Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.

Slides:



Advertisements
Similar presentations
Japan/US workshop on Fusion Power Plants, with EU participation, January 2005, Tokyo PPCS Safety and Environmental Analysis presented by Neill P.
Advertisements

1 Summary Slides on FNST Top-level Technical Issues and on FNSF objectives, requirements and R&D Presented at FNST Meeting, UCLA August 18-20, 2009 Mohamed.
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
A Roadmap to the realization of fusion energy Francesco Romanelli European Fusion Development Agreement EFDA Leader and JET Leader 17 May 2013 Acknoledgments:
Fusion Power Plant Licensing and Waste Management by Antonio Natalizio for Presentation at the 9 th Course on Technology of Fusion Reactors at Erice (Monastero.
Associazione EURATOM ENEA sulla Fusione By Aldo Pizzuto Comparison of breeder blanket Design 9th Course on "TECHNOLOGY OF FUSION TOKAMAK REACTORS" – Erice,
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES Meeting April 22-23, 2002 U. Wisconsin, Madison Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT C L O S E S U P P O R T U N I T G A R C H I N G page 1 of 31 Overview of Reactor Studies in Europe David Maisonnier.
Safety Considerations for the EU DCLL DEMO Blanket Dario Carloni 2nd EU-US DCLL Workshop 14-15th November 2014 UCLA.
Oxidation of Graphite Walls: Preliminary Results from SOMBRERO Safety Analysis S. Reyes, J. F. Latkowski Lawrence Livermore National Laboratory Laser IFE.
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Design Basis Accidents (DBA) M. T. Porfiri – ENEA UTFUS-TECN (Frascati)
AL FURAT PETROLEUM CO. NORM MANAGEMENT SYSTEM
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
FNSF Maintenance and Research Strategy Siegfried Malang and Mohamed Abdou FNST Meeting held at UCLA, August 3, 2010.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT FUSION REACTOR RADIOACTIVE WASTES: results, recycling, open issues and R&D W.Gulden, S.Ciattaglia EFDA Close.
Power Plant Conceptual Studies in Europe
1CEA/DEN/CAD/DTN/STPA/LPC Kick off meeting 0ct TW6-TSL-002 : ORE TBM OCCUPATIONAL RADIATION EXPOSURE.
Fusion Blanket Technology
Index: Status report ENEA tasks (Dec 2005) EFDA Task TW4 TSS SEA slides 2,3,4 EFDA Task TW5 TSS SEA slides.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Estimation of storage capacity needed or limits. Comparison with existing storage facilities. Lise-Lotte Spontón TW5-TSW-001, D4 Final meeting, TW5-TSW-001.
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
Study on recycling of fusion activated materials: Identify activation levels, characteristics and decay time requirements of irradiated material (deliverable.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
Tritium and Safety Issues for Power Plants Lee Cadwallader Fusion Safety Program ARIES Meeting Bethesda, MD April 4-5, 2011.
ITER and Fusion Safety Aspects H.-W. Bartels, ITER Prague, 13.November 2006.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 24.
Laser IFE Meeting November 13-14, 2001 Crowne Plaza Hotel, Pleasanton, CA Work performed under the auspices of the U. S. Department of Energy by University.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Installation of a Plasmatron at the Belgian Nuclear Research Centre and its use for Plasma-Wall Interaction Studies I. Uytdenhouwen, J. Schuurmans, M.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the Tasks TW5-TSW-001, 001B, October 2006, UKAEA, Culham, UK Final meeting tasks TW5-TSW-001,
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
Development of tritium breeder monitoring for Lead-Lithium cooled ceramic breeder (LLCB) module of ITER presented V.K. Kapyshev CBBI-16 Portland, Oregon,
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
1 TW6-TSW-003 Kick off meeting EFDA Garching October 9 th, Kick off meeting TW6-TSW-003-D1 Watching activities: Study and analysis of detritiation.
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Revision of ORE assessment for port-interfacing systems – Garching, Comments from EFDA Physics Integration 1 Main recommendations Comments from.
Some technological problems of fusion materials management Boris N. Kolbasov a *, Laila El-Guebaly b, Vladimir I. Khripunov a, Youji Someya c, Kenji Tobita.
Fusion at SCKCEN. SCKCEN Foundation of Public Utility: created 1952, ~ 600 employees; turn-over ~ 80 M€/yr Reactors: safety, materials, instrumentation,
Garching, January 17th, 2006: L. Ooms EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste management.
7/24/011 TFTR D&D Status July 24, /24/012 Project Status The TFTR D&D Project will be completed on time and within budget.
US Participation in the
Vincent MASSAUT SCK•CEN and EFDA
E n v i r o n m e n t a l s o l u t i o n s f o r t h e e n e r g y i n d u s t r y Assessment, Treatment and Management of NORM in the Norwegian.
Preparation of activation experiments for ITER material characterization and data validation in the Deuterium–Tritium JET campaign T. Vasilopoulou &
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
US/Japan Workshop on Fusion Power Plant Studies
The Improvement of ALARA for the Steam Generator Maintenance
Presentation transcript:

Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006

PPCS Model AB FunctionMaterials PPCS Models Model A WCLL Model B HCPB Model AB HCLL Breeding LiPbBlanket Li 4 SiO 4 Blanket Be Blanket (n multiplier) S t r u c t u r e EUROFER Blanket In vessel shield Blanket Divertor In vessel shield HTS LTS Blanket (+ FW) SS 316VV ZrH HTS CuCrZrDivertor W Divertor (armour) WC LTS W alloy Divertor Co o l i ng Water Blanket Divertor VV LTS (cooling) He Blanket Divertor VV Blanket Divertor HTS

Model AB: Activation analysis R. Pampin UKAEA/ TW4-TRP-002 D2e, April 2005 ComponentReplacement schedule DivertorEach 2,5 years Blanket (incl. FW and armour)Each 5 years High Temperature ShieldEach 5 years Low Temperature ShieldLife time component (± 29 years) Vacuum VesselLife time component (± 29 years) TF CoilLife time component (± 29 years) ComponentT0T yearsT yearsT years BackFrontBackFrontBackFrontBackFront FW armour2.67E E E E-03 Blanket FW8.77E E E E-03 Blanket Breeder2.72E E E E E E E E-03 Blanket Manifold7.93E E E E-04 HTS5.85E E E E-04 LTS3.22E E E E-04 VV1.41E E E E-07 TF coil3.17E E E E-11 Divertor1.78E E E E E E E E-03 Dose rate Sv/h Replacement Schedule

Model AB: Activation analysis R. Pampin UKAEA/ TW4-TRP-002 D2e, April 2005 ComponentReplacement schedule DivertorEach 2,5 years Blanket (incl. FW and armour)Each 5 years High Temperature ShieldEach 5 years Low Temperature ShieldLife time component (± 29 years) Vacuum VesselLife time component (± 29 years) TF CoilLife time component (± 29 years) ComponentT0T yearsT yearsT years BackFrontBackFrontBackFrontBackFront FW armour2.67E E E E-03 Blanket FW8.77E E E E-03 Blanket Breeder2.72E E E E E E E E-03 Blanket Manifold7.93E E E E-04 HTS5.85E E E E-04 LTS3.22E E E E-04 VV1.41E E E E-07 TF coil3.17E E E E-11 Divertor1.78E E E E E E E E-03 Dose rate Sv/h Replacement Schedule

Time Scale Storage after irradiation Recycling of components separation recycling of materials refabrication and testing Storage awaiting reuse Reuse Stage 1: Temporary storage over a time period of maximum 5 years. The storage will be performed in the fusion plant and its major goal is to reduce the dose rate with 1 order of magnitude. Stage 2: Interim storage over a period of 100 years. The major goal for this on site storage is to reduce the dose rate (a few orders of magnitude) in order to perform off-site transportation. Stage 3: Final disposal (off site). Reference: A. Natalizio (ENSEC); In-vessel component storage, EFDA Task TW2-TRP-PPCS17 – Deliverable 4, dd Separation & recycling of materials (1 year). Refabrication & testing (1 to 2 years) Replacement scheme

Simulation of limits for HOR Limits defined in the past: 1000 Gq/g => 4 µSv/h => 6,4 mSv/y 10 µSv/h => 16 mSv/y (full exposure = 1600 h) Limits are very conservative (they meet the ICRP norm for the operators) The goal must not be to increase the limits (ALARA) A simulation with a reduced exposure confirms that materials must not be classified immediately in remote handling recycling if one applies: Shielding Reduced exposure Other measures to reduce the exposure of the operators First conclusion: 1.The limit for Hands On Recycling has to be kept at 10 µSv/h 2.Materials with a dose rate above 10µSv/h must not directly be classified as remote recycling

Simulation of limits for HOR Other remarks: 1.Using dose rates for limits between categories starting from HOR is much more logical than using specific activities. 2.On the contrary clearance based on 1 µSv/h has no sense, since pure beta-emitting isotopes can still exceed clearance limits. Therefore the principle of clearance index should be applied for those materials 3.Confinement of the workspace is inevitable, due to the Tokamak dust, Tritium…)

Remote Handling Facilities ► Dose rates of fusion components are acceptable for existing facilities ► The 5 years of temporary storage will reduce the dose rates of the components. ► But! What about build up after a second irradiation cycle ► The needed services are very specialised (testing and fabrication), precision ± 10 µm, ► Up to now only simple products were fabricated (melting) ► Confinement is unavoidable to protect the operators from internal contamination

Fusion classification

New proposal for Classification SRM is subdivided into two groups  Hands on recycling (dose rate up to 10 µSv/h)  Shielded recycling (dose rate between 10 µSv/h and 2 mSv/h) CRM + PDW becomes one group Remote Recycling (above 2 mSv/h) NAW (Clearance) is not defined by the dose rate of the materials but by the Clearance index. Clearance Ic < 1

Report: Precondition of the dose rate limits for recycling TW5-TSW-001 D2 SCKCEN: R-4377, , L. Ooms, S. Boden, S. Leblanc Draft available, final report after today’s discussion