Lower Lakes and Murray River Modelling (Virtual Weir Presentation / Discussion) Canberra 11 February 2009.

Slides:



Advertisements
Similar presentations
6.5 River Stability and Bank Protection John Ratsey
Advertisements

Let’s recap… definition of a resource and a region importance of water as a resource in Australia geographic characteristics of the Murray-Darling Basin.
ISSUES IN PREDICTING SOLITARY WAVES IN STRAITS OF MESSINA AND LUZON A. Warn-Varnas, P. Smolarkiewicz, J. Hawkins, S. Piacsek, S. Chin-Bing, D. King and.
Reconfiguring the River The 4 th Annual Water Symposium, 20 February 2009, Darling Harbour, Sydney Prof Mike Young, Executive Director Research Chair,
HYDRODYNAMIC SIMULATION, OF THE BRACKISH WATERS DISCHARGE FROM THE DARDANELLES STRAITS INTO THE NORTH AEGEAN SEA Kyriakos I. Kopasakis, Panagiotis B. Angelidis,
The ChesROMS Community Model
Offsetting with salinity credits: An alternative to irrigation zoning Centre for Salinity Assessment & Management Tom Spencer and Tiho Ancev, Agricultural.
Crater Lake, Oregon -589 m deep and possibly the clearest lake in the world, Transparency up to 90 m. Thermocline very deep for its size No rooted plants.
Dual Instruments or Needless Duplication? Evaluating the Combined Use of Environmental Flow and Salinity Targets Lisa Lee and Tiho Ancev, Agricultural.
Measuring abiotic components  Objectives  To make an exhaustive list of abiotic factors  To discuss the ways they are measured  To critically appraise.
Case Study Burdekin Irrigation Area. The Burdekin Groundwater Resources The lower Burdekin is Australia ‟ s foremost irrigation user of groundwater and.
Klamath Basin Water Distribution Model Workshop. OUTLINE Brief Description of Water Distribution Models Model Setups Examples of networks and inputs Demand.
Virtual Weir Phase 5 Investigations (Preliminary Results) Canberra 29 September, 2009.
Lower Cape Fear River Estuary Model Progress Report Jim Bowen, UNC Charlotte October 11, 2007 Charlotte, NC (via Centra)
Interdisciplinary Integration and Research Directions CMOP possesses a wide range of interdisciplinary research assets - Biological - Chemical - Physical.
Building a model step by step. MIKE 11 requires information on : Catchment data (Surface- root- and groundwater zones). River Network i.e. Branches; Nodes;
The Environment Institute Life Impact The University of Adelaide Fixing the River Murray What still needs to be done? IRR Regional Water Conference, Adelaide.
Flux tower representativeness >croplands< news from the workbench Martin Wattenbach Astley Hastings Pete Smith.
Hans Burchard Leibniz Institute for Baltic Sea Research Warnemünde Numerical model applications to lakes and estuaries.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND MIDDLE VAAL WMA.
Naritaka KUBO: Univ. of Tokyo, Japan
RIVER DISCHARGE *
Water resource issues in the Lower Murray Darling Basin Dr John Tibby Senior Lecturer Geographical and Environmental Studies
The murray darling basin Plan. The plan The basin plan is a coordinated plan across the four states that the Murray Darling system exists within – Queensland.
Revision 1.What does the term “arid” mean? 2.Draw the water cycle. Include: Precipitation Transpiration Evaporation Infiltration Run off Condensation 3.
Lower Lakes and Murray River Modelling Virtual Weir Investigations Canberra 31 August 2009.
Water Cycle Chapter 15. Movement of Water on Earth  Water Cycle: the continuous movement of water between the atmosphere, the land, and the oceans 
Prof. Mike Young Research Chair, Water Economics and Management The University of Adelaide NSW Country Press Association AGM, 26 th October 2007 Water.
Water Quality Modeling of Bonnet Carré Freshwater Flows in the Pontchartrain Estuary Rachel Roblin Alex McCorquodale Ioannis Georgiou.
Outline of the training. 6 October 2005, TNMC, Bangkok.
Taming the Mighty Murray Environmental significance vs economic benefits?
Team 10 Presentation Vol. II 18th February 2011 Sophia Antipolis, France Improvement by calibration or with geometry?
Mathematical Background
DSM2 Performance Measures Tara Smith CWEMF Annual Meeting February 26, 2007 Delta Modeling Section Bay Delta Office.
The Lake Biwa Project The field observation has been carried out under the Japanese hydro- meteorological project called "Lake Biwa Project". A core activity.
Evaporation in Texas CE 394K.2 Spring Evaporation In Texas  Evaporation is an important component of the hydrological cycle.  Globally volumes.
Monitoring water resources, water use, water pollution and compliance IWRM for River Basin Organisations.
A Mass-Balance, Watershed-Scale Analysis of the Chemistry of Adirondack Lakes Discussion - Day 5.
Physical Oceanography Chapter 15. Major Oceans The three major oceans are : 1._______-largest, deepest, coldest, least salty. 2.__________- second largest,
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
Groundwater-Surface Water Interactions Groundwater and surface water are intertwined Different types of interactions of groundwater with: –streams and.
Geometry, Geometry, Geometry Chris Enright CWEMF DSM2 Workshop February 6, 2007.
Development, Testing and Application of the Multi-Block LTFATE Hydrodynamic and Sediment Transport Model Earl J. Hayter See instructions for customizing.
Effects of the Elwha River Dams. Largest Watershed in the Park Covers almost 20% of Olympic National Park.
M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Reservoir 3-Dimensional Temperature Model.
Problem Identification Meeting (50% Deliverable) February 10, 2009 AECOM, Inc. and A.D.A. Engineering, Inc.
 The Living Murray. What is The Living Murray?  The Living Murray is one of Australia’s most significant river restoration programs. It aims to improve.
Surface Water Virtual Mission Dennis P. Lettenmaier, Kostas Andreadis, and Doug Alsdorf Department of Civil and Environmental Engineering University of.
Environmental Hydrodynamics Lab. Yonsei University, KOREA RCEM D finite element modeling of bed elevation change in a curved channel S.-U. Choi,
River Severn Regulation
Murray River By: C attleya Mai & Ivy Chung The Murray River was discovered by Hume and Hovell,they named it ‘Murray’ after Secretary of State for the Colonies.
US Army Corps of Engineers Coastal And Hydraulics Laboratory Engineer Research & Development Center Morganza to the Gulf of Mexico Numerical Model Study.
Ocean Water vs Fresh Water
Colorado River Management. Examine the competing demands for water in a specific river basin. Evaluate the strategies that have been adopted to meet these.
Fading to Blue: Effects of Inundation and Salinity on Tidal Marsh Vegetation V.T. Parker, L.M. Schile, J.C. Callaway & M.C. Vasey San Francisco State University.
Week 2. Work plan 2 Week 1 Week 2 Hydrological models Hydraulic models 1D quasi 2D 2D (25x25 m) Flood resilience 2D (5x5 m) Structural measures.
Going With The Flow… Or Not. One Dam’s March For Freedom.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Application of FVCOM to the Gulf of Maine/Georges Bank:
Comparison of modeled and observed bed erodibility in the York River estuary, Virginia, over varying time scales Danielle Tarpley, Courtney K. Harris,
Upper Snake Reservoir Operations October 13, 2015
The Earth’s Water Sources of Water.
Denitrification in an Urban Tidal Freshwater Wetland of the Delaware
Surface Water Virtual Mission
하구및 연안생태Coastal management
Streams Hydrodynamics
Whose Water Is It Anyway?
Open water area Franks Tract
The Murray Darling River System
Presentation transcript:

Lower Lakes and Murray River Modelling (Virtual Weir Presentation / Discussion) Canberra 11 February 2009

To be Discussed Existing Modelling: RMA (2D) and ELCOM (3D) Modelling of Virtual and Partial Weir Simulations Model Setup Model Validation Model Results & Animations Model Uncertainty Empirical Calculations: Destratification / Richardson Number Calculations Seiche Volumes

Model Setup/Extents RMA 2D (Blue) : All areas upstream of Tidal Barrages & Downstream of Lock 1, Lake Albert disconnected ELCOM 3D (Green) : From Pomanda Island (upstream of weir location) to Murray Bridge RMA simulation executed first, then results fed to ELCOM (U/S & D/S Boundaries)

Model Validation Validation period 1/1/2008 – 14/7/2008 Objectives: Best match observed hydrodynamics (WL) and salinity Ensure key processes appropriately represented Understanding of model uncertainty Key Uncertainties Additional salt load along length of River Additional irrigation demands / groundwater losses?

Predicted Water Levels – Poltalloch Plains

Predicted River Salinity – Woods Point

Predicted Lake Salinity – Spatial Validation

Predicted 3D River Salinity – Wellington

Predicted 3D River Temperature – Wellington

Comparison Measured vs Modelled River Salinity

2 yr “Prognostic Simulations” Examining what may happen in the future, given continuing high net evaporation (1982) levels, and variations in the South Australia’s border allocation (Border Allocations of 696, 796 and 896 GL/yr), through to the end of Simulations aimed at maintaining Lake Level at -1.3mAHD. Salt water introduced through Goolwa Barrage in October Stop logs positioned by-monthly based on water level balance calculation.

Predicted Water Levels – Lake Alexandrina

Timeseries Locations – Lake Alexandrina

Predicted Lake (2D) Salinities – Point 1

Predicted Lake (2D) Salinities – Point 5

Predicted Lake (2D) Salinities – Point 6

Predicted River (3D) Salinities – Wellington

Predicted River (3D) Salinities – Tailem Bend

Predicted River (3D) Salinities – Swanport

Animation: Lower Lakes 696 GL/yr

Animation: River (696 GL/yr)

Animation: River (796 GL/yr)

Animation: River (896 GL/yr)

Comparison at End GL/yr 796 GL/yr 896 GL/yr

Uncertainty Model can still be improved Validation only currently till Mid July 2008 (no destratification period) No validation data for low level and high salt available Uses 1 year (2007) wind (cannot predict future wind conditions) Wind spatially homogenous

Partial Closure Weir Simulations No Weir 1100m Gap 700m Gap 300m Gap 100m Gap

Simulated Water Level in Lake Alexandrina

Simulated Salinity (ppt) Wellington Bed

Pomanda Embayment Bathymetry River Channel Pomanda Island Lake Alexandrina N

Other Info