The Future ENES Strategy – Toward a Foresight Document Jochem Marotzke Max Planck Institute for Meteorology (MPI-M) German Climate Computing Centre (DKRZ)

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

European EO data & model fusion ( to maximise the value of ESA EO Data ) Alan ONeill National Centre for Earth Observation.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Process and essential steps of Capacity Development.
Bangladesh European Union Capacity Building for Effective Response Management System Through e-Learning Options A SDC supported project Comprehensive Disaster.
PRACE – The European HPC Infrastructure Liz Sim (EPCC) PRACE WP6 Operations – User Services Subtask Leader.
Slide: 1 Welcome to the workshop ESRFUP-WP7 User Single Entry Point.
Kick-off meeting Paris 30th and 31rst of March 2009 Action soutenue par la Région Ile de France Infrastructure for the European Network for Earth System.
High-Performance Computing
Towards a Virtual European Supercomputing Infrastructure Vision & issues Sanzio Bassini
Work Package 04 Sixth Framework Programme Specific Support Action EC-INCO-CT Centre of Multifunctional Materials and New Processes with Environmental.
First Marine Board Forum – 15 May Oostende Marine Data Challenges: from Observation to Information From observation to data.
1 Ideas About the Future of HPC in Europe “The views expressed in this presentation are those of the author and do not necessarily reflect the views of.
Integrated Earth Observations - Building the Bridges - IGOL Theme Team Meeting Sept 2004 Jeff Tschirley Chief, SDRN.
Decentralised and Remote Access to Confidential Data in the ESS (ESSnet DARA) Overview and State of the Art Maurice Brandt Destatis FIRST EUROPEAN DATA.
WP5 Strategy Domenico Giardini SED ETHZ. WP5 Objectives Harmonize national implementation Integrate the European scientific community Establish Centres.
Connect communicate collaborate Campus Best Practices Gunnar Bøe, Section Manager, Campus Networks and Systems, UNINETT Skopje, 15 Sept
The Preparatory Phase Proposal a first draft to be discussed.
Pilot and Proposal for a European Remote Access Network David Schiller (IAB) Data without Boundaries (DwB) - WP4 workshop before NTTS Brussels, 4. March.
The Coalition for Action on ICT enabled change in Europe.
MISSION Sixth Framework Programme Specific Support Action EC-INCO-CT WP05 CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS.
1 The Strategic Research Agenda from 2014 to 2020 BDEC Wednesday, January 28 th,
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Process and essential steps of Capacity Development.
EPOS a long term integration plan of research infrastructures for solid Earth Science in Europe Preparatory Phase Project
CLIMATE-RESILIENT AND ENVIRONMENTALLY SOUND AGRICULTURE OR “CLIMATE-SMART” AGRICULTURE Information package for government authorities Start.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
1 ETP4HPC Background and Future ‘Building a Globally Competitive HPC Technology Industry in Europe’
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1.1: PILLARS.
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part 2.
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
WP8– Governance Models Jurry de la Mar T-Systems – 26 June 2014.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
Europlanet RI A network for all planetary scientists A service to the community Manuel Grande Scientific Dissemination Coordinator EC grant agreement no.
NA2 objectives The „v.E.R.C.“ (virtual Earth System Resource Center) v.E.R.C is: A (technical) infrastructure to improve the utilization of the ESM core-infrastructure,
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
Demonstrators and Pan-European Services Laboratory WP5 session.
ELOGMAR-M Review Meeting, Shenzhen, 31/03/ First Review Meeting - Web-based and Mobile Solutions for Collaborative Work Environment with Logistics.
Chapter 3 Strategic Information Systems Planning.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
RI The DEISA Sustainability Model Wolfgang Gentzsch DEISA-2 and OGF rzg.mpg.de.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Common Implementation Strategy for the Water Framework Directive Planning of a Workshop CLIMATE CHANGE IMPACTS ON THE WATER CYCLE, RESOURCES AND QUALITY.
Part-financed by the European Union WS 2 Work Plan Joint Technical Secretariat Lead Applicant Seminar, Hamburg, 2-4 April 2008.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
Applied Sciences Perspective Lawrence Friedl, Program Director NASA Earth Science Applied Sciences Program LANCE User Working Group Meeting  September.
NeSC Training Team Enabling, facilitating and delivering quality training in the UK and Internationally.
WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris Partners and general objectives CERFACS.
The GEOSS Science & Technology Stakeholder Network – Workshop Goals Michael Nyenhuis Hans-Peter Plag.
The Modeling Circle Courtesy M. Lautenschlager, DKRZ.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
WP9– Evaluation, roadmap & development plan Rupert Lueck EMBL – 26 June
The ESA call for the 9 th Earth Explorer mission (EE9)
3 rd WG F meeting: CRUE ERA-Net update Andreas Pichler CRUE ERA-Net dissemination officer.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
TOWARD CONVERGENCE DA-07-P6: Data Integration and Analysis System It is expected that there will be a large increase in the volume of Earth Observation.
CaSToRC Linking Scientific Computing in Europe and the Eastern Mediterranean LinkSCEEM-2 CyI IUCC CYNET SESAME JUNET JSC BA NARSS MPIC ESRF NCSA.
WP9– Evaluation, roadmap & development plan This document produced by Members of the Helix Nebula consortium is licensed under a Creative Commons Attribution.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Inter-operability with e-Infrastructures Sergio Andreozzi - WP6 Task Leader Strategy and Policy Manager, EGI.eu Helix Nebula - 1st Year Review 1.
OUR FOCUS FOR 2011 TO 2012 The CfWI produces quality intelligence to inform better workforce planning, that improves people’s lives.
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
J. Marotzke, R. Budich, A. Navarra, P. Kabat, B. Lawrence
Coordinator: DKRZ Weather Climate HPC
CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS
League of Advanced European Neutron Sources
Presentation transcript:

