2014 BEST Game “Blade Runner”. Game Overview Blade Runner is based on the challenges and opportunities surrounding the transportation of wind turbine.

Slides:



Advertisements
Similar presentations
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Advertisements

Simplified overview of the 2013 BEST field and gameplay By Ian Prester.
VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.
Wind Farms 101 Gary Snyder, RES, Oklahoma State University
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
is a mobile protective steel barrier in a modular design.
Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
Capabilities Statement 1 Presented to: Bechtel Corporation.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Mississippi Valley Conference Subcommittee on Highway Transport Indianapolis, Indiana October 9-10, 2008 October 9-10, 2008.
Product Support Manager
Building a Wind Farm In Your Classroom I llinois V alley C ommunity C ollege Oglesby, IL
EverPower Eastern Projects Buckeye Wind Project Champaign & Logan Counties, Ohio 100 MW Highland Wind Project Krayn, Pennsylvania 115 MW The Allegany.
STEM Agenda Week 31 4/8 – 4/12. Agenda 4/8 Learning Target: Brainstorm and research wind turbine ideas. Agenda: Turn in Safety Pledge!!! Review Wind Turbines.
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
Private-private partnership for the future turbine technology REpower 3.2M114 Michael Baranowski EWEA ( Copenhagen) 17. April 2012.
These are all lift-type (the sweep surface faces the wind) Blue font and lines – need to know.
Creating a Renewable Energy Opportunity Plan for Southwest Wisconsin Legal Considerations Michael Allen October 21 st 2011.
TETRIX/VEX Challenge (use either robot hardware) There will be two events for the May Madness 2010 Challenge –The Grand Challenge - completely autonomous.
Converting Wind to Energy: The University of Maine at Presque Isle Wind Project By Sumul Shah Solaya Energy (A Division of Lumus) May 14, 2009.
11-Month Update Hydrogen from Small Wind Turbines.
Generating Electricity: Wind Power. Wind Resources.
Wind Energy Basics The Kidwind Project
Wind Energy for Students The Kidwind Project Copyright 2008.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
Effets of a Wind farm BY: MADISON LAYDEN. Legal issues  many new developments, technology often progresses faster than the law.  existing laws will.
Small Farm Profitability: Is Wind Energy the Answer? 1
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Wind Engineering Module 6.1: Cost and Weight Models Lakshmi N. Sankar 1.
1 IPEK energy GmbH Development and Implementation of a Wind Farm 3rd International Conference on Alternative Energy & Power ICAEP 28 March 2009.
Diavik Wind Farm NWT Chamber of Commerce 4 th April 2012.
FUTURE ENERGY WIND POWER. INTRODUCTION Wind power is simply the conversion of winds kinetic energy into electricity. Generally, wind power exists in areas.
What Obstacles Exist Concerning the Siting of Wind Generation? Steve Lindenberg, Department of Energy NARUC Wind Siting Session November 14, 2007 Anaheim,
WIND POWER. Introduction  Energy is a major input for overall socio- economic development of any society  The prices of the fossil fuels steeply increasing.
Wind Power Challenge. How does it work?  Energy 101 – Wind Turbines Energy 101 – Wind Turbines.
An activity to explore the design of turbines. What do you know about wind power? What has wind power been used for across the years?
Building a Wind Farm In Your Classroom I llinois V alley C ommunity C ollege Oglesby, IL
What is Electricity? Electricity is energy transported by the motion of electrons Electricity is energy transported by the motion of electrons **We.
1 Improving Your Alliance Performance Team Scouting and Working Together September 6 th, 2014 FTC Season Kickoff Thomas Gill.
Robotics. What is a robot? Have you seen a robot? Where? – In a photo? – Video? – In real life?
The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers.
Renewable Energy Facilities at Closed Landfills Siting and Installation Considerations January 19, 2010 Briony Angus, AICP Dana Huff, P.E. Tighe & Bond,
DRAFT Inman Middle School Community Conversation February 19, 2015.
Installation of a wind turbine. INSTALLATION OF A WIND TURBINE AUTHOR: PASQUALE NASSO TECHNICAL CONSULTANCY FRANCESCO MILANO, PIERO CARLOTTO, ALESSANDRO.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Real World Math The Algebra of Wind Turbines. Prescott Wind Turbine Site Idaho Trivia Question: What box office sleeper was filmed in Prescott, Idaho?
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Cranes LETS LIFT THE WORLD TOGETHER We bring you more than any other brand in the world.
Wind Turbines By: Brandon K. Fedeler. Goals for this project Give background information of the history of wind turbines. Explain the components of the.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
ENGLISH Sofokleous Chara Civil Engineering. Civil engineering is a profession that deals with the design, construction and maintenance of the physical.
North Coast Wind Farm Tolano Environmental Consulting.
GOOD NEIGHBOR AGREEMENTS (AUTHORITY) MARCH 31, 2016.
San Antonio BEST 2014 Kick-off Blade Runner September 13, 2014 St Mary’s University Center
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
Wind Energy Basics The Kidwind Project
2012 BEST Robotics Design Competition: ‘Warp XX’
2016 BEST GAME BET THE FARM Overview
WELCOME.
2014 BEST Game “Blade Runner”
Concept Plan for Proposed Park Near Hopewell School
A. Datum Corporation Bid package overview
CONCEPTS Drive Trains , Object Manipulators, and Lifting Mechanisms
A. Datum Corp. Bid package overview.
Agenda 9:00am Welcome & Logistics William Polanco Sr VP & Director
BOLTED JOINT ASSEMBLY WIND ENERGY FIELD SERVICE TECHNICIANS
BOLTED JOINT ASSEMBLY WIND ENERGY FIELD SERVICE TECHNICIANS
Short Passing Technique Practice 1.2 teams of 5
Presentation transcript:

