Doc.: IEEE 802.11-11/1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.

Slides:



Advertisements
Similar presentations
Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Advertisements

Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Doc.: IEEE /1268r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– September 2011 Date: 22 September 2011 Discussion topics.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0720r1 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Doc.: IEEE /0943r3 Submission September 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Smart Grid ad hoc – August 2011
2018/7/ /7/29 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i May 2011 Closing report Date.
Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name
IMT-Advanced Opening Report
Wireless Characterization for NIST PAP#2
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Smart Grid ad hoc Closing Report – May 2011
Supplementary Plenary Information - November 2009
IMT-Advanced Closing Report
<month year> doc.: IEEE < e> <September 2018>
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
<month year> doc.: IEEE ptc November 2012
Supplementary Plenary Information - September 2010
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
IEEE IMT-Advanced Review Process
Smart Grid ad hoc Closing Report - March 2010
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
Supplementary Plenary Information - September 2009
IEEE IMT-Advanced Review Process
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Smart Grid ad hoc Closing Report – January 2011
Supplementary Plenary Information - September 2009
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
Plenary Information - September 2009
<month year> doc.: IEEE < e> January 2012
WBA Carrier Wi-Fi Liaison request - March 2014
September 2003 doc.: IEEE /0423 r0 September 2003
Presentation transcript:

doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics during November Atlanta Session NameCompanyAddressPhone Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA, Tuesday Abstract: 1 – NIST PAP2 2 – November Tutorial

doc.: IEEE /1542r0 Submission Atlanta Agenda High level PAP02 GOALS, Work plan, Schedule, Discussion of details as appropriate Catalog of Standards Modeling Tool PAP02 Intro Cyber Security Publications and References NIST Framework document – comment period open November 2011 Bruce Kraemer, MarvellSlide 2

doc.: IEEE /1268r1 Submission3 November 2011 Bruce Kraemer, Marvell

doc.: IEEE /1542r0 Submission 802 Goals in the PAP02 Context Recognition of IEEE 802 wireless standards in NIST Catalog of Standards Acceptance of wireless standards as viable in Smart Grid deployments November 2011 Bruce Kraemer, MarvellSlide 4

doc.: IEEE /1542r0 Submission Atlanta Meeting Goals Information about NIST SGIP PAP02 status and plans Discussion of best method for developing or reviewing key deliverables November 2011 Bruce Kraemer, MarvellSlide 5

doc.: IEEE /1542r0 Submission November 2011 Farrokh Khatibi, Qualcomm IncorporatedSlide 6 Summary of NIST PAP02 Activities Date: Authors:

doc.: IEEE /1542r0 Submission Status Published: –NISTIR 7761: NIST Priority Action Plan 2NISTIR 7761 Guidelines for Assessing Wireless Standards for Smart Grid Applications –Wireless Capability MatrixWireless Capability Matrix –Application Communication Requirements MatrixApplication Communication Requirements Matrix New Work: Update of the Guidelines November 2011 Farrokh Khatibi, Qualcomm IncorporatedSlide 7

doc.: IEEE /1542r0 Submission Table of Contents PREFACE 1 OVERVIEW OF THE PROCESS 2 ACRONYMS AND DEFINITIONS 3 SMART GRID CONCEPTUAL MODEL AND BUSINESS FUNCTIONAL REQUIREMENTS 4 WIRELESS TECHNOLOGY 5 MODELING AND EVALUATION APPROACH 6 FACTORS TO CONSIDER IN DETERMINING PERFORMANCE 7 CONCLUSIONS 8 REFERENCES 9 BIBLIOGRAPHY ANNEX A IEEE ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE /WIMAX NETWORK November 2011 Farrokh Khatibi, Qualcomm IncorporatedSlide 8

doc.: IEEE /1542r0 Submission November 2011 Farrokh Khatibi, Qualcomm IncorporatedSlide 9

doc.: IEEE /1542r0 Submission November 2011 Farrokh Khatibi, Qualcomm IncorporatedSlide 10

doc.: IEEE /1542r0 Submission What needs to be done: November 2011 Farrokh Khatibi, Qualcomm IncorporatedSlide 11 Chapter 4: Chapter 5: Chapter 6: Update:

