Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab.

Slides:



Advertisements
Similar presentations
Parity Mtg, 18 May 2007 Bob Michaels Lead Target and Warm Septum Interface Performance of Lead Target during e06007 Radiation for PREX, extrapolated from.
Advertisements

Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Application of Steady-State Heat Transfer
Simple and Effective Work Roll Cooling Modification for Hot Mills
Energy deposition and neutron background studies for a low energy proton therapy facility Roxana Rata*, Roger Barlow* * International Institute for Accelerator.
Extended Surfaces Chapter Three Section 3.6.
Measurement of the  n(p)  K +   (p) at Jefferson Lab Sergio Anefalos Pereira Laboratori Nazionali di Frascati.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Shielding Studies using MARS Monte Carlo code Noriaki Nakao (SLAC) Jan. 6, 2005, WORKSHOP Machine-Detector Interface at ILC, SLAC.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Beam Therapy Equipment 3 Patient Treatment and Accessories.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
ANALYTICAL X-RAY SAFETY User Training Centre for Environmental Health, Safety and Security Management.
1 cm diameter tungsten target Goran Skoro University of Sheffield.
Future of Antiproton Triggered Fusion Propulsion Brice Cassenti & Terry Kammash University of Connecticut & University of Michigan.
Study of a new high power spallation target concept
Lecture 1.3: Interaction of Radiation with Matter
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Inter-comparison of Medium-Energy Neutron Attenuation in Iron and Concrete (8) H. Hirayama and Attenuation Length Sub-Working Group in Japan.
Estimation of temperature increase in the dump through Monte – Carlo simulations and rough calculations N. Charitonidis (EN/MEF)
Starter Your friend gives you a solid object that is a rectangular solid. Explain how you could determine the density of the material. Your friend gives.
Design Optimization of Toroidal Fusion Shield  Fusion Theory [BLAHBLAHBLAH] Fusion energy production is based on the collision nuclei in a deuterium and.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Monte Carlo methods in ADS experiments Study for state exam 2008 Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
1 Authored by Jefferson Science Associates, LLC under DOE Contract # DE-AC05-06OR23177P. Degtiarenko 12/13/2009 GEANT3/4 Simulations for Radiation Budget.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Electronuclear Interactions in FLUKA
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS2 Bulk Shielding calculations Methodology P.K. Job Radiation Physicist Peer Review 2007 March 27, 2007.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
Radiation study of the TPC electronics Georgios Tsiledakis, GSI.
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
OUTGOING NEUTRONS IN CALET CALET AIMS AT DETECTING UHE CR ELECTRONS HIGH REJECTION FACTOR FOR PROTONS/NUCLEI NEEDED POSSIBLE IMPROVEMENT RESPECT ‘STANDARD’
AWAKE: D2E for Alexey beam properties Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke DGS/RP.
Muon-induced neutron background at Boulby mine Vitaly A. Kudryavtsev University of Sheffield UKDMC meeting, ICSTM, London, 27 June 2002.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Albert Riego, Guillem Cortes, Francisco Calviño July 22 th, 2015 Universitat Politecnica de Catalunya, Barcelona (Spain) Third BRIKEN WORKSHOP – IFIC (Valencia,
Ali Ahmad FLUKA code validation of nuclear data required for the spallation target design in Accelerator Driven Subcritical Reactors ThorEA Meeting – Daresbury.
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
Induced-activity experiment:
Forward Tagger Simulations
Produktentwicklung und Maschinenelemente
Inter-comparison of Particle production (2)
Methods of Experimental Particle Physics
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Neutronics Studies for the Nab Experiment
Jin Huang Los Alamos National Lab
Thin Target effusion calculations using GEANT4
Radiation Shielding Val Kostroun REU Presentation, June 1, 2009
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Higgs Factory Backgrounds
Revised estimates of heat loads and radiation damage in the IT and D1
Background Simulations at Fermilab
Presentation transcript:

Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab

Modeling electromagnetic cascades using Monte Carlo methods: EGS4, GEANT3, MARS, FLUKA, Geant4, others… JLab specifics: GeV energy range, neutron production and other hadronic reactions in electronuclear interactions are significant in solving shielding problems Modified version of GEANT3 developed in 1995 including electro-, and photonuclear reactions, GEANT/DINREG – P. Degtyarenko, M. Kossov Used in many shielding and background calculations at JLab. E-M cascade calculations agreed with EGS4 to 5-10%. Hadronic production has been compared with several experimental results, and agreed with experimental measurements with accuracy 30-50% GEANT/DINREG has been used in the present Calorimeter calculations

Silver calorimeter (diameter 15 by length 24 cm) model calculation results: Little dependence on beam energy in 0.5 – 12 GeV range E-M loss = 1.1± 0.2%, Hadronic loss = 0.34 ± 0.17% Electromagnetic part of the losses can be decreased significantly by using outer layer of the cylinder made of Tungsten Silver can be replaced by Tungsten completely as the thermal conductivity and melting temperature combination for Tungsten is acceptable Tungsten advantages are better energy confinement and smaller radiation fields, both prompt and due to activation ALARA principle at JLab: as low radiation production as reasonably achievable

Tungsten solution minimizes energy losses while keeping heating/cooling times acceptable Cylinder geometry diameter 16 by length 16 cm Entrance hole diameter 1 by length 1 – 5 cm Optimal entrance hole length ~ 2.5 cm Cut corners 1 by 2 cm at the entrance face and 4 by 5 cm at the exit face: decrease heating and equilibration time, but increase cooling time, while keeping losses practically unchanged Bottom flat surface: shave 1 cm thick layer Result: 0.46 ± 0.20 % losses in the beam energy range 0.7 – 12 GeV, with the hadronic losses contributing 0.3 ± 0.15 %. E-M losses decreased 10 times, hadronic losses roughly remained the same as in the Silver Calorimeter variant

Power density distribution in Tungsten calorimeter calculated for beam power = 5 kW at energies from 0.75 to 12 GeV Conservative steady-state evaluation of temperature distribution inside the calorimeter showed maximum temperature at the center not exceeding 1000 °C when average temperature of the block is approx. 50 °C At 5 kW beam power, maximum local power density and local temperature will be reached at low beam energies

Calorimeter Operation, Radiation Issues High levels of prompt radiation around the device dose rates of the order of 10 krad/h at 1 meter Activation of the calorimeter self-shielding cool-off periods may be required before handling additional local shielding may be needed Environmental radiation dose rate at CEBAF boundary will be times the “average design limit” Calorimeter operation must be included in the Radiation Budget for a particular experiment

Conclusion Tungsten Calorimeter 16 cm length by 16 cm diameter provides better beam energy confinement and lower emitted radiation as compared with 24 by 15 cm Silver Calorimeter Prompt dose rates around the calorimeter are expected of the order of 10 krad/h at 1 meter, special shielding should be used to protect sensitive electronic equipment in its vicinity Dose rates at CEBAF boundary during the operation of the calorimeter will be high, but manageable taking into account small cumulative operation times for the device. Operation of the device must be accounted for in the JLab Radiation Budgeting procedures Off-line handling of the device will require special technical and administrative controls by the JLab Radiation Control Group