DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

10/23/07RTML EDR Oct GDE1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
ILC Accelerator School Kyungpook National University
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
Alignment and Beam Stability
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
@ Fermilab May 15-17, 2006, FNAL KIRTI RANJAN – DOE Review1 ILC Simulation for RDR Kirti Ranjan Fermilab.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Baseline RTML in TDR ( For discussion ) S.Kuroda ( KEK )
Comparison between NLC, ILC and CLIC Damping Ring parameters May 8 th, 2007 CLIC Parameter working group Y. Papaphilippou.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Simulations (LET beam dynamics ) Group report Kiyoshi Kubo.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Placet based DFS simulations in the ILC Main Linac. Some preliminary results of error scans open for discussion Javier Resta Lopez JAI, Oxford University.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
1 ILC RTML overview Nikolay Solyak Fermilab RTML Lattice update in TDR Emittance preservation overview Other effects Conclusion ECFA Linear Collider Workshop.
26 Feb 2007 R & D Meeting Global Design Effort 1 RTML (2.6.1) and Main Linac Beamline Design (2.7.1) PT SLAC.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
GDE Main Linac and RTML Beam Dynamics Conveners: Nikolay Solyak, Cris Adolphsen, Kyioshi Kubo April 20, Room 303, 14:30 – 18:00.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Emittance preservation in the RTML of ILC and CLIC Andrea Latina (CERN) Nikolay Solyak (FNAL) LCWS University of Texas at Arlington - Oct
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
07 June 2006Peter Tenenbaum1 Ring to Main Linac and Low Emittance Transport SLAC DOE Review Accelerator Breakout.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
ILC Main Linac Beam Dynamics Review K. Kubo.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
From Beam Dynamics K. Kubo
DR Interface to Sources and RTML
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
ILC DR Lower Horizontal Emittance, preliminary study
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Summary of Beam Dynamics Working Group
ILC DR Lower Horizontal Emittance? -2
RTML Design and Cost reduction Nikolay Solyak Fermilab
Accelerator Physics Technical System Group Review
RTML and Main Linac Design (2.6.1 and 2.7.1)
12 GeV CEBAF.
Progress activities in short bunch compressors
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC

DESY GDE Meeting Global Design Effort 2 / 12 Activities Optics Design Return Line Issues –Steering and Alignment –Stray Fields –Space Charge Turnaround and Spin Rotator Tuning Bunch Compressor Tuning Next steps

DESY GDE Meeting Global Design Effort 3 / 12 Optics Design First “complete” optics since central injector Includes –Everything from DRX to ML –Different lengths for e+ and e- Return lines –Approximately correct lengths and elevation changes Doesn’t yet include –Extraction lines –Exact geometry match to site Meeting Sunday to discuss this –Adequate lattice matching in some areas Posted to RDR wiki

DESY GDE Meeting Global Design Effort 4 / 12 Return Line Steering and Alignment Usual issue of static misalignments  growth in emittance K. Kubo simulation – perform KM assuming –RMS Quad offset == 300 μm –RMS BPM-to-Quad offset == 30 μm –RMS quad/BPM roll == 300 μrad Resulted in 2 nm (10%) emittance growth –Dominated by xy coupling from quad roll Expect xy coupling to be corrected by global decoupling, not simulated in this study

DESY GDE Meeting Global Design Effort 5 / 12 Return Line: AC Stray Fields Two effects –Centroid motion (train to train jitter) Don’t want to exceed capture range of feed-forward –Emittance growth from offset in turnaround K. Kubo did simulations and estimations –Centroid: ~0.1 σ y RMS motion for 1 nT RMS dipole field Can tolerate ~2 nT if feed- forward reduces jitter ~10x –Emittance: 5% emittance growth for ~7.5 nT RMS dipole field SLAC End Station B measurements: ~2 nT –Excludes harmonics of 60 Hz US line frequency OK if ILC is at comparable level

DESY GDE Meeting Global Design Effort 6 / 12 Return Line: Space Charge For ILC damped beam at 5 GeV, incoherent space charge tune spread ~ 0.01/km Adds up to ~0.15 over length of Return line and turnaround Is this a problem? –Maybe not – single pass beamline, no resonances to worry about –Maybe so – emittance blowup, breakdown in global tuning techniques S. Panagiotis (FNAL) and M. Venturini (LBL) looking into this issue –Hope to solve it before the end of the fiscal year

DESY GDE Meeting Global Design Effort 7 / 12 Turnaround and Spin Rotator Tuning Studies performed with 2006 optics –Stronger focusing in turnaround Steering studies –Used KM + dispersion knobs –Included quad offsets, rolls + errors, BPM offsets, bend rolls + errors –Mean emittance growth reduced to 7.6 nm 6.1 nm from xy coupling, not tuned in this study 1.5 nm from chromaticity of lattice matching areas –Improved in 2007 optics Dispersion eliminated, subject to limited resolution and systematics of wire scanners

DESY GDE Meeting Global Design Effort 8 / 12 Turnaround + Spin Rotator Tuning (2) J. Smith looked at coupling correction –Used similar parameters for errors and misalignments –Coupling could be completely corrected using skew quads near the emittance station, tuning to zero in 4-D emittance station –Skew quads far away not as effective Exciting skew quads changes the orbit thru the turnaround… …which leads to vertical dispersion at the wires… …where there’s uncorrected horizontal dispersion… …which leads to confusion when trying to tune –Switching to 2-D emittance station also reduces effectiveness Correction algorithm may have been non-optimal Need to revisit this issue

DESY GDE Meeting Global Design Effort 9 / 12 BC Tuning Used 2006 optics and beam conditions –Shorter beam from DR 6 mm, now up to 9 mm –Different BC configuration K. Kubo and PT looked at the situation –Got different results – Kubo-san’s were worse than mine –Differences are now understood Kubo-san left out cavity fringe fields – reduces effect of cavity pitch by factor of 2, emittance effect by factor of 4 I left out sector bend vertical offsets – leads to ~3 nm additional emittance growth after steering –Need to go back, do simulations, see if we get the same answer?

DESY GDE Meeting Global Design Effort 10 / 12 Emittance Tuning: Summation Return line: might be OK –2 nm emittance growth dominated by coupling –Coupling not corrected in that study –Space charge may cause problems! Turnaround + spin rotator: might be OK –Dispersion correction seems very effective –Need closer look at coupling correction –Need to include bend magnet offsets Bunch compressor: Problem! –Initial simulations show 7.5 nm emittance growth at 90% CL Tolerance is 4.0 nm for all RTML! –Existing simulations not at satisfactory level of completeness –Most serious problem is cavity pitches –Possible that improvements in techniques are possible Need to migrate studies to 2007 optics –Many differences from 2006 optics Longer bunch in DR == more problems in BC –Changed BC configuration should mitigate this somewhat Weaker focusing in turnaround == fewer problems there Improved lattice matching in some areas (not all!)

DESY GDE Meeting Global Design Effort 11 / 12 Next Steps Optics Design –Work on defining magnet types with Magnet TS In progress –Define beamline geometries in DR inj/ext area In progress, meeting this week –Improve lattice matching and match geometry of design to CFS geometry Work package for Cornell in FY08 (if funded!) Emittance Preservation –Migrate to 2007 optics –Integrate dispersion and coupling correction –Improve performance in BC

DESY GDE Meeting Global Design Effort 12 / 12 Questions / Comments? “Watch out, you can’t ignore what’s going on When your visions are drying out Like the oceans from the underworld…” -Alphaville