Todd Moore for the DES CollaborationNov 28, 20061 Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Intro to Digital Logic. What does Digital mean? A method of storing, processing and transmitting information through the use of distinct electronic or.
NetSure™ RDB Series.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Grounded Grid Tube Gain Stage Basic layout Great for current output DACs like Monica DIY Paradise July 2006.
Director’s Review July 25-27, 2006 T. Shaw1 DES Review DES Front End Electronics WBS 1.3 T. Shaw.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
1 Comparison of MIRAC-4 array with Cornell test array, both warm ver 3 Bill Hoffmann November 10, 2009 Test configuration Array: MIRAC-4 array or Cornell.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
Data Logger for Water Meter Function Continuously counts pulses from pulse output of the water meter (or other meters with pulse output) and periodically.
Embedded Programming and Robotics
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Load.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
Todd Moore for the DES CollaborationPS TalkJune 13 th, DES DHE CRATE SYSTEM MANAGEMENT & CONTROL Todd Moore University of Illinois, at Urbana-Champaign.
Todd Moore for the DES CollaborationPSTalkJune 13 th, DES MONSOON LINEAR POWER SUPPLY SELECTION Todd Moore University of Illinois, at Urbana-Champaign.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
ZTF Interconnecting Scheme Stephen Kaye
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
ANALOG STUDIO SETUP Basic Overview of Recording Studio I/O.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Clock Board Test and Preliminary Acceptance Criteria Ciemat (Madrid), April 2009 Juan de Vicente, Javier Castilla, Gustavo Martínez.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
TS 1.1 Basic Digital Troubleshooting 1 ©Paul Godin Updated August 2013 gmail.com.
Todd Moore for the DES CollaborationApril 3 rd, Quick Summary of Noise Test Results. Noise test hardware & software setup. Earth grounding/shielding.
First, let’s review the structure and use of a breadboard.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Grounding Guidelines Developed for LBNE
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
New product introduction:
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Data Acquisition Device (DAQ) A DAQ is a cool little device that allows you to interface hardware to a computer. Here is what we will do:  Create a square.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Exit REMOTE POWER SYSTEM ”Turning your copper into gold”
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
ZTF Grounding or Yes, there are two paths you can go by
Setup for automated measurements (parametrization) of ASD2 chip
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
Calorimeter Mu2e Development electronics Front-end Review
Meeting on Services and Power Supplies
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
Pierluigi Paolucci - I.N.F.N. Naples
University of Illinois, at Urbana-Champaign
SIDECAR ASIC Characterization Dan Pontillo
Overview of T1 detector T1 is composed by 2 arms
NI Data Acquisition (DAQ) Wiring and Connections
BESIII EMC electronics
PLC Hardware Components.
Interrupts.
Presentation transcript:

Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram of earth & signal grounds. UofI Monsoon test stand wiring scheme. Test results with linear supplies. Test results with Vicor supplies. Conclusion… Vicor Noise Test Results Ver. 7.0

Todd Moore for the DES CollaborationNov 28, Noise Test Hardware Setup All test are run with either Linear supplies or Vicor supplies attached to original Monsoon 6-slot DHE. Remote sensing was removed & local sensing added. Noise measurements are taken with video inputs: shorted, floating, & connected to ccd emulator thru video cable supplied by Fermilab. The Vicor +3.3vdc voltage is running without uRAM.

Todd Moore for the DES CollaborationNov 28, Noise Test Software Setup All exposures are long.Monsoon is running Fermilab focalplane on cyclone:/home/monsoon/cfg/_fnal/. Sequencer for 6-slot readout is ReadType1d.ucd. All exposures are long. # of pixels for long exposure is 4146 ( ) rows X 2248 ( ) columns. Readout time is at 11uS/pixel. All Offsets are set to 1.0v. Channel 0 & 2 video inputs are used for readout. All datasets are located on cyclone.hep.uiuc.edu:/home/monsoon/data/vicor_noisetest/…. Data is analyzed for a long run using./noiselast_wrows.sh. Data is analyzed visually using DS9 or FV4.2.

Todd Moore for the DES CollaborationNov 28, NOTES: CCD TEST RACK CONNECTS TO EARTH GROUND THRU POWER STRIP GOING TO OUTLET & PROVIDES ONE POINT FOR EARTH GROUND REFERENCE. ON LINEAR SUPPLIES, ALL ANALOG & DIGITAL RETURNS ARE TIED TOGETHER AT THE SUPPLY & AT THE MONSOON BACKPLANE. ON VICOR SUPPLIES, ANALOG RETURNS ARE TIED TOGETHER AT THE SUPPLY; DIGITAL RETURNS ARE TIED TOGHETHER AT THE SUPPLY, AND BOTH ANALOG & DIGIAL RETURNS ARE TIED TOGETHER AT THE MONSOON BACKPLANE. THE ANALOG & DIGITAL RETURNS ARE CONNECTED FROM THE MONSOON BACKPLANE TO THE TEST RACK TO TIE EARTH GROUNDS AND SIGNAL GROUNDS TOGETHER. THE +/-15VA, +/-5VA, +5VD, & +3.3VD LINEAR SUPPLY CASE EARTH GROUND, WHILE VOLTAGE OUPUTS ARE ISOLATED. THE -28VA SUPPLY CASE & VOLTAGE OUTPUTS ARE ISOLATED. ISOLATED EARTH GROUND BANANNA PLUG FROM SUPPLY IS CONNECTED TO TEST RACK TO TIE -28V SUPPLY EARTH GROUND INTO SYSTEM. VICOR POWER SUPPLY CASE EARTH GROUND WHILE VOLTAGE OUTPUTS ARE ISOLATED. GROUNDING STRAP CONNECTS VICOR CASE TO RACK TO BRING SIGNAL & EARTH GROUNDS TOGETHER. UofI Earth Grounding Scheme

