Committee September 14, 2012 Abbey Bryduck, AMC Policy Analyst.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 1 of 18 Asphalt.
September 24, 2012 Genesee County Road Commission Dye & Court Roundabout Dye Road and Court Street Roundabout Construction John Daly, Manager-Director.
TEXAS TRANSPORTATION August 2012 The Honorable Larry Phillips Chairman, House Committee on Transportation.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Current as of: Feb.06, New Economic Recovery Package: Not the Cure Federal government is working on a one-time economic recovery package Package.
Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State Our roads are used by you to get to work,
Regional and Short Line Railroads
Gwinnett County’s Post Development Stormwater Management Program
Life Cycle Implications of ECC- Bridge Components Andrew Shuck May 3, 2010.
Life Cycle Cost Analysis
Plaza Shrinks The Times Herald March 24, 2009 By Mike Connell.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Motor Carrier Safety The Highway Safety Problem Safety in the Motor Carrier Industry Causes of Accidents Government Solutions Hours of Service Rules Drug.
Work Zone Safety Awareness. What is a Work Zone?  Work Zone is a term applied specifically to highway and road construction sites involving federal government.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State Our roads are used by you to get to work,
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
2009 Report Card for America’s Infrastructure Steel Manufacturers Association May 19, 2009 David Mongan.
Old Policy – which no one ever seem to have heard of.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
% Roads in poor condition Americans traveled 2.85 trillion vehicle-miles in While highway mileage is mostly rural, a majority of road travel (60%)
Economic Analysis: Applications to Work Zones March 25, 2004.
© LENZ Finance Management KG Sourcing and Financing Service of LFM Presentation for Ghanaian Delegation IHK Chamber of.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
Encouraging Transportation Investment Saginaw County Chamber of Commerce Percolator Breakfast May 2, 2013 Horizons Conference Center Rich Studley, President.
MML Capital Conference MML Capital Conference Director Kirk T. Steudle, P.E. Michigan Department of Transportation March 4, 2009.
Estimating Economic Impacts of Border Wait Times in the San Diego-Baja California Region February 24, 2006.
Oregon’s Work Zone Traffic Analysis Program FHWA Work Zone Rule Virtual Workshop November 6, 2008 Irene Toews, P.E. Oregon Department of Transportation.
AT THE CROSSROADS Building for the Next Generation Council of State Governments May 30, 2008 Lexington, Kentucky.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Presentation for Talking Freight, November 16, 2011 Debbie Bowden Freight and Economic Policy Analyst, Office of Freight and Multimodalism Maryland Department.
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
Dream career My plan is to learn about engine parts on cars and motorcycles. I want to learn about engine parts cause I like working on cars.
Keeping Texas in Business. Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State In part, our.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
USACE Asset Management Risk and Reliability Workshop Condition Index Definitions Primer Allen C. Estes United States Military Academy.
Transportation Operations Goals and Accomplishments Institute of Transportation Engineers 2001 Spring Conference and Exhibit Dr. Christine Johnson D irector,
There are 2 Types of Bridge Inspectors – Class B and Class A.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
Projects of Division Interest PoDI PoDI Plans. All SYP Projects.
Basic Hydraulics: Culverts – I
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Chapter 9 Capacity and Level of Service for Highway Segments
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
Geometric Design: General Concept CE331 Transportation Engineering.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Boulder Rock Drive Crossing Rehabilitation Project - Structure F-2  Major Roadway Crossing Culvert Replacement November 17, 2015.
Maintenance Management
Intelligent Maintenance Program
Chapter 12: Urban Transportation Policy “Everything in life is somewhere else, and you get there in a car.” E. B. White, One Man’s Meat, (NY: Harper &
There are 2 Types of Bridge Inspectors – Class B and Class A.
Durability of Concrete Pipe
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
Insert local association
A Look At Rigid & Flexible Pipe Products
Life Cost Analysis (LCA) 1. Premature Collapses
Presentation transcript:

Cost Effective Drainage Structures Henry J. “Hank” Gottschalk, III Technical Resources Engineer Virginia Concrete Conference March 2010

Financial Assessment of Drainage Structure Cost of supply

Bridge Systems

Culverts

Pipes

Drainage Inlets

Our only limitation is our customers’ imagination.

