By Ashish Gupta Ramesh Sharda Robert Greve Manjunath Kamath Mohanraj Chinnaswamy How often should we check our email? Balancing interruptions and quick.

Slides:



Advertisements
Similar presentations
Organizational Behaviour
Advertisements

What is Organizational Behavior?
What is Organizational Behavior?
Organisational diagnosis tools and technique
Modeling and Simulation By Lecturer: Nada Ahmed. Introduction to simulation and Modeling.
Scheduling communication to reduce Information Overload and Interruptions By Ashish Gupta Ramesh Sharda Robert Greve Manjunath Kamath Oh ! I dream.
Strategy: The Totality of Decisions
CAPACITY LOAD OUTPUT.
Towards Self-Testing in Autonomic Computing Systems Tariq M. King, Djuradj Babich, Jonatan Alava, and Peter J. Clarke Software Testing Research Group Florida.
Data Mining Methodology 1. Why have a Methodology  Don’t want to learn things that aren’t true May not represent any underlying reality ○ Spurious correlation.
1 ANALYSIS OF PROCESSING STRATEGIES TO ENHANCE EFFICIENCY AND EFFECTIVENESS Robert Greve Oklahoma State University.
Discrete-Event Simulation: A First Course Steve Park and Larry Leemis College of William and Mary.
Discrete Event Simulation How to generate RV according to a specified distribution? geometric Poisson etc. Example of a DEVS: repair problem.
Simulation.
IT Planning.
OS 352 4/24/08 I. Exam III is on Monday, 4/28, 11:45- 2:45pm, in Science Center /28 Office Hours: 9am-11am, my office. II. HR Scorecard, continued.
Organizational Influences and Life Cycle
Modeling Capabilities and Workload in Intelligent Agents for Simulating Teamwork Thomas R. Ioerger, Linli He, Deborah Lord Dept. of Computer Science, Texas.
A Realist Methodology Incorporating Large Quantitative Data Sets Andrew Brown, Andy Charlwood, Christopher Forde and David Spencer Presentation prepared.
Solving Stochastic Project Scheduling Problems Using Simulation/Optimization Approach By: Omar Al-Shehri Supervised by: Prof. A. M. Al-Ahmari Winter 1429/2008.
Designing Marketing Channels
Maintenance Forecasting and Capacity Planning
( Chapter 1 ) (B.Com IIIrd Semester ). There is no single answer to the question “What is Marketing”? Different persons understand meaning of marketing.
Graduate Program in Business Information Systems BIS 581 Business Process Management Lecture-3 Aslı Sencer Department of Management Information Systems.
Modeling and Simulation
What is Business Analysis Planning & Monitoring?
Thinking Actively in a Social Context T A S C.
Information Literacy in the workplace: implications for trainers By Dr. Mark Hepworth Department of Information Science Loughborough University.
From Evidence to Action: Addressing Challenges to Knowledge Translation in RHAs The Need to Know Team Meeting May 30, 2005.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Introduction to Discrete Event Simulation Customer population Service system Served customers Waiting line Priority rule Service facilities Figure C.1.
1 Performance Evaluation of Computer Networks: Part II Objectives r Simulation Modeling r Classification of Simulation Modeling r Discrete-Event Simulation.
Verification & Validation
Bloom's Taxonomy: The Sequel (What the Revised Version Means for You!)
Computer Science Department University of Pittsburgh 1 Evaluating a DVS Scheme for Real-Time Embedded Systems Ruibin Xu, Daniel Mossé and Rami Melhem.
