Tor Raubenheimer SLAC FY07 Budget Proposal ART FY07 Budget Meeting SLAC May 3 rd, 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Tor Raubenheimer SLAC ILC Accelerator Program DOE HEP Program Review June 14 th, 2005.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Andrei Seryi ILC BDS, DOE review 1 June 2005 The ILC Beam Delivery System, ATF2 and ESA Andrei Seryi SLAC DOE High Energy Physics Program Review June 14-15,
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Tor Raubenheimer SLAC ILC Accelerator Efforts SLAC DOE Program Review June 13 th, 2007.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
CLIC Damping ring beam transfer systems
Beam Delivery update Andrei Seryi December 12, 2005
CLIC-ILC BDS & MDI work.
ILC/CLIC e+ generation working group
Junji Urakawa (KEK) for ATF International Collaboration
Electron Source Configuration
Summary for the Sources working group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

Tor Raubenheimer SLAC FY07 Budget Proposal ART FY07 Budget Meeting SLAC May 3 rd, 2006

International Linear Collider – Americas 2 Introduction SLAC has a broad program where we are leading four main elements of the ILC design: –RF Sources –Particle sources –Beam Delivery System –Availability and Operations In addition, there are smaller or supporting efforts in: –Damping ring design –Low emittance transport –Beam instrumentation –Test facility utilization –Conventional facilities and Installation  Chris Adolphsen  Tom Himel  Tor Raubenheimer  Tom Himel

International Linear Collider – Americas 3 SLAC Effort on RDR The SLAC group is focused on most aspects of the design –Very broad program bringing experience from SLC and NLC

International Linear Collider – Americas 4 Planning for FY07 Planning done in the context of delivering a TDR in 2009 Major milestones of SLAC program: –Six operating rf sources (modulator, klystron, rf distribution) –Electron source photocathode and laser prototyped; engineering design mostly complete –Positron source (undulator section, target, AMD), and capture structure prototyped; engineering design mostly complete –Beam delivery system (specialty magnets), collimators, diagnostics prototyped; engineering design in progress –Critical beam instrumentation demonstrated –High availability hardware demonstrated –Installation plan developed; tunnel mockup constructed –ATF and ATF2 operating; IR mockup constructed in ESA –One or more full rf units operating with ILC parameters somewhere Hope to develop more integrated schedule in future

International Linear Collider – Americas 5 FY06 & FY07 Budget Request Program has large increase in funding for rf sources –Evaluate and down-select between modulator options –Purchase klystrons for evaluation in FY08 –Start construction of new klystron at SLAC –Develop the rf distribution system Also a large increase in engineering and costing –Largely in support of the positron source and the BDS

International Linear Collider – Americas 6 SLAC ILC Management Management includes myself, office support, financial support, computer support, travel, and fractions of Nan Phinney, Tom Himel, and Tom Markiewicz. –Management is not well separated from design functions or GDE support (never explicitly called out - 9 members) –Budget assumed to grow slightly with group size –Overhead rates better accounted for but increases from FY06

International Linear Collider – Americas 7 Electron Source Polarized electron source is similar to SLC source –120 ~ 150 kV DC gun –GaAs photocathode with ~90% polarization –Ti-Sapphire laser system at ~800nm with 3MHz rep rate R&D needed –Improve polarization from photo-cathodes, –Develop more robust photocathodes, –Develop a stable high rep rate laser system Work is needed for the TDR on system layout, availability, costing etc

International Linear Collider – Americas 8 Photocathode R&D Strained superlattices are yields ~90% polarization Further optimization possible for ILC bunch train Develop GaN as a more robust alternate Strained GaAs GaAsP Strained GaAs GaAsP Strained GaAs GaAsP 30 A 40 A GaAs Substrate GaAs (1-x) P x Graded Layer GaAs 0.64 P 0.36 Buffer Active Region 25  m 1000 A

