Barriers to Energy Storage providing Ancillary Services in ERCOT

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

Roles and Responsibilities network owners system operator(s) regulators Infrastructure brokers power exchange(s) Market Places generatorsconsumerssupplierstraders.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
Technical Conference Avoided Cost Modeling January 6, 2015.
Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Fuel Cell Forum-12 March 2007 Considerations on the purpose, feasibility, and design of incentives for Alternative Energy adoption.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Grid-interactive Renewable Heating Paul Steffes Steffes Corporation
Unlocking value from existing utility assets NARUC Meeting – February 2012
Smart Storage Space and Water Heaters Resources for Grid Management, Renewable Integration, and Conservation Paul Steffes Steffes Corporation
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
OPSI Annual Meeting Bob Hayes Vice President Natural Gas Trading October 13, 2014.
STORAGE OVERVIEW 2010 Steve Isser, JD, PhD Vice President & General Counsel Good Company Associates.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Sai Moorty ERCOT Integration Options into ERCOT systems.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Moving Toward Hybrid Power Systems Creating value with utility scale energy storage ERCOT Renewable Technology Working Group April 2009.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Hawaii Energy Storage Seminar: Utility Regulation Service
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
PJM©2011 From Pilot to Production: Integrating New Storage Products in PJM Scott Baker PJM Interconnection ERCOT ETWG Storage Workshop December 2, 2011.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Asia-Pacific Energy Regulatory Forum
DS3 and Qualifier Trials Update
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
Energy Storage Settlements Consistent with PUCT Project & NPRR461
30 Minute Reserves EPFSTF January 4,
Transforming the Electric Grid with Storage
Presentation transcript:

Barriers to Energy Storage providing Ancillary Services in ERCOT Beacon Power Corporation Barriers to Energy Storage providing Ancillary Services in ERCOT Prepared for: ERCOT Power Storage Working Group October 1, 2010

Safe Harbor Statement This presentation contains forward-looking statements, including the Company's beliefs about its business prospects and future results of operations. These statements involve risks and uncertainties. Among the important additional factors that could cause actual results to differ materially from those forward-looking statements are risks associated with the overall economic environment, the successful execution of the Company's plan of operation, changes in the Company's anticipated earnings, continuation of current contracts, changes in energy and other applicable regulations, and other factors detailed in the company's filings with the Securities and Exchange Commission, including its most recent Forms 10-K and 10-Q. In addition, the factors underlying Company forecasts are dynamic and subject to change and therefore those forecasts speak only as of the date they are given. The Company does not undertake to update them; however, it may choose from time to time to update them and if it should do so, it will disseminate the updates to the investing public. 2

Benefits of Storage Speed greatly improves regulation performance, lowers cost to ratepayers Up to 100x faster response than current providers Available a la carte Reduces the need to run additional generation units at night in order to control wind Very low operating cost, high efficiency No fossil fuel, recycles energy Zero direct CO2, NOX and other emissions Frees generation capacity (1- 3%) 3

Barrier: Cannot model Storage Characteristics Barrier: Cannot model operational characteristics of Storage under existing protocols Energy Storage Resources provide service by storing (withdrawing) and injecting energy Must have the ability to model a positive High Sustained Limit (HSL) and a negative Low Sustained Limit (LSL) which is not allowed per the protocols ERCOT models the limits of both Generators (which only inject) and Load Resources (which only withdraw) as positive values Energy Storage Resource HSL LSL < 0 Ancillary Services Provided: Reg Up Reg Down Load Resource Generation Resource HASL = LASL Recommendation: Create Storage category and enable storage to receive both positive and negative signal instructions

Barrier: Required Storage Capacity New Storage technologies designed to provide Regulation Service, such as flywheels and batteries, have 15 minutes storage capacity (Power to Energy ratio = 1 MW/250 kWh) An AES commissioned KEMA dynamic simulation study of NYISO, PJM, and CAISO shows significant system benefits from energy storage systems with 15 min of storage capability AES batteries successfully providing service in PJM Beacon Power’s flywheels successfully demonstrated in NYISO, CAISO and ISO-NE

Barrier: Required Storage Capacity Barriers: Protocols limit New Storage technologies, such as flywheels and batteries, to providing only 50% of their available capacity General Capacity Testing Requirement tests a Generator Resource at its High Sustained Limit (HSL) for 30 minutes, the HSL is then determined as the average real- time MW telemetered during the 30 minutes of constant output (Section 8.1.1.2) Under the Nodal Protocols a 20 MW/5 MWh Energy Storage Resource would only be capable of providing 10 MW over this 30 minute test, thus limiting the 20 MW storage resource to providing only 10 MW of regulation service However, ERCOT qualifies Controllable Load Resources for Regulation Up and Regulation Down service different from Generator Resources Regulation Up Qualification: Over the 60 minute qualification test one ten (10) minute period will test the Controllable Load Resources ability to achieve the entire amount of Regulation Up Regulation Down Qualification: Over the 60 minute qualification test one ten (10) minute period will test the Controllable Load Resources ability to achieve the entire amount of Regulation Down Recommendation: Create separate testing requirements for Energy Storage Resource

