Review of Interventions Received after May14 th by Various Stakeholders.

Slides:



Advertisements
Similar presentations
Regulation of Low Level Waste Management
Advertisements

Brodie Consulting Ltd. 1 RECLAMATION SECURITY ESTIMATES MANDATE: MANDATE: Estimate the cost of reclamation assuming that it becomes necessary for the government.
A TECHNICAL REVIEW OF THE NAS FINAL REPORT ON CCB PLACEMENT AT COAL MINES KIMERY C VORIES OFFICE OF SURFACE MINING.
Earth Control Measures at Project Detail Site Location Marina Barrage.
By Chris Ford and James Hughes ( ) ( )
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
Jerevan November Tailing dams inspection Juliane Knaul Legal Expert, Agency of Mining, Geology and Minerals of Brandenburg, Germany AGENCY.
And the contamination of Industrial Wasteland Adam Stanley Jonathan Beeson.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Environmental Geotecnics1 Environmental Geotechnics Case Study WWII Mustard Gas Factory at Ergethan in the Former East Germany.
TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October Team Members: –EBA.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
BRC Storage & Distribution Safety and Quality Management System Training Guide
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Aquatic Plants and the Environment (SWES, ECOL, WFSc 474/574)
Open-pit Mining By Jessica Paddy. What Is open-pit mining? The process of extracting rocks and minerals through an open pit or hole in surface of the.
Mine Rehabilitation at Yerranderie
Civil engineering branches & scopes
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Storm Water Pollution Prevention Training
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Colorado Division of Reclamation, Mining & Safety Idarado Natural Resource Damage Remediation Project CDRMS Office Locations Denver Grand.
Tailings and Waste Rock Management Alternatives Study
1 CanZinco Ltd. NWB Water Use Licence Renewal, 1AR-NAN0914 Nanisivik Department of National Defence Public Hearing October 8-9, 2014 Louis Lemay P.Eng.,
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Fisheries and Oceans Canada Fish Habitat Management Program Intervention to the Nunavut Water Board on the Doris North Gold Project Cambridge Bay August.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
Final Plan Background rao6]Xu4 X6NAt5 ckwoz4mzb CanZinco submitted initial Closure Plan in February, 2002 Nunavut Water Board hearing held in Arctic Bay.
Lesson 1.5 Pg
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
Review of Interventions ____________ CanZinco Ltd.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
1 Draft Final Safe Fill Regulations Major Changes/Revisions Presented to the CSSAB November 8, 2002.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
EXERCISE 1 GROUP : OPERATOR. Safety Case : Post Closure Of A Disposal Facility Introduction  The facility is situated in Vaalputs, South Africa.  It.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Tailings Dam Stability
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Nunavut Water Board Public Hearing
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Phase 2 Hope Bay Belt Project
South Carolina Perspective on Part 61 Proposed Revisions
Various Fields in Civil Engineering By R.Janani
Meadowbank Water License Renewal
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Treatment –Reverse Osmosis (Desalination)
Mary River Project Phase 2 Proposal Freshwater Environment
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Review of Interventions Received after May14 th by Various Stakeholders

Is 7 Years Monitoring Adequate? Issue raised by Hamlet of Arctic Bay, Acres, Environment Canada, NTI, INAC and DFO, with reference to DEW Line sites. Numerous Nanisivik facilities have already been monitored for decades (e.g. landfill runoff ) and hence, not a valid comparison to the “newly” constructed DEW line landfill facilities. Current “commitment” is to 2+5 = 7 years acknowledging that “end date” may be open. Seven years adequate to establish trends for comparison to expectations.

Concrete foundations to be covered? Issue raised by Hamlet of Arctic Bay, Acres and INAC. Commitment to inspect the physical condition of two concrete slabs and investigate if potential for contamination is indicated below slab. If any contamination is found under the concrete, then a range of remediation options exists, including removal or cover. Exposing contaminants to the environment for removal can have issues that are greater to leaving in-place and monitoring. The mill slab and any contaminants there will be frozen under the 2.2 metre thermal barrier cover.

Samples of shale and sand and gravel? Issue raised by Hamlet of Arctic Bay. Samples have been brought to Public Hearing for inspection. Shale is “fissile” (breaks easily) while Twin Lakes “sand and gravel” is a very durable material.

Is it feasible to transfer tailings to the underground mine? Issue raised by Hamlet of Arctic Bay. To provide some perspective: moving 20 Million tonnes of tailings into the WTDA took 25 years with a pump operating at designed capacity on a 24/7 basis 350 days of the year Majority of tailings are frozen in place - would not be possible to reverse “flow” downhill as suggested. Thawing and slurrying tailings would impose significant risks both at WTDA and to the underground permafrost regime. Drilling and blasting, haulage of frozen materials would not be economically feasible Underground tailings would be encapsulated in frozen material - at the WTDA tailings will be encapsulated in frozen materials “Tailings” are ground waste rock and ore

Water Sampling at Twin Lakes? Issue raised by Hamlet of Arctic Bay. Samples are collected every day when water is released from the Tailings Area into Twin Lakes Creek and is only released when the water quality is acceptable. Now that the mine has closed there will be no further addition of “tailings” water and was quality is expected to improve Samples are also collected from many other locations around the Twin Lakes every week to check their quality. This will continue throughout the closure monitoring period.

