2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.

Slides:



Advertisements
Similar presentations
Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
Advertisements

Residential New Construction (NC): Slab Insulation UES Measure Update Regional Technical Forum March 18, 2014.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Staff Updates Regional Technical Forum October 15, 2013.
Variable Frequency Drives (VFDs) for Potato/Onion Shed Fans UES Measure Update Regional Technical Forum April 23, 2014.
RTF 2012 Workplan Statements of Work January,
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
RTF Small / Rural Subcommittee Quarterly Meeting Wednesday, February 4, :00 am – 10:30 am 1.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
RTF Research and Evaluation Subcommittee Meeting Regional Technical Forum April 15, 2013.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
RTF 2015 Mid-Year Progress Report and 2016 Work Plan Jennifer Anziano Regional Technical Forum July 21, 2015.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
RTF Work Plan Mid-Year Re-Programming July 15, 2014.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Regional Technical Forum Future Funding Discussion November 22, 2013 RTF PAC Presentation.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Proposed 2013 RTF Work Plan October 23, compared to 2012.
Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures Regional Technical Forum November 19, 2013.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Staff Updates Regional Technical Forum March 20, 2013.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Proposal to Allocate Remaining 2010 Funding RTF November 2, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
RTF Administrative Measure Decisions November 14, 2012.
Display Case Motion Sensors Small Saver Measure Update July 16th, 2013.
Refrigerator Decommissioning: Next Steps for Measure Update March 18th,
Commercial Clothes Washer UES Measure Update Regional Technical Forum April 16, 2013.
UES Measure: Commercial – Traffic Signal LED’s Commercial – Traffic Signal LED’s Proposal to Change Status from “Under Review” to “Active” Regional Technical.
RTF Delivery Verification Guidance Batch 2 Jennifer Anziano Regional Technical Forum September 22, 2015.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
Research and Evaluation Subcommitee – 2014 Plans Regional Technical Forum January 22, 2014.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Staff Updates Regional Technical Forum May 21, 2013.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
RTF Work Plan Mid-Year Re-Programming June 19, 2012.
PHASE 1 UES REVIEW: PROGRESS UPDATE December 13, 2011 Regional Technical Forum Presented by: Jeff Romberger and Mark Kendall.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
Presentation transcript:

2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April 5, 2011

Deemed Measure Reviews 2

Deemed Measure Reviews SOW Goal – For the remaining RTF UES estimates, hire contractor(s) to: Review in detail the input assumptions and calculation methodologies; Document measures according to the Guidelines; and Make recommendations to the RTF on updated measure statuses. Current status of existing RTF UES Measures versus the RTF Guidelines: Potential for 3 Separate Contracts – (depending on responses) – Intent is to spread RTF work among multiple contractors to build base of “RTF- knowledgeable” contractors – Proposed Measure Category Bundling Residential Measures Grocery Measures All Other Measures UES Measure List ( rgy/rtf/measures/Default.asp) rgy/rtf/measures/Default.asp 3

Residential RTF UES Measures (those not yet reviewed against Guidelines and currently “unassigned”) Sorted by Sunset Date. Blanks have not been assigned sunset dates (they’re old measures). 4

Grocery RTF UES Measures (those not yet reviewed against Guidelines and currently “unassigned”) 5

“Other” RTF UES Measures (those not yet reviewed against Guidelines and currently “unassigned”) 6

Deemed Measures Review SOW Outline Review RTF Guidelines and recent measure history – Review previous Recommendation Memo(s) for similar measures, if any. (Looking for consistency, but not necessarily precedence) Inspect primary Excel measure workbooks and relevant linked workbooks for input assumptions, sources, and calculation methodology; compare to Guidelines. Present deliverables to subcommittee (in detail) for approval of proposed updated status – Finalize deliverables per subcommittee input Present a summary of recommendations to RTF (Goal: approval of updated status) – Finalize deliverables based on RTF decision 7

Deemed Measure Review SOW Outline (continued) Deliverables (for each measure) – Recommendation memo (follow SBW’s template) Summary Recommendation (Status according to Guidelines) Limitation of Review Additions made to Workbook Documentation Workbook Calculation Errors Recommendations for Updates – Workbook Structure and Formulas, Documentation, Measure Definition, UES Savings Estimation Method, and Input Parameters – Guideline Checklist – Revised Measure Workbook Add Summary worksheet Correct Errors Improve documentation of sources and calculation algorithms throughout workbook Update with latest version of ProCost and economic assumptions 8

