D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.

Slides:



Advertisements
Similar presentations
Surveying I. Lecture 2..
Advertisements

Pore Detection in Small Diameter Bores The University of Michigan, Ann Arbor NSF Engineering Research Center for Reconfigurable Manufacturing Systems.
1 Laser Beam Coherence Purpose: To determine the frequency separation between the axial modes of a He-Ne Laser All sources of light, including lasers,
S.H.H.S Building Construction
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham*, Edward Botcherby*, Paul Coe*, Grzegorz Grzelak*, Ankush Mitra*, Johannes Prenting.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Prepared using support of U.S. Department of Energy under Contract No. DE-AC02-76SF00515 by the Stanford Linear Accelerator Center, Stanford, California.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
The Laser Reference Line Method and its Comparison to a Total Station in an ATLAS like Configuration. JINR: V. Batusov, J. Budagov, M. Lyablin CERN: J-Ch.
H. SCHMICKLER Alignment challenges for a future linear collider.
ISAT 303-Lab3-1  Measurement of Condition: Lab #3 (2005):  List of parameters of condition: –Linear distance, angular displacement, vibration, displacement,
JINR: V. Batusov, J. Budagov, M. Lyablin, G. Shirkov CERN: J-Ch. Gayde, B. Di Girolamo, H. Mainaud Durand, D.Mergelkuhl, M. Nessi, G. Stern Presented by.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
Modern Optics Lab Lab 6 Part 2: Interference Experiments  Observe interference by plane-parallel plates: Measure the thickness of the plates based on.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
N.Azaryan 1, V.Batusov 1, J. Budagov 1, V. Glagolev 1 M. Lyablin 1,G. Trubnikov 1, G. Shirkov 1, J-Ch. Gayde 2,B. Di Girolamo 2,D. Mergelkuhl 2, M. Nessi.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
NLC - The Next Linear Collider Project SLAC tunnel motion and analysis Andrei Seryi SLAC Originally given at The 22nd Advanced ICFA Beam Dynamics Workshop.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Performance of the Iris diaphragm laser alignment system of the SPring-8 C. Zhang JASRI / SPring-8 IWAA2014, October 13-17, 2014, IHEP, Beijing.
ALIGNMENT OF THE NEW TRIPLETS
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
TEST MODULE WG Cradles for CLIC module supporting system
Mechanical Design Review February 25, 2008 Université de Montréal
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Recent developments on micro-triangulation
Visit for more Learning Resources
JINR: J. Budagov, M. Lyablin., G. Shirkov.
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
LumiCal mechanical design, integration with LDC and laser alignment
Towards a common mechanical interface
Alignment challenges for a future linear collider
The Storage Ring Control Network of NSLS-II
Robert Pushor, Catherine LeCocq, Brian Fuss, Georg Gassner
Leveling By : Parveen Kumar.
Presentation transcript:

D. Missiaen Summaries of the discussion

2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes on a common girder 4-5 m Laser beam as a reference, lccd,4 ccd cameras Iris (circular loe) Gives an iris pattern Up to 40 m with an iris of 3mm Laser beam mm diameter Multipoints system with 4 measurements points with an iris one closed and the others opened 10 microns at 2sigma Reproducibility of the diaphragm opening : 2-3 microns Measurement for the 4 points in 30s, no long term stability pb

3 H. Mainaud Durand a 500 m long laser based fiducial line at KEK Laser is in a beam pipe below the girders under vacuum Quadrant silicon photo diode (QPD) mounted in a sub holder 10mm de diameter Linked to the pipe by join flanging, manually movable from thebeam 48 girders on 500m Based on fresnel lens Laser installation rather sophisticated at atmospheric environment isolated from the floor Diameter of 30mm at the beginning of laser beam, 21 mm at500 m Stability0,1 mm during 8 hours at 500m Errors 0,1mm is garanted by this measurements Multipoints Not radiation-hard