The Future ENES Strategy – Toward a Foresight Document Jochem Marotzke Max Planck Institute for Meteorology (MPI-M) German Climate Computing Centre (DKRZ) KlimaCampus Hamburg

WP2/NA1: The future ENES strategy Task 1: Define the European strategy in climate and Earth system modelling Task 2: Prepare the ENES strategy with regards to the HPC-ecosystem Task 3: ESM Education - Developing a strategy Task 4: Dissemination Focus on Tasks 1 and 2 here

NA1 Task 1: European strategy in climate and Earth system modelling What does Europe need in terms of climate and Earth system modelling and prediction? How is Europe going to face the increasing demand for information on societal impacts? What will be the status of European climate and Earth system models 10 year from now? What kind of infrastructures are required ?

NA1 Task 1: European strategy in climate and Earth system modelling NA1 task 1 will deliver the Foresight position paper on “The ENES strategy and its Implementation” (Deliverable D 2.4, month 36)

NA1 Task 1: European strategy in climate and Earth system modelling Start with large workshop to brainstorm & define the key questions to be addressed by dedicated working groups. (Milestone 2.1, month 6) Working groups to elaborate elements of strategy End of the task (month 34, with 2 nd IS-ENES General Assembly): Large workshop to discuss and synthesise conclusions from working groups Establish the Foresight position paper on “The ENES strategy and its Implementation” 40 k€ available to invite about 20 to 25 non IS-ENES partner scientists to prepare the ENES future strategy

NA1 Task 2: Strategy for ENES & HPC Ecosystem Prepare the ENES community for PRACE and DEISA2 Define the needs of the climate community Define climate benchmarks Organise the interface between PRACE and the climate scientific community Update the scientific case in the field of climate science When facilities are available, organise the most advanced and adapted experiments to benefit from such facilities. M2.2 (Task 2, mo 6): First list of requirements for PRACE

NA1 Task 2: Strategy for ENES & HPC Ecosystem Prepare for future HPC architectures Establish the European strategy to develop the next generation of climate and Earth system models Elaborate the ENES strategy with regards to the HPC-ecosystem M2.4 (Task 2, mo 30) Elements for the ENES strategy on the HPC-ecosystem to feed back into Task 1

How to get to the Foresight document? We have committed to the content and the delivery date (month 36) Foresight must have elements of Climate and Earth system science Communication with users of this science Infrastructure: HPC and other technical Infrastructure: Workforce Other? We need a relatively small core writing team. Volunteers?