1 Anabel Quan-Haase Barry Wellman Feature Interaction Workshop: Panel on New Features Ottawa, June Designing vs. Using Features of Communication.
Chapter 1: Research in the Behavioral Sciences History of Behavioral Research Aristotle and Buddha questioned human nature and why people behave in certain.
BUSINESS INFORMATICS descriptors presentation Vladimir Radevski, PhD Associated Professor Faculty of Contemporary Sciences and Technologies (CST) Linkoping.
Diffusion of Corporate Responsibility in the Forestry Sector Natalia Vidal & Robert Kozak Faculty of Forestry University of British Columbia IUFRO All.
SECTION 1 THE PROJECT MANAGEMENT FRAMEWORK
Structure of a Waiting Line System Queuing theory is the study of waiting lines Four characteristics of a queuing system: –The manner in which customers.
Principles, Practices and Dynamics of Research Management LECTURE-4 Research Design Kazi Nurmohammad Hossainul Haque Senior Lecturer, Civil Service College.
Queueing Theory What is a queue? Examples of queues: Grocery store checkout Fast food (McDonalds – vs- Wendy’s) Hospital Emergency rooms Machines waiting.
An Analysis of Response Policies under Different Arrival Patterns By Ashish Gupta Ramesh Sharda An Analysis of Response Policies under Different.
Deeper Insights from System Dynamics Models Mark Paich Lexidyne Consulting 10/9/08.
Chapter 5 Motivation Theories
Formative Research on the Heuristic Task Analysis Process Charles M. Reigeluth Ji-Yeon Lee Bruce Peterson Mike Chavez Indiana University.
Facilitating UFE step-by-step: a process guide for evaluators Joaquín Navas & Ricardo Ramírez December, 2009 Module 1: Steps 1-3 of UFE checklist.
Chapter 10 Verification and Validation of Simulation Models
Environmental and Societal Impacts Group Emergency Management Higher Education Conference Seth McGinnis
Beyond Spam: OR/MS Modeling Opportunities for Response Management Ramesh Sharda Robert A. Greve, Ashish Gupta, Manjunath Kamath, Mohan R. Chinnaswamy.
OPERATING SYSTEMS CS 3530 Summer 2014 Systems and Models Chapter 03.
Content caching and scheduling in wireless networks with elastic and inelastic traffic Group-VI 09CS CS CS30020 Performance Modelling in Computer.
A Simulation Model for Bioterrorism Preparedness in An Emergency Room Lisa Patvivatsiri Department of Industrial Engineering Texas Tech University Presented.
 Simulation enables the study of complex system.  Simulation is a good approach when analytic study of a system is not possible or very complex.  Informational,
WHAT IS RESEARCH? According to Redman and Morry,
Mining Resource-Scheduling Protocols Arik Senderovich, Matthias Weidlich, Avigdor Gal, and Avishai Mandelbaum Technion – Israel Institute of Technology.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 15-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Prepared by.
In Blogs We Trust: Their Nature and Nurture in Organizations November 29, 2005 Dan Smith Communication 692.
Investigate Plan Design Create Evaluate (Test it to objective evaluation at each stage of the design cycle) state – describe - explain the problem some.
HOW A PMO CAN DRIVE A PROJECT MANAGEMENT CULTURE Allan R. Loucks, M.A., Psy.D. Robert J. Hess, PMP January 27, 2010.
ECO 365 GUIDE Expert Level -eco365guide.com
ECO 365 GUIDE Education for Service-- eco365guide.com.
Chapter 10 Verification and Validation of Simulation Models
Prepared by Lee Revere and John Large
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

