Presenter Date Page 1 October 30, 2006 Pre-decisional. Internal Use Only Design Overview Ground Side Flight Side Interface Seal GH 2 Vent Disconnect.

Slides:



Advertisements
Similar presentations
ATR Combi & Freighter  Exit.
Advertisements

Fundamentals of Pressure Relief Devices
William Cavage AAR-440 Fire Safety Branch Wm. J
Carburetion The fuel system on a small engine consists of several components; Carburetor Fuel Lines Fuel Filter Fuel tank.
Dalton’s Law of Partial Pressure In mixtures of gases each component gas behaves independently of the other(s). John Dalton (remember him from.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
Research Activities of HFCV in Korea Speaker : Economy : The Republic of Korea.
Modeling Wing Tank Flammability Dhaval D. Dadia Dr. Tobias Rossmann Rutgers, The State University of New Jersey Piscataway, New Jersey Steven Summer Federal.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Trachea systems Insects. The life of an Insect Most insects are small terrestrial animals (live on land). They have a large surface area to volume ratio.
Pulping and Bleaching PSE 476 Lecture #5 Continuous Reactors Lecture #5 Continuous Reactors.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Section 2.8 Related Rates Math 1231: Single-Variable Calculus.
Proper Pump Installation Practices
SEALS & GASKETS FAILURE ANALYSIS OVERVIEW The following presentation will provide you with a basic understanding of the most common causes of seal failure.
High Efficiency Commercial Gas HCG Series. 2 American HCG Series The HCG Series High Efficiency Commercial Gas Water Heaters embody all that’s great about.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Module Connection and Support Arrangement Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting May 21, 2004.
Joint and Conflat Leakage, March 2007 Tests P. Titus, MIT (Mar. 7,2007) Problems/Observations: “Large” LN2 Leaks were evident - but Mercury tests were.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Assisted Bench Press Machine JARRED MORALES JUNKUN MA SPRING 2014 SOUTHEASTERN LOUISIANA UNIVERSITY.
Closed Loop Fumigation of a Concrete Elevator Broken Arrow, Oklahoma
Connecting to industry 1. 2 Safety Break-away Couplings.
Submersible Seal Top Down DP Level Assembly. DP Level Solution for Top-Down Level Measurement Applications Challenge: Many tanks go un-instrumented in.
Simulated Propellant Loading System (SPLS): Testbed for Cryogenic Component and Control Systems Research & Development J. Toro Medina, J. Sass, J. Youney,
1 Fuel Pumps. 2 Pumps 1.All oil burners for residential heating have pumps A. They are connected to a motor through a coupling 2.Description A. An oil.
Fuel Tank Inerting Joint Airbus/FAA, A320 Flight Tests
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Inerting Background Inerting refers to rendering the ullage (air above fuel) unable to propagate a reaction given flammable conditions and ignition source.
Cryo-Tracker Level, Temperature, and Mass Gauging Fluid Sensors
NFPA 31 Standard for the installation of Oil- Burning Equipment
Pro-Science 4 th International Conference of Hydrogen Safety, September 12-14, 2011, SAN FRANCISCO, USA EXPERIMENTAL STUDY OF IGNITED UNSTEADY HYDROGEN.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Research Activities of HFCV in Korea May 26 ~ 29, th HFCV-SGS Meeting Ministry of Land, Transport and Maritime Affairs, Korea Transportation Safety.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
Federal Aviation Administration 0 Composite Wing Tank Flammability April 2-3, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
House Styles for ICT How we expect your work to be presented……
AAE 450 Spring 2008 Steven (“CJ”) Hiu 02/20/2008 Structural Analysis: Overpressure Safety MAT & FAM Coder – Structures CAD – Tanks, Intertank Couplers.
Cargo Bay Fire Protection with a Fuel Tank Inerting System
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
SAFETY WITH CRYOGENIC SYSTEMS. Safety aspects 1. Physiological 2. Suitability of materials and construction 3. Explosions and flammability 4. Excessive.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
TESTING AND ANALYTICAL MODELING FOR PURGING PROCESS OF A CRYOGENIC LINE A. Hedayat 1, P. V. Mazurkivich 1, M. A. Nelson 1, and A. K. Majumdar 2 (C2PoL0)
13.1 A Model to Explain Gas Behavior
Chapter 14 Review “The Behavior of Gases”. First Item: Know the Theory and Definitions of the Gas Laws PTV Remember.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Video 10-1 Kinetic Molecular Theory Properties of Gases Deviations from Ideal Gas Behavior.
FUEL SYSTEM The fuel system is comprised of three interconnected crash resistant fuel cells. Two forward fuel cells are located under the aft facing passenger.
Shanghai Jiao Tong University Effect of pressure control range on the thermodynamic venting of liquid hydrogen in a tank at zero gravity Institute of Refrigeration.
Thermal stratification in LH2 tank of cryogenic propulsion stage tested in ISRO facility Presentation to ICEC26-ICMC th March 2016 M Xavier, Division.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Anhydrous Ammonia Storage and Handling Original Power Point Created by Brandon Ritter Modified by Georgia Agricultural Education Curriculum Office June.
Effective Methods to Test the Fuel Pressure Regulator in your Car.
11/18/2018 Development of Cryogenic Engine for GSLV MkIII: Technological Challenges RS Praveen, N Jayan, KS Bijukumar, J Jayaprakash, V Narayanan, G Ayyappan.
Joint and Conflat Leakage, March 2007 Tests
Volume 100, Issue 6, Pages (March 2011)
450 2½”- 3”.
Bicuspid Aortic Valves and Dilatation of the Ascending Aorta: Reply
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Presenter Date Page 1 October 30, 2006 Pre-decisional. Internal Use Only Design Overview Ground Side Flight Side Interface Seal GH 2 Vent Disconnect

