ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.

Slides:



Advertisements
Similar presentations
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Advertisements

Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
A variety of load cases, ranging from nominal to degraded or abnormal operating conditions, were studied both numerically and analytically. The reviewers.
ENEN TCP.B6L7.B1: ANALYTICAL AND NUMERICAL EVALUATION OF UNEXPECTED HEATING LHC Collimation Working Group M. Garlasché A. Bertarelli, F. Carra,
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The integration of 420 m detectors into the LHC
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
SPS High Energy LSS5 Thermal contact & cooling aspects
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
SPL RF coupler: integration aspects
Subject: INJECTION SYSTEM Junction LINAC4-booster
Alignment of VSC components along LSS 1&5
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Thermo-mechanical simulations jaws + tank
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
The 11T cryo-assembly: summary of design and integration aspects
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Presentation transcript:

ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS PSB H- Injection - Design Technical Meeting – 3 rd October /10/2013Marco Garlaschè

ENEN 3/10/2013Marco Garlaschè Vacuum Sectorization: Not enough space for all sectorization-related components in the stripping area Radiation dose should be minimized for maintenance interventions on the injection dump area ACTION (TE/VSC) : determine alternative sectorization scenarios and evaluate impact on vacuum performance Stripping foil sector: initial baseline configuration completed

ENEN 3/10/2013Marco Garlaschè Different options presented (Design Tech.Meet 03/07/2013)Design Tech.Meet 03/07/2013 Options # 4 & 5 chosen for followup Option 4 causes more intervention on downstream valves Option 5 foresees venting of dump at each maintenance TMP gate 2X SIP Dump BHZ162 OPTION 4 OPTION 5 TMP gate 2X SIP Dump BHZ162 BHZ11 Courtesy C. Pasquino ACTION (TE/VSC) : finalize impact evaluation on vacuum performance for two options Vacuum Sectorization: completed

ENEN 3/10/2013Marco Garlaschè Results for pumping down times: (PSB Upgrade 19/09/2013 presentation)presentation Option 4: +2 hrs w.r.t. baseline Option 5: +4.5 hrs w.r.t. baseline Option 5 is new baseline (minutes)minutes NOTE: choice valid only if dump degassing stays similar to current estimation (i.e. Bulk SiC) ACTION (TE/VSC & EN/STI) : Study the impact of a sliced H-/H0 dump on the pumping down time for option 5 BASELINE Vacuum Sectorization: ongoing Courtesy J. Hansen NOTE: Option 5 has been studied w. Dump 200C  conservative as average Tdump shall be lower

ENEN 3/10/2013Marco Garlaschè Option 5: Integration ACTION (EN/MME) : evaluate integration for option 5 sectorization completed Courtesy L.Zuccalli

ENEN 3/10/2013Marco Garlaschè Sectorization implemented Corrector magnet design ongoing. For the moment no integration issue foreseen. BHZ 162 is first constraint for correctors Min. distance between correctors and BHZ162 = 57mm Option 5: Integration COMMENTS??

ENEN 3/10/2013Marco Garlaschè Option 5: Integration Equal system already present on PSB line (ref. Dwg. PSBHVI__00021) BHZ11 No integration issue foreseen. Bellow needed between valve and chamber (position errors)

ENEN 3/10/2013Marco Garlaschè System is attached to top of BHZ magnets, as for other PSB sectors Option 5: Integration BHZ162 No integration issue foreseen. Bellow needed between valve and chamber (position errors)

ENEN 3/10/2013Marco Garlaschè Option 5: Integration Pumping system implemented

ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS PSB H- Injection - Design Technical Meeting – 3 rd October /10/2013Marco Garlaschè

ENEN 3/10/2013Marco Garlaschè Injection VS. BHZx : Joining BSWx BHZx Misalignment error to be accounted for, as could cause rupture of ceramic flanges Little space between components Vacuum maintenance: 12 mm axial compression for Ag gasket insertion Low transversal forces desired Intermediate edge-welded bellow. Company feedback (for our racetrack section): max misalignment error ±1.5mm

