1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception 03 06 2015 EuroCirCol-1505271400 WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department Dr. Olivier BRUNNER (Deputy Coordinator) CERN, Beams Department 1 FCC Week
Damping Rings Y. Papaphilippou, CERN, D. Rubin, Cornell.
EuroCirCol Plan Overview Daniel Schulte for the EuroCirCol team CERN, June 2015.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Beam screens in IT phase 1
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department 1 FCC Week March, Washington (US)
FET-OPEN-RIA L. Quettier FET-Open - novel ideas for radically new technologies Deadline Date :00:00 (Brussels local time) Duration: 3 to 4.
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
The integration of 420 m detectors into the LHC
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
FP7: EuCARD after a year of preparation… A.Jeremie.
Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
WP4 Cryogenic Beam Vacuum System Conception: Activity LNF (task 4.4, 4.6) R. Cimino LNF-INFN, Frascati (Italy) 1.
Hosted at KIT (Karlsruhe Institute of Technology)
CLIC work program and milestones
HL-LHC IT STRING and Series test of SC link
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Study of vacuum stability at cryogenic temperature
Francis Perez (ALBA) and Paolo Chiggiato (CERN)
FCC summary report March 2015 Washington.
Some Thoughts About Possible Measurements with SR at DaFne
Challenges of vacuum chambers with adjustable gap for SC undulators
R. Kersevan, TE-VSC-VSM 30/06/2016
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Electron cloud & vacuum pressure observations: 2011 proton run
Hollow e- lens, Cryogenic aspects
Forming a Gender Equality Group
RECENT DEVELOPMENTS IN MODELING
Cryogenic temperature for SPPC
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
STFC Contributions to the FCC Study
Beam Pipe Meeting Introduction
Update on beam screen issues
Update on beam screen with shielding and other vacuum issues
CLIC damping rings working plan towards the CDR
Status of CTC activities for the Damping rings
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives, tasks & Schedule

Team Objectives Tasks Schedule EuroCirCol WP4 – Cryogenic Beam Vacuum Concept

Team EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Japan KEK Finland TUT France CEA, CNRS Italy INFN Germany KIT, TUD Switzerland EPFL, UNIGE Netherlands UT Spain ALBA, CIEMAT CERN United Kingdom STFC, UNILIV, UOXF CERNIEIO KITGermany INFNItaly ALBASpain CIEMATSpain STFCUnited Kingdom

Objectives EuroCirCol WP4 – Cryogenic Beam Vacuum Concept To develop the technical design concept for the cryogenic vacuum beam pipe, with constrains: -Beam screen -Cryogenics -Magnet core bore

Objectives EuroCirCol WP4 – Cryogenic Beam Vacuum Concept To test a beam screen prototype in the ANKA light source with similar synchrotron light conditions

Tasks EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.1: Work Package Coordination Task 4.2: Study beam induced vacuum effects Task 4.3: Mitigate beam induced vacuum effects Task 4.4: Study vacuum stability at cryogenic temperature Task 4.5: Develop conceptual design for cryogenic beam vacuum system Task 4.6: Measurements on cryogenic beam vacuum system prototype

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.1: Work Package Coordination (ALBA) ALBA with the assistance of CERN coordinates the work of all other tasks of this work package to ensure consistency of the work according to the project plan and to coordinate the WP technical and scientific scope with the tasks carried out by the other WPs.

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.2: Study beam induced vacuum effects (ALBA, CERN) ALBA will model and compute the cryogenic beam vacuum system, both in static and in time constant (so called “dynamic”).The model will include synchrotron radiation effects. In a second stage, ALBA, in close correlation with CERN, will evaluate options to implement cryophoton absorbers.

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.3: Mitigate beam induced vacuum effects (STFC, CERN) STFC will study different coatings to mitigate beam induced electron cloud and ion instabilities Compatibility of these coatings with cryogenics temperatures has to be demonstrated, in particular sticking and flaking of coatings after several cool down and warm up cycles. ~2.2 m, ID 67 beam screen Internally coated with amorphous carbon

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.4: Study vacuum stability at cryogenic temperature (INFN, CERN) INFN Frascati will determine vacuum stability and adsorption isotherms at different cryogenic beam screen operating temperature ranges. It will perform complementary studies on beam induced stimulated desorption phenomena by photons, electrons and ions.

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.5: Develop conceptual design for cryogenic beam vacuum system (CERN, CIEMAT) CIEMAT will closely collaborate with CERN on the mechanical design of the cryo beam screen, ensuring compatibility with fast magnetic transitions and cryogenic cooling concepts CERN will manufacture the beamscreen prototypes and qualify them in one of its magnet test stands at different beamscreen temperatures.

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.6: Measurements on cryogenic beam vacuum system prototype (KIT, INFN, CERN) KIT will be responsible for the “beam qualification” of the beamscreen prototype supplied by CERN. The goal is to determine synchrotron radiation heat loads and photoelectrons generation inside the beamscreen prototype. This beamscreen will be qualified with beam by installing the CERN COLDEX experiment in the ANKA synchrotron ring and exposing the beamscreen prototype to significant levels of synchrotron radiation. ANKA will assist for the installation and integration of COLDEX carried out by CERN and INFN. INFN will commission the experiment and perform the measurements under CERN advice.

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryogenic vacuum of FCC h-h ALBA Beam screen mechanical design and prototyping CIEMAT – CERN Pressure profiles and stability ALBA – INFN – CERN Ecloud mitigation STFC – CERN Test in synchrotron light source KIT - INFN – CERN Ecloud measurement (WP 2.5) KEK – CERN Test of aC coating in synchrotron light source BINP– CERN Arc design and lattice integration (WP2) Photon adsorption measurements at room and LN2 temperatures KEK– CERN Magnet Design (WP5)

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Milestones 1.WP group established and hiring completeM 5 2.Beam screen model heat load and photo-electrons density analysisM 12 3.Measurement setup at light source operationalM 15 4.Proposal of coatings to mitigate electron-cloud effectsM 18 5.Report on recommended follow-up R&DM 47 Schedule

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Deliverables 1.Analysis of vacuum stability at crogenic temperatureM 22 2.Preliminary beam screen and beam pipe engineering designM 28 3.Measurements of vacuum chamber at light sourceM 29 4.Analysis of beam-induced vacuum effectsM 36 5.Preliminary cryogenic-beam-vacuum system designM 45 Schedule

Re-schedule needed…

The design of the FCC-hh cryogenic vacuum system is very challenging: From a technical point of view: Dynamic vacuum Heat transfer of the synchrotron radiation power Mechanical stability, in particular during a quench Material properties at cryogenic temperature under high magnetic field From an organizational point of view: Several collaborators Different expertise New setups Both are very exciting. Conclusion