THEMIS MPDR PM 11/12/20030 Mission PDR Cost & Schedule Review Probe & Probe Carrier Program Management Director of Civil and Commercial Space Michael Cully.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Introduction to ARA’s Proposal Resources Don Cole
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
XII- COST CONTROL, MONITORING & ACCOUNTING
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Chapter 10 Project Monitoring and Control
How to integrate the parts of your project to achieve success.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Server Virtualization: Navy Network Operations Centers
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
From Research Prototype to Production
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Management & Development of Complex Projects Course Code - 706
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
THEMIS Pre-Confirm 02/04/040 Final Inputs Pre-Confirmation Review February 4, 2004 Probe & Probe Carrier Program Management Director of Civil and Commercial.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Program Management Agenda
Camera PDR/CD1 Planning 19 September 2008
Process Economics Factors that affect profitability
Ken Shoquist VP, CIO Information Technology Board Meeting October 2003
THEMIS Mission Confirmation Readiness
0.0 Instrument Suite Name Presenter’s name
Peer Review Agenda (Suggested).
LSST Project EVMS Performance Overview Kevin E
Lockheed Martin Canada’s SMB Mentoring Program
Integration and Test Organization Chart
Presentation transcript:

THEMIS MPDR PM 11/12/20030 Mission PDR Cost & Schedule Review Probe & Probe Carrier Program Management Director of Civil and Commercial Space Michael Cully Manager of Finance and Planning Purshina Patel

THEMIS MPDR PM 11/12/20031 Program Management Agenda  Swales Generic Preliminary Process Flow  Swales Generic Detail Design Process Flow  Schedule Process  Schedule Contingency Overview  THEMIS Major Milestone Schedule  Mission Level Critical Path Analysis  Critical Path Analysis Drill Down  Probe Slack Analysis  Flight Software Build Schedules  Example of Open Plan Schedule (Detail Schedule with tasks)  WBS Reporting Levels –UCB/Swales reporting levels  Cost Proposal Development Summary  Summary of Costs per WBS  Cost Management at Swales  Phase B Burn Rate  Major Risk Areas

THEMIS MPDR PM 11/12/20032 Preliminary Design Process

THEMIS MPDR PM 11/12/20033 Detail Design Process

THEMIS MPDR PM 11/12/20034 Schedule Process  Phase B –Vendors & Subsystem Leads work in MS Project due to ease of use –MS Project will not meet the long term needs of the program –Current master schedule / Open Plan (Welcom s/w suite) Converted into Open Plan Allows for the ingest, digest and output of both MS Project and PRIMAVERA Ability to link to accounting system Ability to perform complex resource scheduling Ability to perform Monte Carlo risk analysis –Phase B detail schedule Using interval milestones to drive program (i.e. completion of drawing package or start of s/w build 2) Based on Phase A information WBS Driven Vendors supply MS Project files driven by SOW –ARDE –Aerojet –GDDS Planner performs logic check of schedules and assesses need dates based on the Phase A anchor dates and then loads this information into Open Plan –Reporting will continue in MS Project Final testing of system complete in November Easy conversion from Open Plan to MS Project

THEMIS MPDR PM 11/12/20035 Schedule Process  Integration & Test Schedule –Based on input from GSFC pre-confirmation review Creating further detail for the I&T flow Emphasis on Instrument Integration Emphasis on Environmental Test program Including the “nitty-gritty” type activities Using 5 day work week / 8 hour days Applying resource loading / leveling Also assessing production planning and it is integrated with Work Order Authorization (WOA) system

THEMIS MPDR PM 11/12/20036 CSR Schedule Contingency  Schedule contingency is driven by Long Lead Procurements: –Propellant Tanks –RCS –Transponder –BAU Single Board Computer Power Control Electronics SMEX/TRIANA Comp Card –Base Panel  Probe 1 is completed first and is the trail blazer for Probes 2 – 5  Baseline is 12 weeks of schedule contingency (60 working days) between Probe 1 Delivery and the start of Probe I&T  The “A” Team consists of the full complement of the I&T Team. The “A” team builds Probe 1 and then bifurcates into two Teams to build Probes 2-3 & Probes 4-5 in parallel. A residual of the “A” team continues on with the environmental testing of Probes.  Probe Carrier is built in parallel by a separate Mechanical Team and links up with Probes at test facility  Schedule contingency at back end of program has been lumped into a full 60 days (4W +4W +4W) based on direction from GSFC

