SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
Advertisements

The ATLAS Pixel Detector
Radiation Tolerance D. C. Christian, J. A. Appel, G. Chiodini,
LHCb PatVeloTT Performance Adam Webber. Why Upgrade?  Currently we de-focus the beams o LHCb Luminosity ~ 2x10 32 cm -2 s -1 o ~ 1 interaction per bunch.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Pixel Upgrade Plans ROD/BOC PRR July 17, 2013 T. Flick University of Wuppertal.
Fine Pixel CCD Option for the ILC Vertex Detector
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
2/2/2009 Marina Artuso LHCb Electronics Upgrade Meeting1 Front-end FPGAs in the LHCb upgrade The issues What is known Work plan.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Sensor Choice The story here is surely damage – See that silicon worked well in the PLT test until we shifted the timing to optimize diamond Reducing BX.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
LHC detector upgradesSteinar STAPNES1 Physics motivation for increased luminosity  Some examples of the physics potential Machine Upgrade  Detector interface.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
M. Gilchriese ATLAS Pixel Upgrade Thoughts on US Role.
SCIPP Santa Cruz Institute for Particle Physics
p-on-n Strip Detectors: ATLAS & CMS
REQUIREMENTS FOR A NEW PIXEL CHIP L. Demaria - Torino INFN Lino Demaria - New Pixel Chip - Torino 01/06/2011.
ATLAS Trigger Development
1 Marina Artuso Syracuse University For the LHCb VELO Group 7/29/2008 Marina Artuso Vertex 2008 LHCb Vertex Detector Upgrade Plans.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
M. Gilchriese 1 Pixel R&D The useful lifetime of the innermost pixel layer is expected to be limited to a few years at design luminosity. However, there.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Leonardo Rossi – EB 68 – Oct 5, Pixel status and schedule Rad-hard electronics (has always been) on the critical path for the construction of the.
9/27/07Marina Artuso Vertex LHCb Upgrade Plans Marina Artuso Syracuse University For the LHCb VELO Group.
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
Mu3e Data Acquisition Ideas Dirk Wiedner July /5/20121Dirk Wiedner Mu3e meeting Zurich.
R&D for SLHC detectors at PSI and Geneva CHIPP workshop on the high-energy frontier of particle physics Zürich 6. September 2006 R. Horisberger (Paul Scherrer.
Technology and R&D Summary and next steps Burkhard Schmidt.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Dima Maneuski, Advances in rad-hard MAPS 2016, Birmingham
 Silicon Vertex Detector Upgrade for the Belle II Experiment
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
TileCal issues and Combined Performance
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
detecteurs 3D et hybridisations 3D GOSSIP
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
SVT detector electronics
SVT detector electronics
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
SVT detector electronics
Tracking in SuperLHC 1. Radiation damage
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High Luminosity scenarios for LHC is presented. The table is interpreted for the ATLAS Pixel Detector with some comments on the critical issues.

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July Stefan Scoreboard Table  Present ATLAS Pixel detector limits at high luminosity LHC  As today, we think that all options, but super bunch, can be taken in consideration for a partially redesigned Pixel Detector

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July Comments to SLHC for Pixel  Depending from the SLHC scenario some upgrade or redesign of the Pixel detector must be done. Today Pixel detector has some contingency to operate at higher integrated luminosity or event rate, but B-layer is the one which will impact first the limit of the technology.  Critical aspect for the Pixel SLHC are:  Sensor depletion voltage w.r.t. integrated dose. Oxygenated sensor have demonstrated to work up to 60 Mrad (3 B-layer, 10 layer1). New sensor design and R&D  ROSE, RD-50.  FE and MCC electronic chips. Some 0.25 µm ATLAS Pixel chips irradiated (by dosimetery error) to 100 Mrad with acceptable performance. Smaller geometry and thin gate oxides looks very rad- hard. Single Event Upset (SEU) is critical, and will get worse with smaller geometry. Opto-chip may need a placement at outer radii.  R/O. Luminosity increase has its impact in two ways: buffer overflows and saturation of links. MCC in addition is sensitive to trigger rate receiving only data passing LEV1. Layer1 & 2 use only 1/2 of the MCC design bandwidth  a second link can be added: replace of optoboard and adding a second fibre. B-layer needs a rethink of the chip architecture if SLHC push luminosity to its limits. 25 ns bunces are preferred, but 75 ns bunches can work  simulation. Superbunch seems far from any tracker design reach.

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July FE & MCC Rad-hard Issues  Present FE & MCC chips have some contingency in the rad-hard value expected for nominal LHC luminosity.  For an upgrade of the detector 0.13 µm CMOS technology seems a promising candidate:  First measurements for 0.13 µm shows that thin oxide gate devices has very low or no VT shift (see plot: Dual Gate have 5 nm oxide, other devices 2.2 nm or lower)  SEU is an other issue:  FE & MCC have replica logics to increase SEU tolerance;  0.13 µm has higher SEU X-section due to smaller geometry and lower VDD. Ref.: K. Einsweiler, On-detector Electronics for ATLAS ID Upgrade, US ATLAS Upgrade WS  0.13 µm chips can be developed in the time scale for SLHC (2012)

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July High Luminosity B-Layer  Pixel telescope used at high intensity test beam to test inefficiencies induced by particle rates.  Plot show the missing hits (mainly due to FE chip R/O) Ref.: B.Osculati & L.Rossi, Pixel Week Feb’04

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July MCC & ROD R/O Inefficiencies MCC R/O architecture simulated for the FDR (24 event pileup kHz trigger rate) shows a good margin even for the B- layer at 80 Mb/sec data link (it is foreseen to use 160 Mb/sec) At high luminosity may be necessary to increase the number of RODs Simulation needed for different SLHC scenarios. Ref.: C. Schiavi, MCC FDR, Dec’02

SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July Conclusion  Pixel Detector is one of the best candidate for tracking at SLHC in the region below 20 cm. But significant R&D is needed.  First upgrade at the horizon is the relatively limited B-layer (2010), this could already benefit from R&D in the sensor and electronic area (0.13 µm chips). It would be natural to use this upgrade as an intermediate test bench towards the “beyond the state of the art” of LHC.  In case all the R&D efforts are not enough to have a detector surviving the harsh SLHC environment at 5 cm from beam, we may still have the contingency to increase the radius of the Pixel detector, even if it is not what we prefer…