The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.

Slides:



Advertisements
Similar presentations
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
Advertisements

Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Technical Support Activities in PH-ADO-PO
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
DPS/ CMS RRB-T Core Software for CMS David Stickland for CMS Oct 01, RRB l The Core-Software and Computing was not part of the detector MoU l.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
Gas Schedules
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
COOLING LHC RACKS PROCUREMENT
Gas System Commissioning
CMS gas systems meeting
LHCC referees’ questions, comments, requests
Current Status Future Progress Monitoring
Upgrade Strategy for the Experimental Vacuum Systems
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
LIU Wire Scanner Series Costs
Presentation transcript:

The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004

Content Context and TA1-GS section Description of Gas Project Problem Areas Manpower Schedule and Milestones Conclusions as of Today

Context Part of Central support group, in charge to build the gas systems for the 4 LHC experiments. Size of the Project (baseline): Method: –Split up the systems in functional and scalable modules that can be standardized. – Be genuine partner for the experiments, helping them to solve their problems. 4 MSF Components + Materials 60 man-years Staff, fellows and PJAS 34 man-years External manpower Type B: Type A:

TA1-GS Section: 3 Physicists (2 Staff and 1 PJAS): –Work out the solutions with the experiments –Management of the project –Definition of gas system controls (Collaboration with IT/CO) 5-6 Technicians/Engineers –Planning + organization of the construction, ordering of material etc. –Handle Industrial contracts 5-10 persons FSU + institute manpower –They assemble and install the gas modules. Type A Type B

Gas Project Gas Systems TA1 Deliverables

Our Activities Baseline: All detector gas systems of the four LHC experiments. Extras: Auxiliary systems for the LHC detectors, e.g. Flushing systems, etc. Temporary Installations for the LHC detectors for commissioning of chambers, etc. Test systems: GIF,…. Support Work: Test beam support, MFC calibrartion, etc FT experiments Limited to 1 FTE/y Case by case …. Prime activity!

Baseline Systems (Detector Volumes [m 3 ]) ATLASCMSALICELHCb MDT (800m 3 ) DT (250 m 3 ) TPC (100 m 3 ) CPC (9 m 3 ) RPC (18 m 3 ) RPC (14 m 3 ) TRD (28 m 3 ) OT (4 m 3 ) CSC ( 2m 3 ) CSC (66 m 3 ) TOF (16 m 3 ) RICH 1 (4 m 3 ) TGC (16 m 3 ) HMPID CPV PMD CPC RPC ( all < 2 m 3 ) RICH 2 (100 m 3 ) TRT (3 m 3 ) 3485 => All together 20 systems In Black: Re-circulation systems In Blue: Single pass systems

Baseline Construction Program ModulesATLASCMSALICELHCb No. of Modules Mixer Purifier Circulation Rack Pump UX Distribution Analysis42219 US Distribution Membranes1 124 Control Racks Total % 26%21%18% Number of Modules (~ Number of Racks)

System with Special Modules or Special Attention ATLAS –MDT (extra work partly covered by ATLAS) –TRT (extra work covered by ATLAS) –TGC n-pentane supply and recovery CMS: –Non ALICE: –TRD (some extra development) LHCb: –2 x RICH’s (will need extra development) –OT (??) Extra Physicist Needed These special units are included in the baseline, but they consume more manpower.

Today’s Status (on baseline production) ALICE TPC system is completed and currently under test in Bldg –First tests of PLC + PVSS software are done successfully CMS distribution modules are completed (22 racks). Mixer production is ongoing (40-50%)

Extra’s and Auxiliary Systems ATLAS –TRT cooling system –Inner Detector Purge Systems TOTEM –2 systems We have many requests for temporary installations or test systems: in particular from ATLAS and CMS, but we have no resources to satisfy this needs (since 2002). Work Package proposal from ATLAS No Work Package yet No Packages defined.

Problem Areas

Ageing risk: –Induces bottlenecks for the Component validation.. –Multiplies iterations for all decisions of the project. Schedules: 1.Delays bco holdups in components validation. 2.High overlap and early delivery dates. 3.Progress monitoring is not very transparent. 4.Work order: so far first come first served. Additional Work: –ATLAS inner Tracker –TOTEM – ….

