Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

QXF Quench Protection: issues and plans Giorgio Ambrosio Fermilab QXF Video-meeting August 1, 2013 The HiLumi LHC Design Study is included in the High.
QXF Cable, 1 st generation Giorgio Ambrosio, Paolo Ferracin Fermilab CERN QXF Video-meeting June 18, 2013 The HiLumi LHC Design Study is included in the.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
DOE Review of LARP – February 17-18, 2014 QXF Design, Fabrication and Irradiation Study Giorgio Ambrosio 2/17/14 1.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Radiation Resistance G. Ambrosio Fermilab 2nd Joint HiLumi LHC/LARP Annual Meeting November, 2012 Frascati Work supported by the US LHC Accelerator.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
MQXF Preliminary Dose Requirement G. Ambrosio, E. Fornasiere, E. Todesco Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF Design and Conductor Requirements
11 T Dipole Integration & Plans M. Karppinen
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Nb3Sn IR Quadrupole Program
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Presentation transcript:

Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Work supported by the US LHC Accelerator Research Program (LARP) through US Department of Energy contracts DE-AC02-07CH11359, DE-AC02-98CH10886, DE-AC02-05CH11231, and DE-AC02-76SF00515

AGENDA 09/04/2013 G. Ambrosio and P. Ferracin2 StartDurationTitlePresenter 8:301:00QXF plans and scheduleP. Ferracin, G. Ambrosio 9:3030CERN QXF conductor procurement and cable R&DA. Ballarino (by phone) 10:0030Coffee 10:3030LARP conductor procurementA. Ghosh 11:0030LARP QXF cable R&DD. Dietderich 11:3030Winding testsD. Dietderich, S. Izquierdo Bermudez 12:0030Cable Insulation developmentD. Dietderich, P. Ferracin 12:301:00Lunch 13:3030Requirements (electrical, cooling, dose, geometry)P. Ferracin, G. Ambrosio 14:0030Protection systems for Nb3Sn magnets and thresholdR. Denz 14:30302D magnetic analysis and coil cross-sectionF. Borgnolutti 15:00303D magnetic analysis and coil end designS. Izquierdo Bermudez 15:3030Coffee 16:0030Coil fabricationD. Cheng 16:3030Coil toolingM. Yu, J. Schmalzle, P. Ferracin 17:0030QXF support structure and mechanical analysisM. Juchno, H. Felice 17:3030QXF integrationP. Ferracin 18:0030QXF quench protectionG. Ambrosio

SQXF status Cable R&D Target criteria established – Mechanical stability during winding – Stability current I s ≥ 3*I op – RRR after cabling > 150 – No shear planes in micrograph images First iteration completed in 03/2013 – Winding tests, cross-section images, extracted strand meas. No cable reached all targets Second iteration has started – Cabling, winding tests, micrograph images in 04/2013 – Extracted strand measurements in 05/2013 – Cable parameters for first set of coils by end of 05/2013 Cable R&D will continue (PIT strand, improved parameters…) 09/04/2013 G. Ambrosio and P. Ferracin3

SQXF status Insulation R&D First ten-stack measurements in 03/12 – Either too thin (LARP) or too thick (CERN) Thickness optimization in progress Target micron 09/04/2013 G. Ambrosio and P. Ferracin4

SQXF status Coil design and magnetic design First iteration completed 2D magnetic analysis – Coil cross-section and yoke design – Magnetic shimming 3D magnetic analysis (OPERA and Roxie) – Peak field – 3D Field quality 3D CAD model – Coil (turns and blocks) – End spacers (Roxie and BEND) 09/04/2013 G. Ambrosio and P. Ferracin5

SQXF status Coil fabrication tooling First iteration of pole and end-shoes design completed Design of W&C and R&I started in 03/ /04/2013 G. Ambrosio and P. Ferracin6