By Ashish Gupta Ramesh Sharda Robert Greve Manjunath Kamath Mohanraj Chinnaswamy How often should we check our ? Balancing interruptions and quick response times By Ashish Gupta Ramesh Sharda Robert Greve Manjunath Kamath Mohanraj Chinnaswamy

03/02/ Big XII IS Symposium- OU2 Objective of the study To improve individual knowledge worker performance by identifying policies that will :- To improve individual knowledge worker performance by identifying policies that will :- By improving response time & primary task completion time. Reduce number of interruptions. Validate the results of prior research. Validate the results of prior research. To model work environment by considering various characteristics To model work environment by considering various characteristics

03/02/ Big XII IS Symposium- OU3 Problem significance 2004 AMA Research on workplace & Productivity 2004 AMA Research on workplace & Productivity On a typical workday, time is spent on is ????? On a typical workday, time is spent on is ????? 0–59 minutes 77.9% 0–59 minutes 77.9% 90 minutes–2 hours 18% 90 minutes–2 hours 18% 2–3 hours 2% 2–3 hours 2% 3–4 hours 2.5% 3–4 hours 2.5% Osterman Research- How often do you Osterman Research- How often do you check your for new messages check your for new messages when at work?

03/02/ Big XII IS Symposium- OU4 Problem significance E-Policy Institute (2004) E-Policy Institute (2004) Annual growth rate= 66 % Annual growth rate= 66 % Corporate Research Corporate Research IBM, Microsoft, Xerox, Ferris, Radicati, etc. IBM, Microsoft, Xerox, Ferris, Radicati, etc. Need for more research in MS/IS that Looks at the problem of information overload and interruptions simultaneously. Looks at the problem of information overload and interruptions simultaneously.

03/02/ Big XII IS Symposium- OU5 Extant Research Overload due to s- First reported by Peter Denning (1982). Most recently reported by Ron Weber (MISQ, Editor-in-Chief 2004) Interruptions due to s- Interruptions due to s- Reported by some- Speier,et.al.1999, Jackson, et.al., 2003, 2002, 2001), Venolia et.al. (2003)

03/02/ Big XII IS Symposium- OU6 The Definition and Process of interruption Interrupt arrives IL + Interrupt processing Interrupt departs Recall time- RL Pre-processingPost-processing Definition- (Corragio, 1990) According to distraction theory, interruption is “an externally generated, randomly occurring, discrete event that breaks continuity of cognitive focus on a primary task.” Process- (Trafton, 2003)

03/02/ Big XII IS Symposium- OU7 Extant Research “The nature of managerial work”, Mintzberg (1976) “The nature of managerial work”, Mintzberg (1976) “Managerial communication pattern”, Ray Panko (1992) “Managerial communication pattern”, Ray Panko (1992) “ as a medium of managerial choice”, M. Markus (1994) “ as a medium of managerial choice”, M. Markus (1994) “You have got (Lots and Lots) of mail” in “The Attention Economy” by Davenport (2001) “You have got (Lots and Lots) of mail” in “The Attention Economy” by Davenport (2001) “The Time Famine: Towards a Sociology of Work Time”, Leslie Perlow (1999) “The Time Famine: Towards a Sociology of Work Time”, Leslie Perlow (1999)

Strategies Response Processing Frequency Prioritization Categorization & Organization Archiving & Storage Message Structure & Form Contextualization Affectivity Perspective Taking Attention Taking, etc. and Other Task Performance  % increase in worker utilization  No. of interruptions per task.  Add. time spent due to interruptions  response time  Primary task completion time. Individual characteristics - Age - Gender - Experience - Cognitive Style - Personality - Attitude A Framework Studying Processing Strategies Adapted from Te’eni (2001) & Speier et al. (2003) Interruptive Work Environment  and Primary Task Characteristics -Arrival Frequency -Arrival Pattern -Message Form o Size o Distribution o Organization o Formality -Content Complexity o Cognitive o Dynamic o Affective  Task Situation o Analyzability o Variety o Temporal Demands Sender Receiver Distance o Cognitive o Affective Workload Level  Dependency on Communication  Cultural Values & Norms  Work Role  Goal  Various Social Dimensions  Other Org. Factors

03/02/ Big XII IS Symposium- OU9 Research Questions RQ1: What is the optimal processing strategy? RQ1: What is the optimal processing strategy? RQ2: Is the optimal policy robust across all work environments? RQ2: Is the optimal policy robust across all work environments?

03/02/ Big XII IS Symposium- OU10 Approach/Methodology Discrete Event Simulation Discrete Event Simulation Difficulty in getting the subject for such study. Difficulty in getting the subject for such study. Can serve as a tool for theory enquiry and development (Peschl, 2001; Di Paolo, 2000). Can serve as a tool for theory enquiry and development (Peschl, 2001; Di Paolo, 2000). Demonstrate the use of a design science paradigm (Hevner, 2004) Demonstrate the use of a design science paradigm (Hevner, 2004) Another way of doing thought experiments. Another way of doing thought experiments. Hypotheses development using simulation () Hypotheses development using simulation () A technique that can often give surprising ‘emerging’ results. A technique that can often give surprising ‘emerging’ results.

