ECAL LED monitoring system upgrade R&D status V. Egorychev, P. Shatalov, A. Zhokhov (ITEP, Moscow, Russia) E. Chernov, Yu. Guz, V. Obraztsov (IHEP Protvino,

Slides:



Advertisements
Similar presentations
Pursuit of Better testing Instrument Let's go in the grandway......
Advertisements

Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Quartz fibers for ECAL calibration system. The existing LED system: fibers to be replaced to more rad hard ones (quartz). Total of ~ 40 km to be purchased.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Shashlik type calorimeter for SHIP experiment
PANDA electromagnetic calorimeters Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group INSTR08 28 Feb - 05 Mar 2008.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
PHOBOS TOF Construction Status
Motivation There is a consensus that it is not possible to obtain a software (π 0 ) calibration with few days delay (this is to be verified, this is the.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Yu. Guz 13/06/ ECAL LED system : degradation of clear fibers The radiation degradation of clear fibers of the LED system is (still) well pronounced.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
HF PRR – 16 February Core: 600 ± 10 micron dia Clad: micron dia Buffer: 800 ± 30 micron dia Core material: High OH- sythetic Silica.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
KEN, JERI FU JEN CATHOLIC UNIVERSITY 2008/DEC./11 1 Testing Status of P.P. & APD.
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Remembering PWO Radiation hardness studies at IHEP, Protvino Y. Kubota.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
STATUS ON Optical fiber: Preliminary tests on Optical Fiber and Fiber Optic Feedthrough Massimo Rossella, Marco Prata, Tommaso Cervi INFN, Sezione di Pavia.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
Calorimeter Status: Preparing RUN II Pascal Perret LPC Clermont 25 February 2014.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Tested: 15 types of LEDs (blue, green); quartz fibers with core diameters of 300µm and 50µm. Proposal: Blue LEDs rather than green: + : larger signal,
Image: digikey.com 5 Image:
1/10 Irradiation test of CW bases Yu. Gilitsky / IHEP (Protvino)
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
ECAL LED monitoring system upgrade status 04/09/20131.
Pre-calibration of PM gain by photo-statistics
AS1 Series AREAscan™.
PMT/CW Irradiation tests-2010
NRC Kurchatov Institute, ITEP I. Korolko, M.Prokudin, Yu.Zaitsev
Introduction to Computers
CMS ECAL Calibration and Test Beam Results
Instrumentation for Colliding Beam Physics 2017
LHCb HCAL: performance and calibration
Radiation tolerant fibres for LHC controls and communications
WA105: Order Status IFAE Thorsten Lux.
Presentation transcript:

ECAL LED monitoring system upgrade R&D status V. Egorychev, P. Shatalov, A. Zhokhov (ITEP, Moscow, Russia) E. Chernov, Yu. Guz, V. Obraztsov (IHEP Protvino, Russia) 09/04/20131

Rad hard fiber – two options The 105/125µm rad hard fiber of DRAKA (pure-silica core/F-doped cladding) with acrylate coating + black painting. Total diameter is ~ 258 µm ~0.8 Euro/m for 30 km. 300 m purchased from DRAKA to produce a test bundle The 200/212µm rad hard fiber produced in Fryazino Russia (pure silica core) with metal coating. Total diameter of this fiber is ~ 240 µm This type fiber is used in CMS ~2 Euro/m for 30 km. 2x20 m samples sent us for tests. Found to be more rad hard than DRAKA. 09/04/20132

The Multicomp “MegaBright Blue” LED was chosen. With this type of LED, fiber with core diameter of 100µm is already enough for ECAL calibration system: > 500 ADC channels for the Inner zone is expected. It is important to verify it on the calibrated ECAL: it is not easy to obtain the correct energy scale in the lab tests. LED type selection 09/04/20133

