TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.

Slides:



Advertisements
Similar presentations
2013 Business Plan Capital Plan. Transportation Infrastructure 2013 Capital Project Budget of $1,875,000 Key Projects: – Traffic/pedestrian safety improvements.
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
Mechanicsburg Borough Town Hall Meeting October 15, 2014 STORM WATER AND STREET INFRASTRUCTURE.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
MARCH 20, 2013MARCH 20, HIGHLIGHTS OF 2013 CAPITAL BUDGET Roads, Sewers, Transportation, Parks and Recreation, Other.
MARCH 2015MARCH HIGHLIGHTS OF 2015 CAPITAL BUDGET Roads, Sewers, Transportation, Parks, Miscellaneous, Special Projects.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Florida Engineering Society 1. 2 Penny Projects Now working - Transportation Improvements –Bayside Bridge –Bryan Dairy Road –McMullen Booth Road –East.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Points of Interest Presented to Mission Beach Community Association by Councillor Jennifer Downs. 9 th August, 2011.
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
FY2016 Proposed Budget March 17, Fiscal Year 2016 Proposed General Fund Budget $133.4 million No Tax Rate Increase Proposed Current Rate:
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
Tracy Hatch Chief Financial Officer. Rochester Maintenance Facility & District HQ $16.1M request for Trunk Highway bonds Phase 2 will remodel 94,000 SF.
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
2009 Budget City of Melfort An Overview of the 2009 Budget.
Trail Funding Sources & General Information
MARCH 19, 2014MARCH 19, HIGHLIGHTS OF 2014 CAPITAL BUDGET Roads, Sewers, Transportation, Parks and Recreation, Other.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
What does PWD do for our City?. Administrative Services Engineering Operations.
21 st Sep Election Process July & August
Draft Annual Business Plan City of Port Lincoln Prepared by Katrina Allen – Manager Corporate Services May 2007.
John Angiulli Director PUBLIC WORKS DEPARTMENT Citizen Academy September 8 & 15, 2015.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
San Francisco Fire Department Facilities Update.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
SERVICE VISION LEADERSHIP 2015 BUDGET PRESENTATION November 20, 2014.
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
REVENUE OVERVIEW FY2016 PROPOSED BUDGET July 28,
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Sewerage & Water Board of New Orleans
Stormwater Management
Capital Maintenance Improvement Program
Public Works/Municipal Utilities Department
Environmental Services
CITY OF NORFOLK, NEBRASKA
Budget Study Session – May 22, 2012
Deferred Maintenance Deferred Maintenance
Sheldon (Maple to Library) Preferred Design Meeting
Fiscal Year 2017 Final Budget Workshop
MUNICIPAL BUDGETED PROPERTY TAX COMPARISON The following is a yearly property tax comparison from FY to FY :
Capital Improvement Program
City Services overview – Intro to Slow Dialogue session
Dana Heiberg, Senior Planner February 5, 2018
Capital Budget Presentation
Town of Broadway Fiscal Year 2020 Budget May 7, 2019.
Director of Water Engineering
November Bond Election
2019 Construction Season Preview
Presentation transcript:

TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M

Major Projects Blakey’s Crossing completion (State Funding) TECC $5m upgrade (Federal Funding) $7m inner city water & sewer upgrades $6M Magnetic Island Waste Transfer Station $3.14 onshore works for Townsville Recreational Boat Park

Roads $35M for reconstruction, reseals & overlays of 129 streets $4.9M kerb & channel replacement $1.6M road safety measures

Maintenance $53.32M – Road & Transport Maintenance – potholes, footpaths, traffic signals, bridge repairs, etc. $42.3M – Parks & Open Space $10.3M Drain & Stormwater Management $815K – Coastal Facilities

Drainage $7M reconstruction of Howitt St stormwater $350K storage area Garbutt $350K table drains Rossmead Estate $150K refurbishing flood pump stations $120K replacing drainage pit grids/grates etc.

WATER $6.5M reservoir – Mt Louisa $3M Mt Kilburn booster pump – Northern Beaches $4M rehab of water pipes $880K refurbishment of reservoirs

Waste Water $5.3M southern Suburbs Pump Station & pressure main $1.5M upgrade to Cleveland Bay STP $5M Construction & rehab of sewers $3M STP renewals $2M pump station upgrades & renewals