03/02/ Big XII IS Symposium- OU11 Approach/Methodology Study conducted in two phases Study conducted in two phases Model simplicity- Helps in replication & extension (Axelrod, 2003 & Pidd, 1996) Model simplicity- Helps in replication & extension (Axelrod, 2003 & Pidd, 1996) Guidelines for good model development (Chwif et al. 2000) Guidelines for good model development (Chwif et al. 2000) “divide your model into parts and model each part separately creating a series of simpler models instead of one ‘huge’ one” and “only after you validate, analyze and have the results, add more complexity if you feel it is really necessary.” “divide your model into parts and model each part separately creating a series of simpler models instead of one ‘huge’ one” and “only after you validate, analyze and have the results, add more complexity if you feel it is really necessary.”

03/02/ Big XII IS Symposium- OU12 Phase-I (P-I) Research Model Performance Measures 1. % Increase in utilization 2. Number of interruptions per task. 3. Primary task completion time 4. response time. Task complexity (Pure simple) vs. (more-simple & less-complex) vs. (equal-simple & complex) vs. (less-simple & more-complex) vs. (pure complex) Workload Level Low vs. Medium vs. High Policy Flow vs. Scheduled vs. Triage Only “high” dependency on communication (3 hrs) with exponential arrivals was studied

03/02/ Big XII IS Symposium- OU13 Verification and Validation of model Two methods proposed by Sargent (2003): Two methods proposed by Sargent (2003): “subjective decision of modeling team” approach and “subjective decision of modeling team” approach and “IV & V” (independent verification and validation) approach. “IV & V” (independent verification and validation) approach. Specifically, we used animation techniques, degenerate tests, event validity, face validity, internal validity and a fixed values approach (Sargent, 2003) to rigorously verify and validate our models. Specifically, we used animation techniques, degenerate tests, event validity, face validity, internal validity and a fixed values approach (Sargent, 2003) to rigorously verify and validate our models.

03/02/ Big XII IS Symposium- OU14 P-I Result analysis cont… Profile plots E ffect of Policy x Workload Level on % increase in Utilization Effect of Policy x Task Complexity on % increase in Utilization.

03/02/ Big XII IS Symposium- OU15 P-I Result analysis cont… Profile plots E ffect of Policy x Workload Level on # of interruptions per simple task. Effect of Policy x Task Complexity on # of interruptions per simple task.

03/02/ Big XII IS Symposium- OU16 P-I Result analysis cont… Profile plots Effect of Policy on mean completion time of simple tasks Effect of Policy on mean response time of s

03/02/ Big XII IS Symposium- OU17 Phase II (P-II) Research model Performance variables (a) % increase in Utilization (b) Time spent due to interruptions (c) Average response time of s (d) Average completion time of primary task. processing strategies (C1, C2, C4, C8, C) characteristics Processing Time* (Large, Small) Arrival Rate (V. Low, Low, High, V. High) Dependency on communication (Very Low, Low, High, Very High) arrival pattern (Expo, NSPS) Work Environment * Processing time is based on category

03/02/ Big XII IS Symposium- OU18 types s differentiated on the basis of its ‘content’ or the ‘action required by the user’ s differentiated on the basis of its ‘content’ or the ‘action required by the user’ Notation typeDiscrete arrival percentage 1Priority 5% 2Spam5% 3Informative 20% 4 with non-diminishing service time 55% 5 with diminishing service time 15%