International Linear Collider – Americas 9 Gun & Laser R&D Laser development recognized as an outstanding issue by ART DOE review and GDE R&D Board –Very different from commercial systems –Timing and amplitude stability very important –Expertise from SLC/E-158 polarized source program Gun R&D focused on working at higher voltages –Higher voltage leads to slightly smaller emittances Simpler beam handling – minor savings in damping rings –R&D program to study different insulators in vacuum system –RF guns would be interesting if more robust photocathodes are developed – R&D program to develop PWT gun at 1.3 GHz Some savings in damping ring wiggler systems

International Linear Collider – Americas 10 Positron Source SLAC is coordinating work on the positron source –Beam line design and optics at SLAC –Undulator design at Daresbury (and LBNL?) –Target design at LLNL –Capture structure design at SLAC –Capture simulations and optics at ANL Positron source is a big system e- source e - DR e - Dump Photon Dump e + DR Auxiliary e - Source Photon Collimators Adiabatic Matching Device e + pre-accelerator ~5GeV 150 GeV100 GeV Helical Undulator In By-Pass Line Photon Target 250 GeV Positron Linac IP Beam Delivery System e- Target Adiabatic Matching Device e - Dump

International Linear Collider – Americas 11 Positron Source R&D is required on: –The target and AMD –The undulator –Capture structures Robust capture structure designed by SLAC NC structure group. Fabrication in FY06; testing in FY07. Target system and AMD being designed at LLNL. Eddy current measurement at SLAC. Undulator pushed the technology limits.

International Linear Collider – Americas 12 Beam Delivery System SLAC is coordinating the BDS development –Optics for 20 mrad FFS developed and studied at SLAC –Optics IP switch, emittance diagnostics, dump lines for 2 and 20 mrad developed at SLAC –Compact FD quadrupoles for 20 mrad X-ing developed at BNL –Background simulations and crab cavity development at FNAL –Possible FD quadrupoles for 2 mrad X-ing developed at LBNL –Plans to develop IR mockup in End Station A (ESA) Additional R&D at ESA and ATF2 test facilities

International Linear Collider – Americas 13 Baseline –Two BDSs, 20/2mrad, 2 detectors, 2 longitudinally separated IR halls Alternative 1 –Two BDSs, 20/2mrad, 2 detectors in single IR Z=0 Alternative 2 –Single IR/BDS, collider hall long enough for two push-pull detectors Beam Delivery System Optics

International Linear Collider – Americas 14 Design of IR for both small and large crossing angles Pairs induced background similar in both cases Losses in extraction & background harder in 2mrad Large aperture quads need design Pairs induced background in SiD IR Design – 2 mrad

International Linear Collider – Americas 15 20(14)mrad IR –BNL self-shielded compact quads successfully tested –Focus on 14mrad alternative to push the technology ILC crab cavity: –collaboration of Fermilab, UK (Daresbury, et al), SLAC –Based on 3.9GHz deflecting cavity designed at Fermilab –Design is being verified and preparing for fabrication Omega3P Mesh 3.9 GHz deflecting cavity, early 13 & 3 cell models and recent 9cell design Fermilab BNL IR Design – 20(14) mrad

End Station A Test Facility For Prototypes of Beam Delivery and IR Components CCLRCLLNLQMULU. of BristolUMass Amherst CERNLancaster U.SLACUC BerkeleyU. of Oregon DESYManchester U.TU DarmstadtU. of Cambridge KEKNotre DameU. of BirminghamUCL Collimator design, wakefields (T-480) BPM energy spectrometer (T-474) Synch Stripe energy spectrometer (T-475) IP BPMs, kickers EMI (electro-magnetic interference) IR Mockup PAC05 paper/poster: SLAC-PUB-11180, e-Print Archive: physics/