Ageing Risk Three systems which are believed to be very sensitive. (ALTLAS TRT, MDT, and LHCb OT) We have set up a Quality plan that is agreed with the experiments, which should cover these risks. Nonetheless, numerous iterations for many decisions. (BTW: How long it takes depends very much on the people.) All resource evaluations underestimate this problem!

Schedule Current Bottlenecks: –Decision making –Component ordering is slow –Component dismantling and cleaning –Technical problems with some components after cleaning Delivery delays long due to special cleaning, overheads due to QC procedures, dismantling extra cleaning, etc. No or little stock in CERN store…. Large overlaps in schedules between experiments. –20 projects all priority “1”,… too many things worked on in parallel. –Delivery dates between 2005 and –So far: first come first served, this causes some frustration now. We need some priorities from the experiments. Bottlenecks have to be solved to increase construction capacity

New Work Packages ATLAS Tracker purge and cooling systems. Proposed by ATLAS approx. 1-2 m-y’s (of type B plus x type A) TOTEM ( no work package yet) Guesstimate:1 m-y of type “B” Temporary installations ( should be done by experiments)

Manpower

Manpower (2 types) Type A: Engineering and Management labor: These are project managers and engineers: Supervision, logistic and management of construction; conducting tests; problem solving etc. Scales with: complexity of project, novelty of the work, technical difficulties, etc. These are: Staff, fellows, PJAS, etc. Type B: Construction and installation labor: These are people that assemble the racks: Scales with: Number of racks to make. These are: FSU, Institute labor (ATLAS) (not available as staff) To be paid by Experiments

Manpower Type “A” Initial Estimate for construction Period (2003 to 2007): 60 FTE’s over 5 years Activities with general interest are covered by TA1: guess 75%, so 45 FTE’s Specialized work for individual sub-detectors: should be covered by experiments: guess 25%, so 15 FTE’s. For Baseline Systems Only.

Type “A” Manpower versus Time Total Staff Physicists Staff Technician s Fellows Experimen ts PJAS’s Experimen ts Total: Current situation and updates TA1 and Experiments In Red: includes 1 extra physicists and 1 extra technician plus the current vacancy for TA1-GS (117) (as discussed with V.V.)

Type A Manpower versus Project ExperimentPercent FTE’s (TA 1) FTE’s (Experiments ) ATLAS35%164 CMS25%110 ALICE20%92 LHCb20%82 Total100%448 Guesstimate  Extra

Type “B” Manpower versus Project Manpower Estimate [man-years] Work completed [man-years] Remaining Work [man-years] ATLAS 12.5 (Muon+TRT gas) CMS ALICE LHCb Total We need ~3 years. For Baseline Systems Only.

Manpower Type “B” versus Time Total ( ) FSU Industry (external) ATLAS Protvino Total Total of Remaining Total (remaining) Due to delays, efficiency is dropping: Example ATLAS : Remaining work is 12.2 m-y’s, remaining manpower planned is 10.8 m-y’s. For Baseline Systems Only.

Schedule

Experiment’s Schedules (Milestones) Most items must be installed until early %100 %

Construction Schedule Installation not included (10.3 m-y’s)

Comments to Schedule The construction of all the baseline systems will go on until the end of Installation is likely to continue in It is absolutely important that similar modules are constructed in series. (The experiments have to adopt to our construction schedule.) Side activities have to be reduced. Focus efforts on essentials for 2007.

Conclusions

Conclusion as of Today Present Commitments: –Baseline –If Extra’s to be added WP’s need to be completed urgently Manpower Situation: –Type A: increase from 39 to 52 FTE’s (initial estimate was 60). Extra: PH +9 FTE’s; Experiments +4 FTE’s –Type B: 35 m-y’s efficiency must be monitored (1/6 months). Schedule: –Extends to 2007 (What could be delivered after 2006 ?) –Bottlenecks must be improved Work order: –list of critical deliverables for 2007