1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
Analysis of the Virgo runs sensitivities Raffaele Flaminio, Romain Gouaty, Edwige Tournefier Summary : - Introduction : goal of the study / Overview on.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
“Detector activities” after the IB upgrade Michele Punturo.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
The VIRGO detection system
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Reaching the Advanced LIGO Detector Design Sensitivity
(Some) noise hunting issues at Virgo
Virgo Status Detector Status Computing Data Analysis status and Plans
Status of Virgo GWDAW Dec 13-16
Signal recycling R&D at LAL: Influence in Virgo
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Homodyne readout of an interferometer with Signal Recycling
GEO – VIRGO joint noise hunting project
Virgo – Injection SYStem
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Virgo Update – LSC meeting
Improving LIGO’s stability and sensitivity: commissioning examples
Status at the Prague meeting
Advanced Virgo ISC subsystem
Presentation transcript:

1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS

2 C6 (July 29th – Aug 12th) – Input power ~ 0.8 W – Partial automatic alignment – Science mode duty cycle 86% – Longest lock 40 hours – Best range for optimally oriented inspirals 0.5 Mpc – Automatic science mode recovering ~5 minutes C7 (Sept 14th - Sept 19th) –Input power ~ 0.8 W –10 d.o.f. automatic alignment and full hierarchical control –Science mode duty cycle 65% –Longest lock 14 hours –Best range for optimally oriented inspirals 1.65 Mpc –Automatic science mode recovering ~5 minutes C6 and C7 summary

3 Noise budget run C7 Shot noise Control noises

4 Short term milestones New injection bench commissioning and mode-cleaner restart Goal: Have a stable ~10 W beam transmitted by the input mode-cleaner ~ end of the year  See Paolo’s presentation Interferometer restart Goal: Measure a new sensitivity curve with high power interferometer ~ end of January

5 “Interferometer restart” milestones Full interferometer lock Differential mode automatic alignment Hierarchical control and low noise coil drivers Calibration and sensitivity curve measurement Beam alignment and beam matching  see Julien’s presentation North and west cavities lock and automatic alignment New PR transfer function and central area interferometer lock Full interferometer lock

6 Full lock - concerns Problems not fully understood or solved: frequency stabilization (SSFS) oscillations during lock acquisition (Seems to be connected with interferometer alignment) Offsets in the reflected signals Bistabilities (“jumps”) Problems related with the power increase: Stray light on the beam splitter Thermal effects ? (negligible from simulations) Problems related with new power recyling reflectivity (0.92  0.95) Not a problem from analytical computations

7 Linear alignment

8 Linear alignment milestones Differential mode (2 dof) 10 dof as C7 (all the mirrors under linear alignment except WI or BS) 12 dof (all the mirrors under linear alignment) 12 dof and beam control (injection bench controlled through B8 DC)

9 Noise hunting Shot noise at high frequency  increase the incoming power

10 Road-map for 2006 and 2007 Completion of recycled interferometer commissioning ~ 3 months (finish automatic alignment + refinement of other controls) Noise hunting ~ 4 months Science run I ~ starting during fall 2006 Shutdown (if needed) starting early 2007 ~ 2 months Noise hunting Science run II, starting second half of 2007

11 Goal for the first science run factor 10 in the optimally oriented inspiral horizon (1.5 Mpc  15 Mpc)  Priority f > Hz

12 Virgo design –M=0.017 A m 2 –Stainless Steel RM –Q eddy =1.8×10 8 Current design –M=0.05 A m 2 –Aluminum RM –Q eddy =9.4×10 5 Eddy currents problem

13 Noise hunting at high frequency Read-out noise (shot and electronic)  reach 500 W on the beam-splitter x 10 power Increase of recycling factor (R_PR: 0.92  0.95) Better input mode-cleaner matching Decrease losses between laser and mode-cleaner (better optical components on the laser bench)  See Edwige’s presentation Laser noises hunting: Frequency noise (Power increase and optimization of the servo) Oscillator phase noise (Marconi generator changed) Power noise at the modulation frequency (pre-modecleaner if needed) Power noise in the detection band (decrease acoustic couplings)

14 Noise hunting in the central region: actuators Virgo design

15 NE beam Noise hunting in the central region: Diffused light Many beams already dumped on end benches and external injection bench Experience with beam dumpers See Gabriele Vajente’s presentation in Perugia

16 Noise hunting in the central region: acoustic noise Acoustic mitigation in the laser lab on going All the racks with fan moved far from optical tables A coverage of the optical tables will be implemented in spring similar actions to the detection lab if needed

17 Shutdown after first science run Possible plans for the shutdown: Change beam splitter Change the mode-cleaner mirror Further acoustic mitigation Fix Eddy current problem

18 New beam splitter mirror IB WA NI wedge diameter now = 23 cm Increase size, new wedge Maybe increase reflectivity of 2nd face (increase SNR for pick-off signals)

19 New mode-cleaner curved mirror Defects in the MC curved mirror  losses ~ 800 ppm instead ~100 ppm The mirror can be replaced with a better one (and a bigger one?)

20 Second noise hunting phase Decrease also noise in the low frequency region (<50 Hz) and approach the design sensitivity Angular degrees of freedom noise  See Henrich’s presentation Longitudinal degrees of freedom noise Beam splitter noise Power recycling noise

21 Beam splitter noise reduction

22 Summary First sensitivity curve with high power ~ end of january Complete automatic alignment (12 dof + beam control) + refinements of other controls Noise hunting preparation on going (priority f>50 Hz) Science run during fall 2006 (goal 15 Mpc for optimally oriented inspirals) Plans for a shutdown in early 2007 Noise hunting at low frequency Second science run ( goal ~ Virgo design sensitivity)