International Linear Collider – Americas 17 ATF2 FFS Project FFTB demonstrated small spots sizes –Short runs with weeks of preparation and tuning –Demonstration of ~65nm ATF2 has two main goals: A)Small beam size(with Shintake BSM at IP) (A1) Obtain  y ~ 35nm (A2) Maintain for long time B) Stabilization of beam center(with IP-BPM) (B1) Down to < 2nm by nano-BPM (B2) Bunch-to-bunch feedback of ILC-like train Project proposed by SLAC group –Very strong continued participation –Contribution of ~1/3 of necessary hardware (model for ILC) –Uses some fraction of US-Japan funds

International Linear Collider – Americas 18 ATF-2 at KEK SLAC contributions –Optics design –Magnet movers –Magnets –Magnet power supplies –BPM systems New final focus ILC like optics at ATF-2

International Linear Collider – Americas 19 Power Supplies for ATF2 HA design to be demonstrated at ATF2 using n/M configuration –40 supplies to be sent in FY07 and FY08

International Linear Collider – Americas 20 Components for ATF2 FFTB movers to be dismantled in April and will be refurbished for ATF2 Photo shows FFTB “QC3” in SLAC FFTB beamline which is one of the candidates for Final Doublet quad Mover

International Linear Collider – Americas 21 Damping Ring R&D SLAC group working with DR Area group –Optics design and optimization of nonlinearities –Development of impedance of impedance models and calculation of ‘classical’ collective effects –Simulation of fast-beam ion instability  OK for single e- damping ring with LowQ parameters and 650 MHz –Simulation of electron cloud instability R&D on SEY minimization and fast kicker systems Lead ATF external participation (covered by Tom Himel) –ATF and fast kicker work covered by Tom Himel

International Linear Collider – Americas 22 Electron Cloud Studies Extensive simulations calculating instability and SEY thresholds to provide guidance for R&D –Benchmarking against KEKB, DAPHNE, and PEP-II –Comparing low SEY chambers, clearing electrodes, chamber gap

International Linear Collider – Americas 23 Low SEY Chamber R&D Three approaches: –Load-lock in PEP-II chamber with sample to transfer to lab Fabricated in FY06 –Grooved chamber to demonstrate SEY suppression in PEP-II –Clearing electrode to demonstrate SEY suppression in PEP-II SEY tests chamber Fin chambers

International Linear Collider – Americas 24 Low Emittance Transport Simulation of beam transport and wakefield calculation has been a strength of the SLAC group since the SLC –Blurring of LET work with RTML design (RTML not nec. SLAC) –3-D modeling of cavities and cryomodules in freq. and time domain –Beam tuning simulations from DR  IP  dumps Setting specs on RTML, linac, and BDS components and instr. Generating luminosity and IP distributions for experimentalists Need to add to computing cluster  300+ processors Outstanding R&D question for the linac alignment: –Stability of the SC quadrupole magnetic center and the BPM

International Linear Collider – Americas 25 Wakefield Calculations Studying TDR, Jlab and KEK Low-Loss cavity shapes

International Linear Collider – Americas 26 Linac Quadrupole Cos(2  ) SC Quad (~ 0.7 m long) S-Band BPM Design (36 mm ID, 126 mm OD) Field Map Al Cylinder Iron Yoke Block SC Coils He Vessel

International Linear Collider – Americas 27 Linac Quadrupole Package

International Linear Collider – Americas 28 Linac BPM Testing Installation in ESA

International Linear Collider – Americas 29 Summary SLAC program is well aligned with global R&D program and development for the TDR –Most R&D topics are strongly supported by DOE review of the ART and the ILC GDE R&D board –Funding request almost doubles to 28M$ in FY07 Need to start modulator and klystron procurement to down- select by the end of FY07 and FY08 respectively Source development well aligned with Fermilab test facility needs –Number of FTEs increases by 50% Most people identified by name New groups joining (for example klystron department) Need to supplement group by ~10 engineers and designers –People will be available from GLAST, PEP-II, and LCLS Other topics covered by Chris Adolphsen and Tom Himel