1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Pre-installation Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Pre-installation.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
1 Meson Production Simulations X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL N u F a c t th International Workshop on Neutrino Factories, Superbeams.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
J. Lettry A. Fabich 10th December INTC statement DRAFT The authors of this letter of intent propose to perform proof-of-principle tests of a high-power.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
The TT2A Experiment A Proposal to the ISOLDE and Neutron Time of Flight Experiments Committee
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Video 7.Dec. 2004A.Fabich, CERN1 CERN P186 Video Conference Access to TT2A during PS extraction POSSIBLE, see also memo at homepage: subsystem/safety/radiation.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
MFS Europe Communications Program Coordinator Status Update February 2014.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN High-Power Targetry Workshop Oak Ridge, TN October 10, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
1 Sample Presentation Movies (avi, gif) of the mercury jet under impact of a proton beam A.Fabich, CERN August 2004.
Proposed Questions for NuFact11 Round Table from the NUFACT11 Scientific Program Committee.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Simulation of High-Power Mercury Jet Targets for Neutrino Factory and Muon Collider R. Samulyak, 1,2 H.C. Chen, 1 H.G. Kirk, 2 K.T. McDonald 3 1 Stony.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
MERcury Intense Experiment Experiment Layout
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
The Proposed TT2A Target Experiment
The Proposed TT2A Target Experiment
MERIT beam request A.Fabich CERN AB-ATB
Layout of passages between TT2 and TT2A
MERIT – status and schedule
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research board layout of TT2A safety requirements

1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop DRAFT Minutes from the research board P186 Studies of a target system for a 4-MW, 24-GeV proton beam. The proposal is for a proof-of-principle test of a target station suitable for a Neutrino Factory or Muon Collider source, using a 24 GeV proton beam incident on a target consisting of a free mercury jet inside a 15 T capture solenoid magnet. It was recommended for approval by the INTC on its scientific merits, but conditional on satisfactory resolution of issues concerning the implementation at CERN; in particular, concerns have been expressed by the Radiation Protection group. The Research Board takes note of the recommendation, but before considering the experiment for approval requires further information on the support for the proposed test from the relevant scientific community, on the safety issues, and on the resources requested from CERN.

1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop website –Contains all information on Phone/video-confernces (links to HK, KMcD) Layout/details on TT2A Memos of private communication Safety related documents …

1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Website (2) Sitemap –Movies –Subsystems Solenoid Safety –… LN2 circuit Mercury loop … –Layout: ACAD drawings Photographs –Important dates: minutes collected chronologically –…

1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Layout of TT2A See website layout –drawings ACAD files (not up-to-date!?) –Photographs Entrance TT2 Junction TT2/TT2A TT2A tunnel –Solenoid location –dump

1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Safety requirements Contact people See website Subsytems/safety Safety sections –Mechanics –Radiation –Chemicals –Fire –LN2 –…