Horizontal Structures Conduit Structure

Purpose of vertical structure Connect pipes

Purpose of vertical structure Connect pipes Provide access

Purpose of vertical structure Connect pipes Provide access ASCE Photo Contest

Purpose of vertical structure Connect pipes Provide access

Shape

Round Vertical Structure

A s = x D(in)

Round Vertical Structure

Rectangular Vertical Structure

Financial Assessment of Drainage Structure Cost of supply Cost of proper installation & inspection

Highway Congestion Congestion robs our nation of productivity and quality of life –3.5 billion hours/year time delay –5.7 billion gallons of wasted gas/year –Total cost of $75 billion for the 75 urban areas 2010 FHWA Presentation - Reggie Holt, Sr. Bridge Engineer

Work Zone Safety Continued need for Accelerated Construction and methods to close fewer lanes TRB DCG Critical & Cross Cutting Issues,

Work Zone Safety As many as 1000 fatalities occur each year in roadway construction work zones TRB DCG Critical & Cross Cutting Issues,

Financial Assessment of Drainage Structure Cost of supply Cost of proper installation & inspection

Financial Assessment of Drainage Structure Cost of supply Cost of proper installation & inspection Maintenance

Financial Assessment of Drainage Structure Cost of supply Cost of proper installation & inspection Maintenance Service Life versus Project Life

U.S. Army Corps of Engineers No Engineering and Design Conduits, Culverts, and Pipes (31 March 1998) (1)CONCRETE- Most studies estimated product service life for concrete pipe to be between 70 and 100 years. Of nine state highway departments, three listed the life as 100 years, five states stated between 70 and 100 years, and one state gave 50 years. (2) STEEL - Corrugated steel pipe usually fails due to corrosion of the invert or the exterior of the pipe. Properly applied coatings can extend the product life to at least 50 years for most environments. (3) ALUMINUM- Aluminum pipe is usually affected more by soil-side corrosion than by corrosion of the invert. Long-term performance is difficult to predict because of a relatively short history of use, but the designer should not expect a product service life of greater than 50 years. (4) PLASTIC- Many different materials fall under the general category of plastic. Each of these materials may have some unique applications where it is suitable or unsuitable. Performance history of plastic pipe is limited. A designer should not expect a product service life of greater than 50 years. Excerpt from Para. 1-4 Life Cycle Design

Risk Assessment

Modes of Failure

72” Culvert Failure Cost = Up to $500,000 Major Highway CLOSED Business Profit Decrease Detour Longer Employee Commute Public Driving Confusion Officials Manning Roadblocks

The Economic Cost of Culvert Failure

User Delay Costs (Indirect Costs) Joseph Perrin’s Research: D = AADT * t * d *(c v * v v * v of + c f * v f ) Where: AADT = Annual Average Daily Traffic of the roadway which the culvert is being installed t = the average increase in delay or congestion the installation is causing to each vehicle per day, in hours d = the number of days the project will take c v = the average rate of person-delay, in dollars per hour v v = the percentage of passenger vehicles traffic v of = the vehicle occupancy factor c f = the average rate of freight-delay, in dollars per hour v f = the percentage of truck traffic

User Delay Costs (Indirect Costs) Average Established Delay Costs as of 2005, in Dollars: c v = $18.62 per person / hour of delay c f = $52.86 per freight /hour of delay Typical Traffic Assumptions: v v = 97% vehicle passenger traffic v f = 3% truck traffic v of =1.2 persons per vehicle A one-hour delay on a roadway carrying an Annual Average Daily Traffic of 20,000 vehicles costs the public over $450,000 every day.

Risk Assessment Modes of Failure

Financial Assessment of Drainage Structure Cost of supply Cost of proper installation & inspection Maintenance Service Life versus Project Life

It is unwise to pay too much, but it is worse to pay too little. When you pay too much, you lose a little money. When you pay too little, you sometimes lose everything, because the thing you bought was incapable of doing the thing it was bought to do. JOHN RUSKIN , renowned English critic, social commentator, and economist of the Victorian Age

Advantages of Precast Concrete Structures Cast and Cured in a Quality Controlled Environment Shows up at the Jobsite as a Structure Strength is All Ready “Built In” Just Set, Connect… and Go! Save Time & Money! Precast Concrete = Long Service Life