Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.

Slides:



Advertisements
Similar presentations
Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Advertisements

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
ASIA ILC R&D seminar Kympok National University, Taegu, Korea October 2008 R&D status of ILC Positron Source KURIKI Masao (Hiroshima/KEK) ‏ 구리기.
E + ソースの現状 大森 GDE 活動報告会 2008 年 6 月 23 日 シカゴ GDE meeting に向けて 大森 GDE 活動報告会 2008 年 10 月 6 日 かなりの数のスライドが、栗木さんが先ごろ大邱 "2nd Asia ILC R&D Seminar, Sep 29-30,
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
A Report from PosiPol2015 to AD&I meeting (10 Sep. 2015) Masao KURIKI (Hiroshima University)
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
1 Report on the AAP Review Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
ML (BC) Studies update Nikolay Solyak Arun Saini.
Date Event Global Design Effort 1 ALCPG Briefing on ILC Cost Reduction Studies Ewan Paterson Personal Views GDE May 15, 08.
Positron capture simulation for 300Hz electrondriven scheme M. Kuriki, Y. Seimiya, T. Takahashi (Hiroshima U.) T. Okugi, M. Sato, J. Urakawa, T. Omori.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Undulator Based ILC positron source for TeV energy Wanming Liu Wei Gai ANL April 20, 2011.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
AD&I Meeting 23/6/10 Jim Clarke
K. Yokoya CRWG, ECFALC2016, KEK
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Availsim runs and questions
ILC/CLIC e+ generation working group
Kaoru Yokoya CRWG Meeting, Feb.2, 2016
LAL meeting on e+ studies, Oct. 2010
Nick Walker for the Project Management
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Bunch Compressor Beam Line Optics
Presentation transcript:

Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1

KAS/APS central region integral KAS/APS share a common target, capture, booster. 500 MeV linac for KAS/APS is in e- BDS tunnel. KAS/APS operation conflicts to maintenance in e- BDS, e- RTML (upstream), and e- DR. KAS/APS is compatible with maintenance for e- RTML (downstream), e- ML, and undulator. 10/25/2011ILC Technical Baseline Review, 2011, DESY 2

BDS DOGLEG and AUX SOURCE 10/25/ ILC Technical Baseline Review, 2011, DESY Electron Beam For Aux. Positron

TGT, OMD, etc and Vault 10/25/ ILC Technical Baseline Review, 2011, DESY Aux. Positron Electron Beam For Aux. Positron

125 MeV Capture Accelerator, Beam separation and Dumps 10/25/ ILC Technical Baseline Review, 2011, DESY Aux. Positron (Injector Linac)

5 GeV Booster and BDS Optics 10/25/ ILC Technical Baseline Review, 2011, DESY Aux. Positron (5GeV Booster)

Continued BDS and E+ transport past the MAIN 20 MW E+ DUMP 10/25/ ILC Technical Baseline Review, 2011, DESY Aux. Positron

Separation of E+ Beam to DR and E- BDS to IR + E- RTML 10/25/ ILC Technical Baseline Review, 2011, DESY

Concept of “Auxiliary” or “Keep Alive Source 1.RDR Keep Alive source: 10% nominal intensity. 1.Dedicated 500MeV e- linac 2.Dedicated e+ target (W or W-Re) and capture section. 2.SB2009 Auxiliary source: 2% intensity 1.Dedicated 500MeV e- linac 2.A common e+ target (Ti alloy) and capture with undulator. 3.Placed in BDS tunnel. 3.Is SB2009 Auxiliary source useful? 9 10/25/2011 ILC Technical Baseline Review, 2011, DESY

KAS/APS yield 500 MeV driver with 0.4X 0 target makes ~2% intensity. The same driver with 3X 0 target makes ~20% intensity. 0.4X 0 Ti alloy and 4X 0 W has same thickness. 10/25/2011 ILC Technical Baseline Review, 2011, DESY 10

Two Scenarios Start up e+ source is very important in MD phase. In the initial phase, 3X 0 W-Re instead of 0.4X 0 Ti alloy improves the e+ intensity. 500 MeV single bunch S-band accelerator (30m) can generate 20 % intensity e+ beam. The target can be replaced when undulator is ready for the commissioning. KAS becomes a small backup with a few % intensity. Could W-Re (or W) and Ti alloy be implemented in a same target ? (Hybrid). 10/25/2011ILC Technical Baseline Review, 2011, DESY 11

Mosaic target A target assembly consists from W-Re and Ti-alloy. The target should be assembled symmetrically for smooth rotation. The rotation is controlled, so that electron hit W-Re part and photon hit Ti-alloy part. The target is compatible both for physics run with undulator and commissioning run with e- auxiliary source, without target exchange. 10/25/2011ILC Technial Baseline Review, 2011, DESY 12 Ti W-Re photon electron

Summary Any conflict with other system in operation? Does it work really as KAS/APS? Is 2% bunch intensity enough? Target replace after commissioning phase seems to be efficient and reasonable. Mosaic target can be a technical solution to avoid the target exchange. 10/25/2011ILC Technical Baseline Review, 2011, DESY 13