19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Ensure Vendor/Engineer of Choice Product Quality
22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.
Comparison between American and European Pressure Vessel Rules
1 Conference Call December 7 th h 30 Agenda 1.Concerns on wording and inclusion of glossary of terms; 2.Issues: 3.Scope of RFP equipment required;
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
ASME Nuclear Conformity Assessment
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
SAFETY MANAGEMENT SYSTEM Non Conformance Reporting
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Compressor status AWAKE Technical Board meeting 19 August 2015.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
BU610 Applied Business Research 2016 Section A (Waterloo Part-time MBA) Faculty Advisors: Mitali De Shelly Jha Kalyani Menon
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SAFETY AND INFRASTRUCTURE REQUIREMENTS FOR TEL-2 INSTALLATION IN THE LAB Paolo Magagnin (BE-BI-ML) 24 – April
Installation of the T600 at Fermilab CSN2, September 22,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Installation of the T600 at Fermilab Fermilab, February 15,
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Plans for the construction of the new membrane cryostat in bldg 182
Strategy for conformity of non-standard cryogenic equipment
Common Projects Status
1.3-GHz Cavity Vacuum Furnace at IB4
Teleconference ACS – FREIA 18th April 2017
Third Party Activities for FH1 Project
Thomas Otto, TE Department, CERN
2K CB FDR Overview:  Agenda, Charge, Review Process
Status of the PANDA Solenoid Magnet Production in BINP
MERIT pre-installation review: Preliminary conclusions
Status of the PANDA Solenoid Magnet Production in BINP
Prototype cryomodule development
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
SC1R Cold Box PDR Assembly Sequence
Simplified Procedure Draft
Presentation transcript:

19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest bid. They now require the order to be “non- rejectable”. The order is on hold. Michel Lefebvre ATLAS LAr Week 19 May 1999

19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Pin Carrier Order –Glasseal is chosen for the contract –Ongoing coordination with BNL –Victoria’s position with regards to pin material: If we stick to the original (soft) pins, Victoria is ready to finalize a purchase order in coordination with BNL Victoria is not prepared to consider a new pin carrier material before adequate testing is made. As for the original Glasseal pin carriers, this would require a certain number of pin carriers (say 10 or 20) to be purchased by Victoria (and probably also by BNL), for detailed tests, before any purchase order can be considered. Bids –Glasseal 448 pins: US$ each for pins: US$ each for 625 –PCT 448 pins: US$ each for pins: US$ each for 625 Michel Lefebvre ATLAS LAr Week 19 May 1999

19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Vacuum Cable Order –Victoria and CRPP/STC are disappointed that BNL cannot bid in Canada –Prior to the choice of vendor for the endcap vacuum cables, Victoria believes that the following milestones must be met: A note containing the ATLAS requirements on the vacuum cables must be written and approved by the electronics convenors, the LAr project leader and the signal feedthrough project leader; The performance of the cables considered must be reported and discussed; The outcome of the bids must be compared and discussed. –We propose the following dates: May : final draft of ATLAS requirement note out for approval July : final report/presentation on the vacuum cable performance and bid results July 30th 1999: choice of vendor Sepember 1st 1999: Order out to vendor Michel Lefebvre ATLAS LAr Week 19 May 1999

19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Canadian Responsibilities Design Fabrication Signal Pigtails purchased from Orsay MOU signed Commissioning Transport Reception DC Electrical and ambient leak testing Leak tester provided by ATLAS CERN? DC Electrical tests after installation Assistance during installation: Cover up to SF50k towards the cost of an orbital cutter Assistance during welding on the cryostat Assistance for leak testing during/after installation Michel Lefebvre ATLAS LAr Week 19 May 1999

19 May 1999 LAr WeekT. Hodges Endcap Signal Feedthrough Endcap Cryostat Signal Feedthroughs Safety Certification Procedure ATL-AE-EY-OO03 Draft –point 1 The bellows is not part of the pressure vessel. This was discussed and agreed at the PRR. Adherence to the pressure vessel codes should only be mandatory for the part of the feedthrough which shares the argon space of the cryostat, namely the cold box plus the cold flange. –point 2 Discussions required with regards to TIS/TE/MC/ –point 4 We agree to perform ambient leak tests upon reception of the feedthrough units. We understand the He leak checker to be provided by ATLAS CERN. –Point 5 Victoria does not have responsibility for mechanical tests (leak test, weld tests) or procedures during or after integration of the feedthrough on the cryostat. Terry Hodges ATLAS LAr Week 19 May 1999

19 May 1999 LAr WeekT. Hodges Endcap Signal Feedthrough Design, Qualification and Test of ATLAS LAr Signal Feedthroughs TIS/TE/MC/1-2269, 26/04/99 –Point 2 We agree with the requirement that the bellows should not squirm at the exceptional operating pressure of 2.8b. We believe it may not be possible to achieve a safety coefficient on rupture of 3 without redesign. The bellows is not part of the pressure vessel, as was agreed at the PRR. –Point 3 Welding procedures and third party approval being investigated. –Point 4 We understand the ferrite content examination will only be required for one sample of each type of weld. –Point 5 We understand that impact testing is not required by the ASME code for the types of steel used in the feedthroughs. –Point 6 We understand that a pressure test to 5 times the operating pressure of 2.8b should be made on a single pin carrier. –Point 8e) Victoria does not have responsibility for mechanical tests (leak test, weld tests) or procedures during or after integration of the feedthrough on the cryostat. Terry Hodges ATLAS LAr Week 19 May 1999