Status of ILC detector/physics activity Sakue Yamada Apr. 24, 2012 2012/4/241Sakue

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
M.Sc Projects David Wilson M.Sc Projects Coordinator for Computing & Information Systems.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Finishing Talk 2013 Mairi McAra Education Adviser General Teaching Council for Scotland
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
ECE791 Senior Design Experience Project Requirements and Timeline.
Ian F. C. Smith Writing a Journal Paper. 2 Disclaimer / Preamble This is mostly opinion. Suggestions are incomplete. There are other strategies. A good.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
Preparing a Written Report Prepared by: R Bortolussi MD FRCPC and Noni MacDonald MD FRCPC.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
ILC communication InterAction Collaboration 14 July 2011 Leah Hesla ILC communication at InterAction Collaboration meeting.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Abstract  An abstract is a concise summary of a larger project (a thesis, research report, performance, service project, etc.) that concisely describes.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Final CALICE OsC meeting: Status and summary of project
Working in Groups in Canvas
Introductory Remarks and Meeting Goals
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
Technical Design Report preparation
The DBD: Outline and Scope
Update of the Detector Program for ILC Sakue Yamada March
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Presentation transcript:

Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue

Topics Where we are Preparation for DBD IDAG monitoring of DBD Post-DBD activity 2012/4/242Sakue

Oct. 2007: Call for LOIs was made by ILCSC Jan. 2008: Detector management was formed Mar.2008: IDAG formed, 3 LOI groups known Mar.2009: 3 LOIs submitted Summer 09: IDAG recommendation for validation and ILCSC’s approval Oct 2009: Work plan of the validated groups Mar:2009: IDAG began monitoring the progress End 2010: Interim report completed DBD outline to be monitored End 2012: Detailed Baseline Design Report KILC12 RDR 2012/4/243Sakue The time line of the LOI process

Interim Report completed 2012/4/24Sakue Printing is still going. It is available on-line from the ILC web page.

Interim Report gave us good lessons. Many people contributed. Editing required big effort, which we depended on the communicators. Some items took time: high quality figures, checking of author list, the funding agencies to acknowledge, report numbers of supporting labs, etc. 2012/4/24Sakue

Our 5 years efforts will be summarized in the Detailed Base Design Report. Together with GDE’s TDR, DBD will be a part of the project proposal document when a consensus is reached that ILC is the LC to be built. The target date for completion is end of this year. 2012/4/24Sakue Preparation for DBD

DBD will have 2 volumes 2012/4/24Sakue Physics volume (80 pages) describes physics case for ILC Detector and simulation volume (350 pages) describes the feasibility of the detectors for solving the aimed physics questions. It has introductory chapter (50 pages) and detector chapters (150 pages for each).

Organization to make DBD Physics volume: a group of physicists convened by Michael Peskin. (The base is the Physics CTG but invites wider contribution. The group started early last year.) The group is studying the LHC results and waits for new ones with better statistics. ( Cf. Michael‘s talk) Detector and Simulation Volume: The two detector groups write their detector chapters. The introductory chapter will be written by the management and the common task groups. 2012/4/24Sakue

General guidelines for the detector volume The detector chapters can be regarded as the advanced update of the LOI contents. Each group will write its detector concept, design, R&D of the components, simulation for benchmarks, cost estimation, and so on. The chapters need to be convincing for addressing the physics aims, and also attractive. The groups are free about where to put emphasis. The common items for the both detectors will be described in the introduction (to avoid duplication.) 2012/4/24Sakue

DBD Format WG This group coordinates the format and contents among the introduction and detector chapters. Members: (ILD) T. Behnke, Y. Sugimoto (SiD) P. Burrows, M. Stanitzki (Management) J. Brau, J. Fuster, H. Yamamoto, S. Yamada This group agreed to work also as the editing team. The minutes of this WG can be accessed through our web page. (They must have been circulated in each group as well.) 2012/4/24Sakue

Some of the discussions of the Format WG Due dates of the mile stones First draft: Sept. 21 (editing needs to be finished) Final draft: Dec. 21 LaTex is to be used for drafting. We are going to use the same template as TDR. Coordination with TDR will be made through P. Burrows. We collect the signatories again without copying from LOI. Where to place the author list is not decided yet. (E.g. RDR had all the authors together repeated in each volume.) 2012/4/24Sakue

What will be covered in the introduction (organized by J. Fuster) Physics reach (This is a very brief summary of the physics volume). General requirements on detector performance at ILC Interfacing matters with the accelerator The necessity of two detectors and push-pull scheme Description of the physics/detector activity in this LOI period; mile stones, organization, IDAG,…. Each common task group describes common items. E.g. Det. R&D, engineering tools, physics benchmarks and common simulation tools,…. (The details will be posted as well.) 2012/4/24Sakue