SQXF status Support structure 2D optimization completed – Update of the structure (alignment assembly features) – Alignment key – Dimensions of the components – LHe vessel mechanical analysis – Effect of coil deformation on field quality 3D analysis started 3D CAD modelling in progress Integration, LHe vessel containment, length – Two options (CERN, BNL) under study 09/04/2013 G. Ambrosio and P. Ferracin7

SQXF plan and schedule Update of coil design in 06/2013 Coil parts fabrication/optimization from 06/2013 – To be completed by end of 2013 Coil tooling – Design completed in 05/2013 – Procurement Parallel coil fabrication LARP-CERN – CERN: 1 Wind&Curing + 1 React&impreg – LARP: 1 Wind&Curing + 2 React&impreg – Winding and curing by 10-11/2013 End parts optimization and test of fabrication process – Reaction and impregnation by 02/2014 Fabrication of full practice coil starts, both at CERN and in the US, in 03/2014 – First long coil wound in 01/15 09/04/2013 G. Ambrosio and P. Ferracin8

SQXF plan and schedule Coil fabrication CERN – Number of coils 1 Cu coil 1 practice + 5 real RRP coils 1 practice + 5 real PIT coils – After SQXF01 – Fabrication steps Winding + curing + reaction + impregnation – Fabrication time ~100 days (5 months) per coil 1 coil produced every 2 months LARP – Number of coils 1 practice 1 mirror + 4 real RRP coils – Fabrication steps FNAL: winding + curing LBNL: reaction + impregnation BNL: reaction + impregnation – Fabrication time ~100 days (5 months) per coil 1 coil produced every month 09/04/2013 G. Ambrosio and P. Ferracin9 Sequence: CERN will start with RRP coils – SQXF1 magnet will include the first available four RRP coils produced by the two “production lines” – With the current plan, either 3 LARP + 1 CERN or 2 LARP + 2 CERN

SQXF plan and schedule Support structure – LARP/CERN design Identical design for SQXF and LQXF – 2 SQXF structures fabricated and qualified at CERN 1 long structure fabricated and assembled by LARP – From conceptual design to assembly and qualification From beginning of 2013 to end of 2014 Tests – First coil test (mirror) in 12/14 Feedback for LQXF coil fabrication (first winding in 01/15) – First magnet test (SQXF1) in 04/15 First assembly of LQXF in 10/15 – Feed-backs from SQXF to LQXF on loading – Then SQXF1b (RRP), SQXF2 (PIT), SQXF2b (PIT) 09/04/2013 G. Ambrosio and P. Ferracin10

SQXF plan and schedule 09/04/2013 G. Ambrosio and P. Ferracin11

LQXF Goals GOALS: – LQXF1/2: Demonstrate main features of MQXF cold masses Aperture, length, main requirements – LQXF3: MQXF prototype DESIGN CRITERIA: – Coils, tooling design, and structure developed with SQXF: Same coil parts, same tooling design, same process, … – Prototype features to be defined by Design Report (2015) 09/04/2013 G. Ambrosio and P. Ferracin12

PLANS LARP effort for demonstrating readiness for construction project (US DOE criteria) Fabrication plan is based on LQ and LHQ plans – Strand procurement: BNL and LBNL – Cabling: LBNL – Cable insulation: NEWT (different from LQ) – Coil W&C: FNAL – Coil R&I: BNL and FNAL – Structure & assembly: LBNL – Test: FNAL and/or BNL 09/04/2013 G. Ambrosio and P. Ferracin13

Schedule 09/04/2013 G. Ambrosio and P. Ferracin | 2014 | 2015 | 2016 | 2017

Schedule Milestones SQXF practice winding: 10/13 SQXF coil fabrication start: 03/14 SQXF mirror test: 12/14 SQXF1 test: 04/15 SQXF1b test: 11/15 LQXF coil fabrication start: 01/15 LQXF1 test: 01/16 LQXF1b test: 07/16 LQXF2 test: 01/17 LQXF2b/3 test: 07/17