2014 BEST Game “Blade Runner”

Game Overview Blade Runner is based on the challenges and opportunities surrounding the transportation of wind turbine components on US infrastructure size, weight, hazards, etc. public/private roads, bridges, etc. the on-site assembly of the complex structures.

Transport turbine components from your stockpile area to the assembly area Turbine components are large and heavy and may damage roads Your team must receive approval to transport across roads and bridges (through an oversize/overweight permit) Two transportation paths exist of varying difficulty Game Premise

Your team must beware of environmental concerns and animal habitats (Prairie Chicken) Leave prairie chicken habitats undisturbed, or Move them to a safe area Game Premise

At construction site, robots will assemble a kilowatt wind turbine (small) a megawatt wind turbine (large) At construction site, a human crane operator will aid the robot in Assembly and uprighting of the tower Expansion of turbine blades Adjacent teams may choose to cooperate in the robotic construction of a turbine and may even share components for increased cost efficiency Game Premise

Small Nacelle Game Pieces/Turbine Components Small Hub/Blade Assembly Large Blades Prairie Chicken Environment

Small Tower Game Pieces/Turbine Components Large Tower with Nacelle/Hub

Field Layout

Oversize/Overweight Permit Station Activation lever LED indicator

Bridge Activation lever

Task 1 Acquire oversize/overweight permit before the end of the match Task 2 Transport turbine components from stockpile area to the construction site via Bridge Damaged Road Task 3 Assemble turbine components to towers Task 4 Lift the turbine to fully upright/locked position Task 5 Fully expand turbine blades Task 6 Avoid damage to Prairie Chicken environments; re-locate prairie chicken environments to safe area for bonus Game Play

Completed Turbine Assemblies Small Tower Upright/ExpandedLarge Tower Upright/Expanded

Basic Scoring Task/ItemPointsState At End of Match Oversize/Overweight Permit 5Triggered (NOTE: Not required for prairie chickens or cooperative assembly scores) Prairie Chicken Environments (each) Upright and in safe zone. Upright and NOT in safe zone. Not Upright. Bridge Gates (each)5Gate opened. Transporting: Small Nacelle Small Hub/Blade Assembly Large Blade (each) Transported to Assembly Area