Procedure for Module end ( for every fiber in a bundle): Remove the coating by a stripper on the length of about 12mm; Cut the fiber end by a cleaver; Glue the fiber into the connector; control with a digital microscope, polish if necessary Procedure for LED end (all the 16 (9) fibers): Remove the coating by a stripper for every fiber; Glue all fibers together into a brass tube 1.25 mm inner diameter; polish with a polishing machine, controlling with a digital microscope; gluing into the Plexiglas holder, together with a piece of 1.2 mm clear fiber (for PIN diode control). Module end connector Production of a test bundle with 16 fibres - I LED end connector 09/04/20134

Production of a test bundle with 16 fibres - II Gluing the fibers into end pieces control by digital 500x microscope, polishing if necessary cutting the fiber ends with a cleaver the 16 8m fibers are stretched at the table 09/04/20135

Production of a test bundle with 16 fibres - III the test bundle is ready, waiting for tests preparing the LED end: polishing the LED end, view by microscope quartz fiber bundle (16x8m) clear PSM fiber for PIN diode the LED end and module end connectors 09/04/20136

Injection test The measurements were performed with a standard ECAL LED driver at max intensity with PMT LA4956 and U ctrl =1.53 V (HV=650 V). The setup included 50 cm clear fiber Ø1.2 mm, similar to that installed in each ECAL cell. Installation of the test bundle to ECAL and measurement at HV values corresponding to different ECAL zones is necessary to understand the calibration signal magnitude in FEBs and its variations. 09/04/20137

Irradiation tests in Protvino Absorber II steel, 2 λ I. Absorber I steel, 1 λ I. During the ATLAS irradiation test in Protvino (22-31 March 2013) we were going to irradiate 10 m fiber sample(s) to 1-2 Mrad, working in “parasitic” mode. The goal is to see the transparency degradation for the blue light from our LEDs. The attenuation of the fiber was supposed to be continuously monitored with OceanOptics SD2000 spectrometer, using blue LEDs as light source. The spectrometer has 2 inputs; two 10 m samples, DRAKA and Fryazino (“RUS”) were prepared for tests. They were installed near the end of the Absorber II, after ~ λ I. The thin film dosimeters (polykaproamide) were installed at the samples (G. Britvich et al, NIM B94 (1994) 338). The LED and spectrometer were installed in the barrack; 70 m long standard multimode (50/125 µm) optical cables were used to transport light to/from the samples. They were connected to the samples at ~ 30 cm from the beam line, out of the high dose area. LHCb samples 09/04/20138

Irradiation tests in Protvino - preparations The “attenuation factor” of non irradiated samples was measured in the lab, as the ratio of light intensities with and without samples: 9.5 for DRAKA and 41 for “RUS” fibers. The main part of the loss occurs at the contact of 100 (200) µm core of sample fiber and 50 µm core transport cable, because of diameter mismatch. 10 m of fiber sample spectrometer LED boxes transport cables “short” connection of input and output 09/04/20139

Irradiation tests in Protvino Absorber-II beam samples the two samples (not on the photo) were installed between the steel sheets of the Absorber II. 09/04/201310

Irradiation tests in Protvino The plan of the test was the following: 1.beam adjustment 2.working at low intensity (~1-2·10 9 p/spill) during 2 days (~1-2 Mrad at our samples expected). For us: recording main data, then removing and development of dosimeters. 3.switch to high intensity (few·10 11 p/spill). For us: ~ Mrad expected at the samples position. Depending on the results from (2), either continue irradiation, or keep the samples away from the beam and observe their annealing. However the things went wrong from the beginning. The samples were installed before the beam adjustment. It turned out that the beam adjustment procedure requires working at maximum intensity. After ~ 6 hours, the transparency of our fibers degraded very significantly. No precise measurement therefore, only rough estimates. The main conclusion is that the DRAKA fiber is less rad hard than the “RUS” one. The latter is good enough for us, while with DRAKA we may be at risk (next slides). Another surprise was that the transport cables showed strong degradation even staying out of the irradiation zone, at ~ 1.5 m from the beam line. 09/04/201311