PCB’s and ANFO Plant Issue raised by Hamlet of Arctic Bay and INAC. All PCB wastes will be removed from the site 2004 and shipped to a destruction facility. The active PCB transformers will be stored and shipped in 2006 (to High Lake). Samples from under the PCB storage container will be analysed for PCB’s. Samples from the ANFO plant remediation will be analysed for ammonia and other nitrogen compounds.

Contingency plans for failures after reclamation? Issue raised by Hamlet of Arctic Bay. Contingency plans have been developed for each of the major reports submitted. CanZinco is responsible for all contingency work until long term stability of the site has been determined.

Monitoring at Kuhulu Lake? Issue raised by Hamlet of Arctic Bay and Environment Canada. The fish in Kuhulu Lake were tested in 2003 and found to be healthy - not contaminated with metals from the mine. Water sampling at the inlet and outlet of Kuhulu Lake is proposed and will include: total metals, TSS, pH, temperature and conductivity.

Is a 1.25 m cover sufficient? Issue raised by Hamlet of Arctic Bay. The proposed 1.25 m is an overestimate of the needed cover thickness. Actual field data was collected at the mine from a test cover area that indicated 0.9 m thickness would be sufficient. The mine data were increased to 1.25 m to allow for a worst case estimate of global warming (as provided by Environment Canada). The cover will be monitored to check that it is sufficient.

Comprehensive Schedule for Reclamation Activities Issue raised by Acres. A preliminary Integrated Reclamation Schedule has been provided for the Public Hearing. Reclamation work is scheduled to occur over two “summers” and It is expected that schedule details will be adjusted as required as the work is undertaken.

General covering of soils Issue raised by Acres. In areas where contaminated soil has been removed, no covering is required. Only the two concrete floors (concentrate shed and mill) are proposed to be covered. All areas will be contoured after excavation of soils to provide for a safe land surface and to restore natural drainage patterns wherever possible.

Sealing of Underground Openings Issue raised by Acres and INAC. An engineering design report for sealing underground openings will be provided by CanZinco by November 30 th, This will include a proposed monitoring program for physical stability and an updated assessment of surface stability. As part of the progressive reclamation process and as required under the Mines Safety Act - some underground openings on the property have already been closed and inspected by Mines Safety.

Instrumentation Contingency Plan During Closure Period Issue raised by Acres. A professional geotechnical engineer will continue to provide recommendations to CanZinco with respect to type and number of instruments. If instruments are damaged or destroyed, the engineer will advise CanZinco as to whether instrument should be repaired or replaced.

Reclamation of Town, Industrial Complex and Dock Areas Issue raised by Acres, GN and NTI. The plan is to remove all CanZinco owned structures; other structures are at the discretion of their owners; GN has indicated that they wish to discuss incorporating their structures with CanZinco’s for teardown. A preliminary schedule has been provided. A database management system is in place to track the volumes, source locations and disposal locations for wastes materials.

East Adit Treatment Facility Issue raised by Acres. The EATF will remain on a standby status until it is demonstrated that it is no longer needed. A report on the EATF that includes a wrap up of water quality information will be provided prior to its removal.

Monitoring in Strathcona Sound Issue raised by Acres. An Environmental Effects Monitoring (EEM) Program is required under the Fisheries Act, as authorized by Environment Canada. CanZinco has proposed a program to Environment Canada that includes sampling in Strathcona Sound.

Mine Roads Issue raised by Acres and DFO. Restoration of water crossings will be performed in a manner to prevent erosion. The causeway across Twin Lakes Creek will be removed. A driveable surface will be provided across the West Twin Creek that will allow ATV access to the East Adit, Kuhulu Lake and Oceanview areas for monitoring. CanZinco can not commit to providing maintenance of a long term road for private vehicles as this conflicts with the reclamation plan.

Water Monitoring at Landfill Issue raised by Environment Canada and INAC. All parameters for gasoline, diesel and oils will be analysed in the Reclamation Period in the toe seepage, location NML-26. If elevated concentrations are identified there, then downgradient locations, NML- 29 and NML-30, will be sampled. Contingency Plan is provided in the Plan.

Other Q’s from INAC/DFO Copies of quarterly and annual monitoring reports will be provided to the Hamlet Council of Arctic Bay. CanZinco does not own the dock - reclamation (if required) will be the responsibility of the Federal Government.

Physical Stability in Reclaimed Areas Issue raised by DFO. All reclaimed areas, including along Twin Lakes Creek, are part of the proposed monitoring inspections for assessment of physical stability.

Quarry Buffer Zone Issue raised by DFO. CanZinco will maintain a 50 m buffer zone between all quarries and all adjacent water bodies.