4 H. Mainaud Durand The Laser Beam Fiducial Line Application by JINR Dubna Laser in an air filled pipe with acoustic waves Station laser, collimator End point Measurement point Equipped with 2 parallel plates not to destroy the reference laser line. It is an idea At 150m, it can go up to 2km because of the size of the laser Multipoints. Yes Geodetic refraction bends the beam because you are not in vacuum,1/10 of the geodetic curvature Possibility to adjust the QPD in the center of the laser beam with adjustment screws

5 H. Mainaud Durand The SLRS poisson based alignment system at DESY Accurary for initial alignment is 0.3mm on 150 length Relative alignment after bba Principle : Laser, achromatic lens, poisson points, achromatic lens, ccd In vacuum Permanent Relation between outside and inside is done through a flange, calibration done with laser tracker Detections of translation 25 microns in y and 50 microns y (vertical) Test avec 4 targets : 2 fixed and 2 variables Estimated achivable accuracies mm 16 spheres Vacuum 10-2mbar

6 H. Mainaud Durand The superweak angular groud motion : search and registration Liquid surface, laser, QPD Demultiplication of the angles with semi-transparaent lenses And reflexions on the water Resolution in the range of rad Earth surface oscillation Slope And a hole for the minutes echantillons Microseismicpeak observation : vibration 2 microrad 0.1 microrad industrial noise Long base experimental proposal to align/stabilize linear collider System installed at CERN

7 H. Mainaud Durand The lambda system at CERN Laser beam, beam expander Camera and a shutter Range between +-3mm At short distance Different types of shutter : paper sheet,aluminium no very good results, ceramic plate, 20 microns At long distance at 4*50m in CERN calibration base To check the size of the beam Stability ???

8 H. Mainaud Durand The laser alignment validation by system refered to gravity How to determine the equipotential Astrogravimetry : deflection of vertical with zenital camera and gravimmetry At CERN, on 800m there is a variation of 4mm due to the Jura Locally on 200m, 10 to 20 microns accuracy, 10-7 Geodetic deflectometer at CERN Interferometer is the straight line measuring angles with respect to a clinometer The difference is giving the variation of the deflection of vertical

9 H. Mainaud Durand Laser reference line mehod and comparison to a total station Following of the presentation of ML (JINR) At the request of Atlas people, a comparison was organised Difference up to 80 microns Much worse in V than H Is it due to the laser or to the Total station ??

10 Open questions H. Mainaud Durand The laser beam as a reference line diameter of the beam w.r.t length, optimal laser wavelength HeNE, Beam expanders, CERN achromatic lenses, DESY mm size over 500m seems achievable KEK stability of the beam, stability of the laser source At short distance, quick measurement, not really a pb SPRING8 At long distance, not so clear Lambda CERN Stability0,1 mm during 8 hours at 500m Possibility to measure angles up to (JINR) is vacuum needed? Over which distances? Which vacuum? Other solutions: helium? In a beam pipe JINR In vacuum DESY (10-2) and KEK, CERN in the future Yes to avoid environmental effects and geodetic refraction Impact of temperature, humidity and other parameters Not really mentionned How to be sure of the straightness of the beam? not addressed Additional instruments used such as beam expander, lens, diaphragm? Proposal to add two parallel plates to be tested JINR not to destroy the beam laser straightness

11 Open questions H. Mainaud Durand Which type of sensor? Iris diaphragm (spring8), optical shutter (CERN) : no need to remove it from the beam QPD (JINR.,KEK), Balls, spheres (DESY) Impact of the diameter of the beam / longitudinal distance / shape of the laser spot Beam diameter bigger than QCD How to attach a sensor to a component, and measure w.r.t. a laser beam under vacuum? How to transfer the position of the laser beam outside the vacuum pipe without any constraints? Through a flange : DESY, Removable from the beam system manually : KEK Direct link for Spring8 Rad hard sensors Not really adressed N sensors along the beam line, with N > max for DESY, some limitations for Spring8, lambda (???), kek (48 at least) Algorithm for image processing? Software used? Number of measurements to determine beam position? Not really adressed Sensor size / weight / resistance to vacuum, radiations / price Not really adressed