Presenter Date Page 2 October 30, 2006 Pre-decisional. Internal Use Only STS-116 GUCA Performance Body Seals Pre STS-116 and STS-122 and subs STS-116

Presenter Date Page 3 October 30, 2006 Pre-decisional. Internal Use Only Background – Design / Leakage History (Pre-STS-116) STS-116 / ET-123 was first use of new ground umbilical disconnect flight seal design –One-piece seal replaced with flexible two-piece seal to accommodate misalignment during installation History of leakage with previous disconnect ground side / flight seal design STS-27 through STS-105 (>120 loadings) STS-108 through STS-115 (19 loadings) and STS-122 and subs STS-116/ET-123 (2 loadings) Design History Ground Side Bellows Probe Material: CRES 321 Spring Force: 165 lbs min. Material: Inconel 718 Spring Force: 225 lbs min. Material: Inconel 718 Spring Force: 225 lbs min. Flight Seal Design One-piece rigid seal Two-piece flexible seal Leakage History (11) occurrences of leakage. Contingency procedures required on (4) occurrences to reduce / control leakage No leakage observed(2) occurrences of leakage. Contingency procedures not required

Presenter Date Page 4 October 30, 2006 Pre-decisional. Internal Use Only Historical Changes Seal Graphic: Flight-Side Seal Configuration (Pre-STS-108 and Post STS-120) STS-116 Flight-Side Seal Redesign

Presenter Date Page 5 October 30, 2006 Pre-decisional. Internal Use Only IFA STS-116-T-001, Unexpected GH2 Leakage Critical Environments For Excessive Leakage Not Present During Majority Of Loading Operations Fast Fill Tank volume partially filled with LH 2 Ullage gas consists of mixture of GHe / GH2 – GH2 concentration increases as tank is filled Vent valve opening / closing Tank pressure: 32.9 – 43.2 psia Transition to Topping (leakage detected on STS-116) Valve opens and vents high concentration of GH 2 and some LH 2 into the vent line Vent line/umbilical interface exposed to rapid cryo cool-down/press. pulse Background – Loading Phases GH2 unavailable GH 2 vent valve open LH 2 GH 2 GH e GH 2 press. line Ground/ET Interface GH 2 vent valve GH 2 diffuser GH 2 vent line GH 2 vent valve closed LH 2 Terminal Count Vent valve closed – GH2 unavailable Replenish Steady-state thermal conditions present No delta pressure at umbilical / tank interface Less volume / lower concentration of GH2 than during topping phase LH 2 GH 2 vent valve remains open in Replenish