Basic Scoring Task/ItemPointsState At End of Match Small Nacelle Small Hub/Blade Assembly Small Nacelle+Hub/blades Small Tower Small Blades Expanded Assembled to small tower. Assembled to small nacelle. Both assembled to small tower. Tower fully upright with nacelle+hub/blades. Blades fully expanded with tower upright. Task/ItemPoints (Pos 1) Points (Pos 2) Tower Upright Bonus State At End of Match 1 Large Blade 2 Large Blades 3 Large Blades Installed on large tower hub. Small Tower Assembly Large Tower Assembly

Cooperative Play Barrier is removed for cooperative play between blue and yellow Barrier not removed for cooperative play between red and blue Permanent barrier

Cooperative Play Scoring Team A Blades Installed Team B Blades Installed Team A Points SharingTeam B Points Sharing Pos1Pos2BonusPos 1Pos 2Bonus Large Tower

Cooperative Play Scoring Team A Blades Installed Team B Blades Installed Team A Points SharingTeam B Points Sharing Pos1Pos2BonusPos 1Pos 2Bonus Same as BASIC Scoring for Team A (owner of the tower). Team B get zero shared points because they did not contribute any blades. Large Tower

Cooperative Play Scoring Team A Blades Installed Team B Blades Installed Team A Points SharingTeam B Points Sharing Pos1Pos2BonusPos 1Pos 2Bonus Team A and Team B split the BASIC score (50% each) because Team B blades were installed on Team A tower. Team A and Team B split any Tower Upright Bonus (50% each) because Team B blades were installed on Team A tower. Large Tower

Cooperative Play Scoring Team A Blades Installed Team B Blades Installed Team A Points SharingTeam B Points Sharing Pos1Pos2BonusPos 1Pos 2Bonus Owner of the tower will always get full point value for installing their own blades + 50% for any neighbor’s blades *.50 = *.50 = 60 Bonus is split 20*.50 = 1040*.50 = 20 Neighbor will always get 50% for any of their blades installed on owner’s tower. Large Tower

Cooperative Play Scoring Team A Blades Installed Team B Blades Installed Team A Points SharingTeam B Points Sharing Pos1Pos2BonusPos 1Pos 2Bonus Owner of the tower will always get full point value for installing their own blades + 50% for any neighbor’s blades *.50 = *.50 = 100 Bonus is shared 20*.50 = 1040*.50 = 20 Neighbor will always get 50% for any of their blades installed on owner’s tower. Large Tower

Cooperative Play Scoring Team A Blades Installed Team B Blades Installed Team A Points SharingTeam B Points Sharing Pos1Pos2BonusPos 1Pos 2Bonus Owner of the tower will always get full point value for installing their own blades + 50% for any neighbor’s blades (20+20)*.50 = (40+40)*.50 = 80 Bonus shared ( )*.50 = 20 ( )*.50 = 40 Neighbor will always get 50% for any of their blades installed on owner’s tower. Large Tower

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub on NacelleN/A30 Nacelle on TowerN/A+30 Hub on NacelleN/A15 Nacelle on TowerN/A+15 Hub on NacelleN/A30 Small Tower partial assembly

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub on NacelleN/A30 Nacelle on TowerN/A+30 Hub on NacelleN/A15 Nacelle on TowerN/A+15 Hub on NacelleN/A30 Team B gets full point value for installing only their own parts together. Small Tower partial assembly

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub on NacelleN/A30 Nacelle on TowerN/A+30 Hub on NacelleN/A15 Nacelle on TowerN/A+15 Hub on NacelleN/A30 TeamA and Team B split the points for multi-colored towers. Small Tower partial assembly

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub + Nacelle on TowerLowered10 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerUpright20 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Small Tower fully assembled

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub + Nacelle on TowerLowered10 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerUpright20 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Owner of the tower will always get full point value for installing all of their own parts. Owner of the tower will always get full point value for installing all of their own parts. Small Tower fully assembled

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub + Nacelle on TowerLowered10 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerUpright20 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Teams split the points for multi-colored towers. Small Tower fully assembled

Cooperative Play Scoring Team A Small Tower (Team A or Team B Parts) Small Tower Position Team A Points Team B Points Hub + Nacelle on TowerLowered10 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerLowered55 Hub + Nacelle on TowerUpright20 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Hub + Nacelle on TowerUpright10 Teams split the points for multi-colored towers. Small Tower fully assembled