Barrier: No Mechanism to Manage Energy Level Inherently the capacity of a Storage resource varies based on its stored energy level (i.e. state-of-charge) EPRI confirmed that a 15 minute energy storage device can continuously provide regulation if it has a mechanism to manage its energy level Results: Regulation can have a significant energy bias (this data set had a maximum bias of 929 MWh over 1 week) Utilizing a 5-minute correction (purchase or sale of energy) dramatically reduces the amount of energy storage capacity required to provide regulation (in this example it reduced required storage from 2.1 hours to 3 minutes) Power Energy PJM AGC Data w/o 5-minute Correction PJM AGC Data w/ 5-minute Correction EPRI study showed 15 minute energy storage can continuously provide Regulation with mechanism to manage SOC

Barrier: No Mechanism to Manage Energy Level Recommendation: Allow Storage resources to utilize the 5-minute energy market to schedule energy into/out of the resource to maintain stored energy level or exempt from energy deviation charges Normally the system can provide full regulation in both directions When empty provide “Up Reg” like DR; when full provide “Down Reg” like Generator Recommendation: Allow Storage to adjust its ancillary service capacity within the hour using similar regulation performance tolerances provided to Generation A Generation Resource must meet its regulation signal within a 5 MW or 5% tolerance band for 85% of the five-minute clock intervals in the month (Section 8.1.1.4.1, para. 7) 8

Using Storage = Smart Following Adjusted Load Forecast Load Forecast Load Regulation Down Forecasted Load Adjusted Load Forecast Power Regulation Energy Regulation Up Regulation Energy 5 10 15 Minutes 5 Minutes 10 15 Interval 1 Interval 2 Interval 3 Regulation Up Storage injects energy If storage nearing empty, ISO schedules storage to “charge” and adjusts Interval 3 load forecast ISO procures the energy necessary to meet new forecast in energy market on most economic resource Regulation Down Storage withdraws energy If storage filling up, ISO schedules storage to “discharge” in interval 3 Storage injects recycled energy as price taker, displacing deployment on marginal unit in energy market Fast response storage instantaneously responds to imbalance; energy used to restore storage to its preferred state-of-charge can be economically scheduled Energy management results in sending the right energy market price signal Energy Management = “Smart Following”

Market Improvement: Value Fast Response Regulation Per MW offered, Beacon Power with its under 4 second response time is correcting more of the Area Control Error (ACE) as compared to a generator with a 5 minute ramp In addition, slow ramping resources can add imbalance to the system because of their inability to quickly change direction (from ‘Up’ to ‘Down’) 1 MW of Regulation Flywheel Generator ACE Corrected 0.48 MWh 0.18 MWh Against ACE 0 MWh -0.07 MWh Net ACE Correction 0.11 MWh Faster regulation resources provide more ACE correction per MW offered, can improve control performance and assist in meeting reliability criteria

Market Improvement: Value Fast Response Regulation Recommend: Utilize Fast response capabilities of Storage. Change formula that derives a Resource’s Regulation ramp rate from its offered capacity (Ramp Rate = Regulation Capacity/5 min) For a 20 MW flywheel plant implies a ramp rate of 4 MW/min Actual Flywheel Ramp Rate = 300 MW/min, fully deployed in 4 seconds Dispatch resources based on ramp-rate, fast resources first Recommend: Regulation payments be based on both the amount of capacity offered and resource ramp rate, “Pay-for-Performance” Barrier: Protocols pay the same $/MW clearing price for Regulation to all resources regardless of speed of response or amount of ACE corrected Example of Pay-for-Performance: ISO-NE has 2 component payment mechanism for Regulation, and procures least amount of Regulation per Load than any other ISO/RTO (.66% of load vs. ERCOT 1.8% of load) Time on Regulation Credit: Based on the amount of capacity available to the ISO to provide Regulation Regulation Service (“Mileage”) Credit: Based on the resource’s total amount of up and down movements. Faster generators accrue more Mileage because they can be more frequently dispatched to correct imbalances on the system

Barrier: Net Energy Settlement Provisions Barrier: Protocols not clear on whether Energy Storage Resources will be allowed to settle its energy charges based on its net energy Protocols only allow Generators to qualify for Generation Netting with ERCOT-Polled Settlement Meters (EPS) (Section 10.3.2.3) When generation is greater than load over a 15 minute interval the net must be settled as a generator at the Resource Node (Section 6.6.3.1) When generation is less than load over a 15 minute interval the net must be settled as a load at the Load Zone and carry load shared charges (i.e. its auxiliary station power use) (Section 6.6.3.2) However, Load Resources carry load shared charges on all withdrawals from the grid Energy Storage withdraws energy from the grid to provide Ancillary Services, not for consumption FERC has found that energy withdrawn from the grid by energy storage resources should be excluded from load charges because such energy is stored for later wholesale delivery Recommendation: Allow Energy Storage Resources to settle its energy on its net injections/withdrawals over 15 minutes and exempt energy storage from load charges

Vice President, Asset Management and Market Development Judith Judson Vice President, Asset Management and Market Development Phone: (978) 661-2070 Email: judson@beaconpower.com Isaac Read Systems and Markets Analyst Phone: (978) 661-2030 Email: read@beaconpower.com