03/02/ Big XII IS Symposium- OU19 Policies Dependency on Communication Policy typeVery Low (1 hr) Low (2 hrs) High (3 hrs) Very High (4 hrs) Notation# of hour- slots Triage 8am-9am8am-10am8am-11am8am -12 noon C1 1 Schedule 8am-8:30am 4:30pm- 5pm 8am-9am 4pm-5pm 8am-9:30am 3:30 am to 5:00 pm 8am-10am 3pm- 5pm C2 2 Schedule 8am-8:15am, 11am-11:15am 1pm-1:15pm 4:45pm- 5pm 8am-8:30am, 11am-11;30am 1pm-1:30pm 4:30pm- 5pm 8am-8:45 am, 11am-11:45am, 1 pm - 1:45 pm, 4:15 pm - 5:00 pm 8am-9am 11am pm- 2pm 4pm- 5pm C4 4 Schedule 8am-8:08am 9- 9:08am and so on 8-8:15am 9-9:15am 10-10:15am and so on 8-8:23am 9-9:23am 10-10:23am and so on 8- 8:30am 9- 9:30pm :30pm and so on C8 8 Flow Processed as soon as s arrive Processed as soon as s arrive Processed as soon as s arrive Processed as soon as s arrive C Not Applicable

03/02/ Big XII IS Symposium- OU20 Methodology Discrete event simulation using Arena 8.01 Model Run length= 500 days Model Warm-up time= 50 days No. of replications of each model= scenarios evaluated for 5 different policies. Thus, Total number of simulations models= 16 x 5= 80 Total number of data points generated = 80 x 20 = 1600

03/02/ Big XII IS Symposium- OU21 Results (a) Percent Increase in Utilization

03/02/ Big XII IS Symposium- OU22 Results (b) Additional Time (min) spent per day due to interruptions

Results (d.2) Average Primary Task Wait Time

Results (d.3) Average Primary Task Completion Time

03/02/ Big XII IS Symposium- OU25 Optimal Policy ?? Previous research found C4 as the optimal policy (no consideration was given to arrival pattern and characteristics). Previous research found C4 as the optimal policy (no consideration was given to arrival pattern and characteristics). Current Research found under varying arrival characteristics- Current Research found under varying arrival characteristics- Optimal policy for primary task completion time - C1 & C2 closely followed by C4. Optimal policy for primary task completion time - C1 & C2 closely followed by C4. Optimal policy for response time – C Optimal policy for response time – C Optimal policy for reducing interruptions- C1& C4 closely followed by C2 Optimal policy for reducing interruptions- C1& C4 closely followed by C2

03/02/ Big XII IS Symposium- OU26 Practical Significance Use of C2 or C4 policy saves approx. 17min/day per knowledge worker = 3 to 4% Use of C2 or C4 policy saves approx. 17min/day per knowledge worker = 3 to 4% Total overhead per year with C2 or C4 policy for a mid size organization having 100 KW earning average salary of 5,000$ = ??? Total overhead per year with C2 or C4 policy for a mid size organization having 100 KW earning average salary of 5,000$ = ???

03/02/ Big XII IS Symposium- OU27 Limitations of the model Assumptions of the model are its limitations Assumptions of the model are its limitations Knowledge worker works strictly from 8 to 12 and then from 1 to 5pm. Need for relaxing the work schedule! Knowledge worker works strictly from 8 to 12 and then from 1 to 5pm. Need for relaxing the work schedule! Knowledge worker is busy only 90% of the time in a given workday. Knowledge worker is busy only 90% of the time in a given workday. KW is working on an interruptible primary task. In reality, not all primary tasks are interruptible. For e.g. group meetings KW is working on an interruptible primary task. In reality, not all primary tasks are interruptible. For e.g. group meetings Primary task modeled is interruptible only 3 times. Primary task modeled is interruptible only 3 times. s are not interruptible in current model. s are not interruptible in current model.

03/02/ Big XII IS Symposium- OU28 Limitations & future research Perform the study in field or experimental settings. Perform the study in field or experimental settings. Modeling utility/ life of an . Modeling utility/ life of an . Modeling group knowledge network and at organizational level. Modeling group knowledge network and at organizational level. Modeling by incorporating more doses of reality. Considering other communication media along with for e.g. blackberries. Modeling by incorporating more doses of reality. Considering other communication media along with for e.g. blackberries. Suggestions or comments or Questions????