Irradiation tests in Protvino - results :00 Start of the “beam adjustment” at high intensity. The transparency in the DRAKA line dropped to 0 during ~ 100 krad. The other one was always alive :00 Access to the zone. The samples were removed from irradiation area and placed ~1.5 m above the beam. Removal and development of dosimeters: ~2.5 Mrad on average. Start of working at low intensity. Annealing of our samples :00 Start of working at high intensity (part of time). Degradation and annealing periods seen in the DRAKA line, finally it drops to 0 (1.5 m from the beam line!). More smooth behavior of the other line, signal finally drops to ~30 ADC counts :30 Access to the zone. The both samples are disconnected, the transport cables are shorted and left at 1.5 m from the beam. The factor of ~10 degradation in the transport cables wrt their “fresh” state :00 End of the test. Another factor of ~10 degradation in the transport cables (kept 1.5 m away!). DRAKA RUS /04/201312

Irradiation tests in Protvino - results Deep damage-annealing cycles in DRAKA fiber; drop by factor of >100 after 100 krad total damage with 2.5 Mrad received during 6 hours + 3 days of annealing (with some neutron exposure): DRAKA: factor of >20 for 10 meters  ~25% per meter RUS: factor of ~ for 10 meters  < 4% per meter 1234 DRAKA RUS ratio = 50(±10?) (cf 41 before irradiation) with samples only transport cables, 2 min later ratio >200 (cf 9.5 before irradiation) 09/04/201313

Irradiation tests in Protvino In spite of a very chaotic test, some conclusions can be made. We need ~1% stability on a time scale of ~ 1 month (~ 100 krad in the Inner area after upgrade) -may be not safe to use DRAKA -to be safe, we can use the “RUS” fiber (in spite of higher price). -also, 200 µm core  no problem with amount of light for the Inner area If we had a chance to redo the test: lower intensity! use more rad hard fiber for transport cables have an extra measurement channel for transport cables’ degradation control... 09/04/201314

cost estimate 40k Euro (DRAKA option) or 84k Euro (RUS option) + 24 man-months Can we afford the more expensive option? quartz fiber DRAKA fibers (105µm core) 30km –> 0.78 Euro/m -> Euro; RUS fibers (200µm core) 30km –> 2.0 Euro/m -> Euro; ferrules ID=125µ -> 0.3 … 0.5$/pc –> 2000 … 3250 $; ID=270µ -> 1.8 Euro/pc (in Russia) -> 11700Euro(in Russia); connectors, PMT end Black plastic end pieces (6500pc) –> 5000 Euro Black plastic nuts (6500 pc) -> 5000 Euro Brass metal tubes –> 250 Euro Cutting and drilling of brass metal tubes -> ?( 2 man-months) Tube & ferrule gluing in end piece -> ?( 2 man-months) connectors, LED end Plexiglas end piece (456 pc) –> 0.5 man-months; Brass metal tubes (same as for the other end) –> 50 Euro; Cutting and drilling of brass metal tubes -> 0.5 man-months; Plastic fibers to PIN diodes (456) -> 0.1 man-months bundles production 4 persons –> 4 bundles/day –> 5 months = 20 man-months; Polishing machine -> 1000 Euro Polishing disks -> 300 Euro Thermo shrinkable tube 1.5 mm ID (~2 km) -> ?? 100 Euro uninstalling old bundles, installing new ones 2 persons –> 2 … 3 months = 4 man-months 09/04/201315

preparation work at ITEP - status Thermo-shrinkable tube – purchased and cut Brass tube – purchased Tools for cutting and drilling the brass tube – purchased. The work will start soon. The plastic end pieces and nuts can be produced in August 2013 the earliest  connector production can start in September the earliest Problems with money for 2013: matter of planning, more should be reserved for /04/201316