Further milestones toward the completion IDAG will monitor the contents: IDAG validated the LOIs of the groups and monitored the progress since then. Albuquerque (Sep,2009) Beijing (Mar.2010), Geneva (Oct.2010), Eugene (Mar.2011), Granada (Sept.2011) IDAG is familiar with the details from the very beginning. 2012/4/24Sakue

IDAG monitoring in Daegu The outlines of the introductory chapter and the two detector chapters are in the hands of IDAG, and will be discussed. There will be interviews by IDAG of the two groups (SiD/ILD) (Tuesday), of Physics CTG convener(s) (Tuesday), and of the software CTG members (Wednesday). We expect comments on the material for improvement. Drafting should be completed in 5 months from now. The drafts after the first round edit is to be given to IDAG by end September. 2012/4/24Sakue

Monitoring of the drafts by IDAG During the LCWS in Arlington, Texas, in October. IDAG gives comments on the first draft. After this monitoring, there are about 2 months to complete DBD. PAC will meet on December 15/16 at KEK. We wish to submit almost final version of DBD to PAC by end November. (PAC may also give us comments from its point of view.) 2012/4/24Sakue

Executive Summary of TDR & DBD There will be an executive summary of all volumes of TDR and DBD. We are going to participate in drafting this. The authors, who need to be familiar with the DBD contents, will be assigned. 2012/4/24Sakue

After completion of DBD We submit DBD to ILCSC in early 2013 to be our final report. There may be some polishing for publication. GDE is planning a launching event of TDR/DBD in Summer We will certainly participate in the event. Details are to be worked out. The event may be organized in each region, nearly simultaneously or in series. 2012/4/24Sakue

2012/4/24Sakue We are going to concentrate our efforts on DBD now so that, together with TDR, it make a good proposal for ILC, hoping new physics by LHC push ILC forward.

Summary of key dates for DBD By End September: Full drafts to be given to IDAG IDAG comments during LCWS12, in Arlington. By End November: Polished draft (semi-final) given to PAC PAC comments in mid December. December 21: the final DBD completed 2012/4/24Sakue

Consideration about the post-DBD period Various moves regarding post 2012 activity. Studies of LC physics based on the coming LHC result Consideration by ILCSC of the new LC- promoting organization after 2012 Our own plan regarding detector R&D, design and simulation 2012/4/24Sakue

Post DBD – (LC Physics study) Studies of LC physics for various cases will be important. Various studies are organized. It is linked with the choice of the energy. We look very much forward to news from LHC and its through investigation by the physics group for DBD. It may be too early to conclude during this WS. But we can exchange views on possible cases in order to enrich our understanding. 2012/4/24Sakue

Post DBD- (LC Physics Study) We should recollect that already 20 years ago, when there was less clue for new physics, people thought about building an e+e- Linear Collider. With more solid knowledge for new physics, we are now in a better position to form a realistic strategy. 2012/4/24Sakue

Post DBD- (Post 2012 scheme) 2012/4/24Sakue ILCSC is discussing the new organization for the post 2012 LC promotion. This was shown in Granada by the chair, J. Bagger.

The physics/detector box contains both ILC and CLIC. How to organize this is a question to be solved. Some preparatory meetings started among the detector/physics community or between CLIC and ILC people but proceeding slowly. There are many aspects to be considered. There is no clear platform to study such issues. Nevertheless, we need to think and find a good solution. It may take some time. 2012/4/24Sakue Post DBD- (Post 2012 scheme)

Post DBD – (Our own plan) It is important for us to plan ourselves what and how we want to continue after DBD. Are the concept groups to continue ? What can be our goal for the post DBD period? 2012/4/24Sakue

When ILC is chosen clearly for the next LC, these questions can relatively easily be answered. e.g. We want to work hard for its realization, finish remaining R&D and proceed for engineering design toward construction. The concepts will continue these efforts. (I hope more mixture among regions occur.) Our life may not be easy but we will have a clear goal and plan to accomplish it. 2012/4/24Sakue Post DBD – (Our own plan)

If it takes time to decide which LC to choose, we may go on with R&D and physics studies. It will be harder to set a clear objective. In this case also the concept may remain. But effort will be less focused. This can result in a danger that young people leave the LC community. 2012/4/24Sakue

Post DBD – (Our own plan) The physics study based on the LHC result will be very important to choose our way. We wish to be lucky that LHC brings a clear information for ILC about SM Higgs, either confirmation or rejection, or about something NEW. 2012/4/24Sakue