THEMIS MPDR PM 11/12/20037 Major Milestone Schedule #1  General Assumptions –Five day work week with 8 hrs per shift –Exception to above rule will be TV/TB testing and major moves –I&T schedule constrained by Team availability starting with Probe 1 build –Weekends can be used to make up schedule prior to mission I&T

THEMIS MPDR PM 11/12/20038 Summary Schedule

THEMIS MPDR PM 11/12/20039 Major Milestone Schedule #2 Potential earlier delivery of Instruments allows earlier start of I&T Bus integration contingencies Currently working day to day scheduling flow with UCB

THEMIS MPDR PM 11/12/ Major Milestone Schedule #3 Probe Carrier contingency is in parallel with Probe schedule contingency Probe #1 has significant slack at end of I&T Unused slack will be utilized for mission simulations (based on resource availability)

THEMIS MPDR PM 11/12/ Critical Path Analysis  Project management philosophy –All items are potential critical path items unless they are managed properly Focus on the current critical path item Focus on delta between ‘slack’ and ‘contingency’ Develop strategies to minimize durations Simultaneously keeping all other items off the critical path with constant schedule vigilance and workarounds Critical path defined as activity flow with < or = zero slack based on interval milestone dates Pink path defined as activity flow with less than ten days of slack

THEMIS MPDR PM 11/12/ Mission Level Critical Path

THEMIS MPDR PM 11/12/ Critical Path Analysis Drill Down  Current critical path at Probe level –Base panel composite structure delivery to RCS vendor This will subsequently drive availability of base panel for IDPU integration –Side panel composite structure delivery to Solar Array vendor Since Solar Array is last item to be installed prior to start of Environmental test program it inherently has slack in current schedule –Overall structure deliveries are driven by thermal cycling & strength testing of each Probe prior to delivery to I&T  Probe Carrier is off the critical path –Built in parallel with Probes 1 – 5 –Has adequate schedule contingency  Flight software is off critical path –Using commercial processor boards and Engineering Development Unit

THEMIS MPDR PM 11/12/ Probe 1 Component Slack Analysis

THEMIS MPDR PM 11/12/ Probe 2 Component Slack Analysis

THEMIS MPDR PM 11/12/ Probe 3 Component Slack Analysis

THEMIS MPDR PM 11/12/ Probe 4 Component Slack Analysis

THEMIS MPDR PM 11/12/ Probe 5 Component Slack Analysis

THEMIS MPDR PM 11/12/ Flight Software Development THEMIS Flight Software BuildPlanned Start Planned Finish Flight Like ETU Required Build 0 Development03-Sept Oct-2003No Build 0 Test Conduct03-May May-2004Yes Build 1 Development09-Dec Apr-2004No Build 1 Test Conduct01-Apr Apr-2004No Build 2 Development02-Apr Sep-2004Yes Build 2 Test Conduct01-Aug Aug-2004Yes Build 3 (Cleanup Build )01-Sep Nov-2004Yes Build 3 Test Conduct29-Nov Dec-2004Yes Commercial Cold-Fire BAU EDU Required by May 03, 2004

THEMIS MPDR PM 11/12/ Flight Software Schedule

THEMIS MPDR PM 11/12/ Example of Open Plan Schedule This page intentionally left blank View graph will be available at the meeting

THEMIS MPDR PM 11/12/ Financial/Monthly Reporting Levels to UCB

THEMIS MPDR PM 11/12/ Financial/Monthly Reporting Levels to UCB Spares

THEMIS MPDR PM 11/12/ Cost Basis of Estimates * Note: Yes indicates that this WBS element has lower level WBS elements, which include NRE, hardware, and RE items. Primary = Represents primary means of pricing. Secondary = Represents secondary means of pricing. Probe and Probe Carrier

THEMIS MPDR PM 11/12/ Cost Basis of Estimates * Note: Yes indicates that this WBS element has lower level WBS elements, which include NRE, hardware, and RE items. Primary = Represents primary means of pricing. Secondary = Represents secondary means of pricing. Probe and Probe Carrier

