ASTM G197 Task Group Chair: Joe Hayden/Pella Corporation Status Update September 22, 2014.

Slides:



Advertisements
Similar presentations
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Technology Implementation Design, Construction, Materials, and Welding Technology Track at R & D Forum Yong-Yi Wang Engineering Mechanics Corporation of.
Solar Radiation Solar Spectrum most the energy received from the sun is electromagnetic radiation in the form of waves. Electromagnetic Spectrum is.
The Objectives:  Investigate the feasibility of consolidating three student administrative areas into one Centre.  Improve the student experience through.
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. Business and Administrative Communication SIXTH EDITION.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
A Review ISO 9001:2015 Draft What’s Important to Know Now
11 A presentation on A-16 Themes for The FGDC Steering Committee June 5, by Wendy Blake-Coleman US EPA Lifecycle Management Work Group.
Accreditation and Proficiency Testing. APT Subcommittee MembershipMeeting Activities 21 members, 15 non- Commissioners Representation: Accreditation bodies.
Key changes from OHSAS 18001:1999
What is Business Analysis Planning & Monitoring?
07/26/2010 National Petroleum Council Future Transportation Fuels Study - Task Group/Subgroup Overview September CSC Meeting Hydrogen Subgroup.
Laboratory Biorisk Management Standard CWA 15793:2008
High Performance Building Standard. Public Law , Sect. 809 (1974) Congress directed NIBS to “exercise its functions and responsibilities in four.
1 Midrange Computing Working Group Process and Goals Background The MRC Working Group Phase I: - Assessment and Findings - Recommendations for a path forward.
RESEARCH WORK AT THE UNIVERSITY OF MASSACHUSETTS Center for Energy Efficiency and Renewable Energy Building Energy Efficiency Program University of Massachusetts.
UNECE Agenda item 2 : Matters arising since the fifteenth session Presented by the UNECE secretariat for information.
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
1 Crisis Response Task Force (CRTF) Proposal Tom Bowe (Chairman) CSO, PJM Interconnection Scott Heffentrager (Temp. Chairman) Physical Security.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
The European Qualifications Framework for Lifelong Learning – Update on Recent Developments ReferNet Meeting 22 January 2009.
POLICIES AND IMPLICATIONS CLIMATE CHANGE EDUCATION RESEARCH J. Randy McGinnis, Emily Hestness, Wayne Breslyn, Chris McDonald University of Maryland, College.
Generation Adequacy Task Force Update to WMS September 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
1 NOAA-UPRM COOP Program in Atmospheric Sciences and Meteorology, Department of Physics, University of Puerto Rico at Mayagüez, Mayagüez, PR Yaítza.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Streamgaging Task Force Summary Report Advisory Committee on Water Information Herndon, Virginia September 10, 2003.
Company Confidential 1 Other Party Management (OPMT) 9104/1 Special Sub Team Recommendation Summary Tim Lee & Ian Folland June 23, 2010.
Working Group 1: Evolving 911 Services Status Update September 21, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Source: OEA/Ser.W /XIII.2.3 CIDI/CIDS/doc. 6/02 The Inter-American Program on Sustainable Development establishes the priorities and policy guidelines.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
23 July 02IP Policy Update1 Status Report on IP Policy Review Process to the Executive Board 23 July 02 Gisele Welch.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
ASTM TECHNICAL GUIDANCE COMMITTEE Semi-Annual Report Presented by William A. Buscher III Updated March 6, 2016.
Revising The 1985 EPA Purple Book. History / Timeline of the Purple Book 1.Published Immediately outdated OSHA Const. Std AHERA.
Alternate Work Schedule Update Presented by: Robbie Berg, HR Director On November 5, 2009.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
Fritted Glass TG – Spring 2016 Jacob C. Jonsson Windows and Envelope Materials Group Building Technology and Urban Systems Division.
Principal Investigator ESTCP Selection Meeting
Disciplines of Science, ch. 16
IAIS 23rd Annual Conference Major Projects Update Panel Presentation on Financial Stability and Technical Committee, Michael McRaith, Chair, FSTC Asunción,
IEEE 802 Wireless Coexistence BoF Wednesday Meeting
Current and Future State of the IMPROVE Website
Principal Investigator ESTCP Selection Meeting
Alexander Mishev and Ilya Usoskin
Solis Clear Sky Scheme:
NEC National Programmes
VIG TG Update NFRC Fall Membership Conference
Organizers: Mihir Desai, Joe Giacalone, Eric Christian
Title of Your Thesis Your name
IEEE Task Group G Status Update
TGad July 2009 Closing Report
MD & NS validation workshop
Finance & Administrative Sub-Committee & Treasurer’s Report
Alexander Mishev & Ilya Usoskin
IEEE 802 Wireless Coexistence Study Group Tuesday Meeting
doc.: IEEE /133r0 Mika Kasslin TGh chair
Crisis Response Task Force (CRTF) Proposal
Principal Investigator ESTCP Selection Meeting
Agenda • Introductions • Project Objectives • Project Steps
Principal Investigator ESTCP Selection Meeting
TFEIP Methods and Procedures
Presentation transcript:

ASTM G197 Task Group Chair: Joe Hayden/Pella Corporation Status Update September 22, 2014

Current TG Objective Develop an implementation plan/schedule for updating to ASTM G197 spectral weighting function Task Group resurrected at Fall 2013 Conference in Tempe Current weighting function (ASTM E891/ISO ) was developed in early 1980s

Task Group Members Joe Hayden (chair) Dennis Anderson Mike Buchanan Dave Cooper Charlie Curcija Willie duPont Chris Gueymard Scott Hanlon Jacob Jonsson Jim Larsen Roger LeBrun Christian Kohler Una Moneypenny Bipin Shah Tim Singel Jason Theois Mike Thoman Dan Wacek

Activities & Summary since March 2014  Conducted 5 conference calls  Agreement that E891/ISO is outdated and should be phased out of NFRC procedures  Extensive discussion about appropriateness of G197 for NFRC  Agreement that G197 in its current form may not be optimal for NFRC  Agreement to recommend to OPS that the TG be “re-invented”

G197 Discussion  Atmospheric data for G197 comes from ASTM G173  Developed by ASTM Committee G03  Weathering and Durability to represent materials testing and PV solar power generation stations

G197 Discussion  Atmospheric data is based on  15 western states with an average altitude of 4600 ft.  Aerosol Optical Depth (AOD) of (very clear air)  Conditions more typical of winter than summer

G197 Discussion  Conclusion  ASTM G197 in its current form does not represent an appropriate average for the majority of North America

Task Group Recommendation  Re-invent this task group  Change TG name to: NFRC Solar Spectrum Task Group

Task Group Recommendation  Change TG scope: This task group shall analyze the use of a standard solar spectrum/spectra for NFRC use, which affects simulated Solar Transmittance and SHGC ratings. This includes the following four tasks:

Task Group Recommendation 1)Create a documented advantage- disadvantage assessment of changing spectra, including an assessment of the effect on stability in NFRC programs  Document any issues with the current spectrum and how the proposed changes would address these issues.

Task Group Recommendation 2)Investigate new/existing standard solar spectra for NFRC use based on current best knowledge of solar energy and selected environmental conditions and comparing the new spectra to the current spectrum  Document how any new/existing spectra is better or more accurate than the current spectrum for NFRC programs

Task Group Recommendation 3)Strive to have any new/existing spectra adopted by a standards organization (ASTM, ISO, etc.), if applicable.  A documented effort should be made for international harmonization both on the spectra and its use.

Task Group Recommendation 4)Create a documented assessment (including pros and cons) of changing calculation methodology from direct solar spectra at normal incidence to a new methodology of an updated direct solar spectra at normal incidence combined with diffuse solar spectra at hemispherical angle of incidence.  Include implications of the new methodology being out of alignment with ISO and/or the need to update ISO

Questions ???