ENEN 3/10/2013Marco Garlaschè Possible issue! ACTION: get final value of position error BHZ162 Chamber: Current Configuration Upstream Connection Downstream Connection (Injection) Chamber Fixation/regulation elements Pipe Hydroformed bellow Current alignment system not precise : connections position error>±2mm For the moment, further regulation would be obtained with deformation of semirigid hyperstatic element (undulated chamber). Ref. dwg: SI NOTE: chambers with bellows at both extremities are present on the PSB line

ENEN 3/10/2013Marco Garlaschè New bellow for sector valves Current bellow and small chamber removed due to new injection compatibility ACTION: modify fix./reg. system? Evaluate effects of regulation on semirigid element BHZ162 Chamber: Future Configuration Can modifications be done on current chamber in tunnel?...precise cut of chamber, weld in small spaces..  Baseline future BHZ162 : modifications to spare on surface Sector valves Future regulation ? NOTE: same considerations can be drawn for BHZ11 (sector at its exit, bellow present)

ENEN 3/10/2013Marco Garlaschè

ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS PSB H- Injection - Design Technical Meeting – 3 rd October /10/2013Marco Garlaschè

ENEN 3/10/2013Marco Garlaschè Following dump review (18/04/2013), baseline configuration for dump is SiC bulk (PSB Upgrade WG 13/6/2013)dump reviewPSB Upgrade WG 13/6/2013 Baseline dump design status: SiC ACTIONS MME: Dump Design o cooling system o support system o eventual shielding Resistance of magnet to heating from dump ongoing

ENEN 3/10/2013Marco Garlaschè Swelling of SiC at low dpa unknown  bulk option may suffer excessive damage (2-3 yrs expected life) New draft concept design shown (Design Tech.Meet 31/07/2013)Design Tech.Meet 31/07/2013 SiC slices + Ti slices SiC slices + Sic core in Ti Jacket Metal bulk (Al, Ti..) Dump design: new outcomes ACTION EN/MME : STI requests evaluation of feasibility and integration completed

ENEN 3/10/2013Marco Garlaschè Dump design: Integration proposals Edge-welded bellow on BSW4 side Δz = 54 mm Δz : max distance between downstream surface of red plate and downstream surface of dump Edge-welded bellow on BHZ11 chamber Δz = ( ) mm Proposal 1 (Sliced dump) Proposal 2 (Metal dump) Δz = 54 mm

ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ X CHAMBER MODIFICATIONS - DUMP AREA - FURTHER BHZ11 CHAMBER MODIFICATIONS PSB H- Injection - Design Technical Meeting – 3 rd October /10/2013Marco Garlaschè

ENEN 3/10/2013Marco Garlaschè BHZ11 Chamber: Current & Future Configuration Current bellow (useable for sectorization) Future Edge-welded bellow, in case of metal dump NOTE: chambers with bellows at both extremities are present on the PSB line Metal dump case would add one manipulation to BHZ11 chamber Most probably done on surface Ref. dwg: SI

ENEN 3/10/2013Marco Garlaschè CONCLUSIONS Evaluation performed on sector. option 5: feasible Also with baseline dump config. (bulk SiC) and whatever sector. option: -BHZ162 chamber needs to be changed (alignment issue + sector.) -following misalignement measurement, BHZ11 chamber may be changed  Need for alignment design? Integration of new dump proposals studied: -BHZ11 chamber needs to be changed for metal dump case ACTIONS: Sliced H-/H0 dump: concept. design & impact pumping down Current BHZx chambers: value of position error Future BHZx chambers: modify fix./reg. system? evaluate effects of regulation on semirigid element Baseline dump: design (cooling, support, shielding) resistance of magnet to heating from dump Need input: P LOSS temperatures Cooling on for chamber? Can magnet cooling absorb dump heat?