That’s it for this SOW…So Then What? Many measures will likely be re-classified as “out-of- compliance” and will need further study/work: – Documentation and Errors Some improvements in documentation and error correction will be accomplished under the 2011 SOW, but more complex issues won’t fit within the budget/scope. – Field research/data collection This will not be accomplished under the 2011 project RTF will then prioritize which measures/studies to undertake. – This effort (prioritizing, scoping, and the actual updates) is expected to be a primary component of the 2012 RTF work plan (and probably beyond) 9

10

Deemed Measure Reviews Total Budget: $290,000 – Reminder: This work falls under the $500,000 “Deemed Measure and Standard Protocol Review” 2011 workplan. So far, we have allocated $210k to this overall effort. – The goal is to get a review/recommendation on all remaining UES measures. However, depending on actual costs, some review work may need to carry over to 2012 (proposal is to give priority to measures soonest to sunset) Proposed Timeline – Subcommittee to review SOW language before next RTF meeting – RTF review and approval of SOW at May meeting – Contracts in place by July – Draft deliverables available to subcommittee(s) in September – RTF Review/Decision on revised measure statuses in November and December What we need from the RTF Today – General Input for the SOW contents Head nods to proceed with SOW development at subcommittee level – General Input for the overall multi-year UES Measure update approach Head nods to proceed – Volunteers for a subcommittee to provide ongoing support and direction for this project First assignment will be to review the SOW language in 2 weeks (Then, select contractor(s), attend kickoff meeting(s), and review deliverables) 11

Measure Cost and Non-energy Benefits Guidelines Development 12

Measure Cost/NEB Guidelines Goal: Develop written guidelines to assist RTF in determination of measure cost and non-energy benefits. SOW Components Review in detail RTF measure costs and NEB’s for 20 UES measures – Reviewed measures should have a wide mix of different cost/NEB methodologies, including: residential clothes washers, residential refrigerators, commercial refrigerators, refrigerator recycling, weatherization, MH and SF duct sealing, ASHP’s, GSHP’s, ducts inside, grocery measures, residential new construction, CFL’s, commercial cooking measure, irrigation measures, industrial motors, network PC control Deliverables – Guidelines Applicable to UES, Standard Protocol, Custom, and Evaluated measures Allowable methods – Data requirements Documentation requirements – Cost/NEB Recommendation Memo’s for the 20 reviewed UES measures Similar to the memo’s for determination of UES’s Presentation of draft deliverables to the subcommittee – Subcommittee to make decision on its recommendation to the RTF to accept Presentation of revised deliverables to full RTF – Revise/Finalize based on RTF input 13

Measure Cost/NEB Guidelines Total Budget: $100,000 Proposed Timeline – Subcommittee to review SOW language before next RTF meeting – RTF review and approval of SOW at May meeting – Contract in place by July – Draft deliverables available to subcommittee(s) in August – RTF Review/Decision on Cost/NEB Guidelines in October What we need from the RTF Today – Input for the SOW contents – Head nods to proceed – Volunteers for a subcommittee to provide ongoing support and direction for this project First assignment will be to review the SOW language in 2 weeks (Then, select contractor(s), attend kickoff meeting(s), and review deliverables) 14

Measure Life Guidelines Development 15

Measure Life Guidelines Goal: Develop written guidelines to assist RTF in determination of measure life. SOW Components Review and document all existing RTF-assigned measure lives – Involves digging through RTF workbooks Often there are multiple measure lives for measures with multiple UES components Perform National literature review of: – Studies designed to determine measure life for efficiency measures – Non-RTF assigned measure lives for EE measures Deliverables – List of RTF-assigned measure lives – Memo summarizing literature review (including references) Electronic files of readily available studies – Guidelines Applicable to UES, Standard Protocol, Custom, and Evaluated measures Allowable methods – Data requirements Documentation requirements Presentation of draft deliverables to the subcommittee – Subcommittee to make decision on its recommendation to the RTF to accept Presentation of revised deliverables to full RTF – Revise/Finalize based on RTF input 16

Measure Life Guidelines Total Budget: $60,000 Proposed Timeline – Subcommittee to review SOW language before next RTF meeting – RTF review and approval of SOW at May meeting – Contract in place by July – Draft deliverables available to subcommittee(s) in August – RTF Review/Decision on Measure Life Guidelines in October What we need from the RTF Today – Input for the SOW contents – Head nods to proceed – Volunteers for a subcommittee to provide ongoing support and direction for this project First assignment will be to review the SOW language in 2 weeks (Then, select contractor(s), attend kickoff meeting(s), and review deliverables) 17