THEMIS MPDR PM 11/12/ Summary Of Costs Probe & Probe Carrier

THEMIS MPDR PM 11/12/ Cost Swales  General Tracking of Costs –Subsystem Leads responsible for monitoring all labor and material charges Charge numbers are opened at the fifth WBS level –PM and Subsystem Leads review weekly spending via on-line reports Cost data available weekly –Major subcontracts are Firm Fixed Price with $ Milestones consistent with SOW (exception to Hammers) –Contractors working via purchase order or cost-reimbursement, invoice bi- monthly PM sign off required prior to processing  Phase B - Budgets versus actual spending worked at summary level  Phase C/D – Swales internal Performance Measurement System –Budget Cost Work Schedule (BCWS) developed in Open Plan for each major subsystem –Budget Cost Work Performed (BCWP) calculated by statusing of Open Plan –Actual Cost Worked Performed (ACWP) compared to BCWS & BCWP to assess performance –Estimates To Complete (ETC) initiated for WBS elements projected to be > 10% of Budget At Completion (ITD + ETC)

THEMIS MPDR PM 11/12/ Phase B Burn Rate  Labor Hours (as of 10/24/03) –Exceptional labor performance against original plan –Slower start up in staffing in some areas (Electrical Engineering) –On average we are using a more experience staff than we proposed resulting in efficiencies in design –Trend should level off consistent with cost proposal in next several months –Current labor savings will be used to buy down risk in phase C/D

THEMIS MPDR PM 11/12/ Phase B Burn Rate  Subcontract/Material (as of 10/24/03) –Lag between billing and processing ~ 2 weeks Bills being processed ~ $705K First invoices: Tanks, RCS, Ball, Hammers, Jupin –Outstanding commitments ~ $920K –Slower ramp up of major subcontract Hammers Company running true to original plan –Budget included $1.3M for electronics vendor - GDDS not on board yet

THEMIS MPDR PM 11/12/ Current Open Risks  The Stoplight Report ranks all of the Open risks Update planned for December 2003

THEMIS MPDR PM 11/12/ Major Risk Areas  Separation System Design & Test –Number one risk for Probe & Probe Carrier going into / coming out of Phase B was Separation System Move to more classical approach for Separation System (Marman Band) Reducing overall risk Will require more resources in order to achieve performance levels –Engineering Test program will begin in second quarter of 2004  Antenna Design –A result of FAST Antenna not meeting THEMIS requirements embarked on antenna RF pattern study at Ball. Requires more NRE expenditures Recent analysis indicates that the geometry works Antenna currently not on critical path  Single Board Computer –Flight Software issue (paging) with original baseline would have driven schedule and test program. Move to ColdFire allowed for use of Commercial ColdFire board early on in FSW test program. –Cost reserves applied to lower long term risk on the program –Engineering Development Unit planned for second quarter of 2004

THEMIS MPDR PM 11/12/ Major Risk Areas  Long Lead Procurements –Tanks & RCS contracts are on track with substantial savings against original budgets –Thruster sizing increase reduces operational risk and increases burn efficiency  Magnetic & ESD Requirements –Continue to work magnetic & ESD requirements with UCB/UCLA –Final Solar Array pricing will be driven by magnetic cleanliness and ESD compliance  BAU Part Pricing –Continue to work design and EEE parts requirements –Final pricing of BAU will be driven by specific parts implementation  Quality Assurance Requirements Changes –Recent proposed changes to QA requirements particularly in parts area Force re-opening of contract discussions with vendors Cause significant schedule delays. Result in an overall increase in costs to the program

THEMIS MPDR PM 11/12/ Mission PDR Cost & Schedule Review Probe & Probe Carrier Program Management Backup Slides I&T/Launch Site Flows Examples of Detail Schedules

THEMIS MPDR PM 11/12/ Preliminary Generic Probe Bus I&T Flow

THEMIS MPDR PM 11/12/ Preliminary Instrument / Bus I&T Flow

THEMIS MPDR PM 11/12/ Probe and Probe Carrier Environmental Test Flow Mass properties & Spin Balance Modal Signature, Protoflight/Acceptance Sine and Random Vibe 2/1 Separation Test Thermal Vacuum (& Thermal Balance on Probe 1) Post Environmental CPT Ready for PCA Integration Assemble Probe Carrier Probe Mass Mockups Install Harness & Thermal ELV Fit Check (If Required) Modal Survey, Qual Sine Burst (Fixed Base) Qualified Probes and PC Begin Integration Integrate Probes 2 -5 with PCA CPT Acceptance Sine Vibe & Protoflight Acoustic Test (3712 PAF & Band) RF Performance & Self Compatibility test CPT, Mission Sim, Launch Sim Deintegrate Probes & PC, Pack Separately Probes 2-5 I&T Ship to KSC for Launch Preliminary

THEMIS MPDR PM 11/12/ Launch Site Flow