TOF Project Construction Project Plan

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

©2001 Plan B Systems Inc. PBSi Quantitative Cost/Schedule Risk Analysis.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
SWE Introduction to Software Engineering
ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik.
LIGO-G M LIGO Laboratory1 Adv. LIGO Program Management (PM) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
LIGO-G M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.
©Ian Sommerville 2006Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
 Probably the most time-consuming project management activity.  Continuous activity - Plans must be regularly revised.  Various different types of.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Paul S. Adler A Sneak Preview of the PMP Exam-Prep Workshop.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
05/19/08 PM Boot Camp I International Sign Association Risk/Regulatory Compliance Department Las Vegas Division.
DEFINING THE PROJECT CHAPTER 4.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Resources Performance time Project Planning Phase : Generating Tasks & Identifying Responsibilities 1.
Geog 469 GIS Workshop Project Management.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 1 Office of Science NCSX Project Review of NCSX April 8-10, 2008 Cost and Schedule Ron.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II CD-1 Cost Estimate Development Diane Hatton Associate Director for Administration.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Felix B. Fernandez LUSI DOE Review August 20, 2008 PMCS Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) Felix B. Fernandez.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
EDM Collaboration Meeting, October 5-7, 2006 WBS He Services (He3S) “Homework” Steve Williamson.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Software project management 3rd Umer khalid Lecturer University of Lahore Sargodha campus.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
1 Project management Organising, planning and scheduling software projects.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Project Management W. J. Foyt
DEFINING THE PROJECT CHAPTER 4.
External Independent Review (EIR)
Project management Lecture 9
Project Management Considerations
Conventional Facilities
Presentation transcript:

TOF Project Construction Project Plan Technical, Cost, Schedule, Management Review Ralph Brown, 8/22/05

Project Management Controls WBS Structure. ESH&Q Design Standards and Guidelines. Engineering Drawing Controls. Change Control Procedures. Contingency Analysis. Resource Loaded Project Plan.

Work Breakdown Structure

Design Standards and Guidelines Design must comply with BNL/C-A/STAR institutional standards (SBMS) for ESH&Q requirements in engineering design, electrical safety, work planning and control of experiments, experimental safety review, STAR design review and C-A OPM. Bill Christie STAR/C-A Safety Liaison. Local institutional standards used for fabrication, assembly, and test. Q/A, managed by TOF project office with institutional MOU’s, compliance with local institutional procurement policies. Large procurements require a Statement of Work and Product Specification.

Engineering Drawing Control

Change Control Procedures

Contingency Analysis Risk is a function of the following factors:  The sophistication of the technology, the maturity of the design effort, the accuracy of the cost sources and the impact of delays in the schedule.  Risk analysis shall be performed for each WBS element at the lowest level estimated.  Results of this analysis will be related to a contingency which shall be listed for each WBS element.  The goal is to make the method of contingency determination uniform amongst all project WBS elements.

Contingency Analysis

Contingency Analysis

Contingency Analysis

TOF Project Resource Loaded Plan

TOF Project Resource Loaded Plan (cont.)

TOF Project Resource Loaded Plan (cont.)

TOF Project Resource Loaded Plan (cont.)

TOF Project Resource Loaded Schedule All costs are in FY05 dollars, and institutional labor rates and procurements are fully burdened STAR Operations labor and Scientific labor are contributed cost. TOF project calendar assumes 220 days or 1760 hrs per yr. MSTC (travel & misc. cost) for subsystems included. Project milestones are included. Procurements & deliverables have been phased into FY’s. Subsystem tasks have been linked & constrained to develop critical path. Monthly subsystem reporting on task % complete to project office. Quarterly reporting of project performance and milestone completion to BNL Project Manager.

TOF Project Critical Path

TOF Project Resource Usage