doc.: IEEE /1542r0 Submission Major 802 Engagement Opportunities in SGIP Participate in the PAP02 activity to develop Wireless Guideline 2.0 Prepare and Submit application paperwork for 802 standards to NIST for inclusion in the Catalog of Standards November 2011 Bruce Kraemer, MarvellSlide 12

doc.: IEEE /1542r0 Submission Guideline Version 1 September 2011 Bruce Kraemer, MarvellSlide 13 AttributeStandard Information Identifier of the standardNIST IR 7761 Title of the standardGuidelines for Assessing Wireless Standards for Smart Grid Applications Name of owner organizationNIST Latest versions, stages, dates1 URL(s) for the standardhttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_A ssessing_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf

doc.: IEEE /1542r0 Submission Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) September 2011 Bruce Kraemer, MarvellSlide 14

doc.: IEEE /1542r0 Submission Guideline 1 to 2 Differences Provide a significantly better method for analyzing/comparing the performance of a wireless technology in a representative physical environment with a specified data load scenario –Utilize realistic data loading (developed by OpenSG) –Significantly extend the technology modeling (SDO sub com) –Correct definitions contained in Section 4 September 2011 Bruce Kraemer, MarvellSlide 15

doc.: IEEE /1542r0 Submission PAP02 Guideline - Schedule Overview Wireless Guideline 1 published – Jan 13, 2011 Finalize wireless model – Oct 7, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012 Collect all details on modeling scenarios – Nov 4, 2011 Exercise, refine, output model results – Feb 3, 2012 PAP02 vote on Guideline 2 Submit Guideline 2 to CoS process – April 16, 2012 Wireless Guideline 2 published – Aug 10, 2012 September 2011 Bruce Kraemer, MarvellSlide 16

doc.: IEEE /1268r1 Submission PAP02- Phase 2-SDO Sub Committee Charter Intro Thanks to Ron Cunningham for his diligent preparation of requirements for completion of Phase 2. We propose that it is time for the wireless SDO’s to take a more active role in constructing the analytic Proposal/Request We request authorization from PAP2 members to form an “SDO subcommittee” committed to completing delivery of an operational analysis framework, and related descriptive text, in time for presentation to the Dec 05, 2011 SGIP board meeting. Goals Example of deliverables include: Definition of propagation model, ability to calculate quantity of wireless equipment required to cover a given demographic/topographic area and description of statistical confidence in reported numbers Utility/GRID Input Requirements Information regarding actor quantities by type, relative locations, topography, data traffic loads Synchronization “SDO subcommittee” will report progress to during currently scheduled biweekly PAP2 calls Logistics “SDO subcommittee” will convene a series of teleconferences scheduled to optimize SDO participation but open to all PAP2. SDO subcommittee will self organize, assign/delegate work. develop a milestone based project schedule. Webinar facilities will be available. Membership “SDO subcommittee” is a volunteer group initially underwritten by ATIS, IEEE, TIA, and WiMAX. Additional wireless SDO participants will be recruited September 2011 Bruce Kraemer, MarvellSlide 17

doc.: IEEE /1268r1 Submission SDOs Subcommittee Update We are considering a parallel approach: –Completion of Guideline v2, and –Submission of the CoS paperwork by the individual SDOs Discussed Ron’s proposed Workplan and made appropriate changes. Notes: –The timeline is based on the existing scope of the Subcommittee (see slide entitled “Model Acceptance questions” from last time) –Ron will add a line item to capture additional work that may be required for “multi-unit dwellings” Discussed updates to section 5: –For the indoor path loss model, we will analyze and compare various models, but we will not recommend a specific one –Whether we will recommend a specific outdoor path loss model is for further study. 18 September 2011 Bruce Kraemer, Marvell

doc.: IEEE /1542r0 Submission PAP02 Activities Purpose: Biweekly meeting to discuss PAP 2 work items Webinar Info: August 16 - Teleconference 2:00pm ET Tuesdays Aug 30, Sep 13, 27 - Teleconference 2:00pm ET SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday effective 8/8/2011 from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge Information Phone: Conference ID: Passcode: 0681 September 2011 Bruce Kraemer, MarvellSlide 19

doc.: IEEE /1268r1 Submission SDO ACTIVITIES September 2011 Bruce Kraemer, MarvellSlide 20 Complete all work by November Verify completion criteria Deviation from standard procedure assumed – verifying Complete propagation model One approach for all technologies?