Todd Moore for the DES CollaborationNov 28, Block Diagram Of Grounding Scheme NOTES: RACK IS THE SINGLE POINT FOR EARTH GNDS 1. Rack is single point for all Earth Grounds, all AC Power (+ Egnd) comes from single power strip mounted on rack. 2. Vicor Case, which is fed Egnd from A/C plug, is attached to Rack with grounding strap. 3. Linear Case is mounted to Rack & thus Earth Ground. 4. Monsoon Case & backplane gnds are attached to rack, which Egnd. Linear Supply -28VA Fan Panels Vicor supply Earth GND) Monsoon Monsoon Backplane Metal Rack AGND & DGND Planes Digital & Analog Voltage Returns EGND UofI CCD Test Stand Grounding Scheme Linear Supply: +/-15VA, +/-5VA, +5VD, & +3.3VD Note 1: Note 3: Note 4: Note 2:

Todd Moore for the DES CollaborationNov 28, UofI Monsoon Test Stand Wiring Scheme

Todd Moore for the DES CollaborationNov 28, Linear Supply Test Results Channel 0Channel 2 Test DateConditionsMeanRMSMeanRMSNotes/Results FITSPS Test 3 7-Nov-06 Linear supplies are attached to the original Monsoon DHE and unloaded. -28van & +48van are not connected. Video input is shorted at trans board. Egnd and backplane gnds are NOT connected together at the backplane. 80, , Get a baseline measurement with original test stand attached to linear supply. Earth grounds haven’t been connected to signal grounds. This is the same test setup as in previous versions. Osc. Occurred every 80 counts or every 880us, 1.13kHz nTestNov7_ tst3.fits nTestNov7_ tst3.ps Test 4 7-Nov-06 Same as test3, above, except Egnd & return gnds are connected together at the backplane. 80, , Connecting Egnds to signal backplane didn’t increase the sigma. Osc. Occurred every 80 counts or every 880us, 1.13kHz nTestNov7_ tst4.fits nTestNov7_ tst4.ps Test 5 7-Nov-06 Same as test4, above, except - 28van IS connected. +48van is not connected. 80, , Connecting -28van, w/ Egnd attached, didn’t increase the sigma. Osc. Decreased but is still present. nTestNov7_ tst5.fits nTestNov7_ tst5.ps Test 6 7-Nov-06 Fermilab video cable (w/ ccd emulator), and Bias is attached to ccd acq. Trans. Board. Clk is attached to the cbb trans board. The shield on the video cable is NOT conneted to Egnd. -28van IS connected. +48van is NOT connected. 80, , Connecting video cable w/ ccd emulator caused sigma to raise. nTestNov7_ tst6.fits nTestNov7_ tst6.ps Test 7 7-Nov-06 Same as test7, above, except video cable shield IS connected to Egnd.80, , Connecting video cable shield to Egnd didn’t caused sigma to raise. But there is a double peak in the noise curve. nTestNov7_ tst7.fits nTestNov7_ tst7.ps

Todd Moore for the DES CollaborationNov 28, Linear Supply Plot Results Test 3, Nov 7, 2006

Todd Moore for the DES CollaborationNov 28, Test 4, Nov 7, 2006 Linear Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Test 5, Nov 7, 2006 Linear Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Test 6, Nov 7, 2006 Linear Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Test 7, Nov 7, 2006 Linear Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Vicor Supply Test Results Channel 0Channel 2 Test DateConditionsMeanRMSMeanRMSNotes/Results FITSPS Test Nov- 06 Vicor supplies are attached to the original Monsoon DHE and unloaded. Egnds & return gnds are connected together at the backplane. Fermilab video cable (w/ ccd emulator), and Bias is attached to ccd acq. Trans. Board. Clk is attached to the cbb trans board. The shield on the video cable IS conneted to Egnd. -28van IS connected. +48van is NOT connected. 80, , Get a baseline measurement with original test stand attached to Vicor supply, including - 28van. All Egnds are tied to rack. Egnds have been connected to signal backplane. nTestNov21 _tst13.fits nTestNov21 _tst13.ps Test Nov- 06 Same as test13, above, except -28van is NOT connected. +48van is not connected 80, , No change in sigma when -28van is removed. nTestNov21 _tst14.fits nTestNov21 _tst14.ps Test Nov- 06 Same as test13, above, except video inputs are floating (vid connector removed from ccd acq trans). Clk & Bias are still attached. -28van still attached. 80, , Take measurement with video inputs floating. Removing video cable from video inputs caused sigma to drop by half. nTestNov21 _tst15.fits nTestNov21 _tst15.ps

Todd Moore for the DES CollaborationNov 28, Test 13, Nov 21, 2006 Vicor Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Test 14, Nov 21, 2006 Vicor Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Test 15, Nov 21, 2006 Vicor Supply Plot Results

Todd Moore for the DES CollaborationNov 28, Conclusion… Baseline measurements for linear & Vicor supplies are in-line with previous measurements. IE. Monsoon system is functioning normally. Adding FNAL video cable + ccd emulator caused the sigma to go up to ~25 counts RMS for both linear & Vicor supply. IE. No real difference between linear or VIcor supplies attached to Monsoon system. I don’t see the same large numbers of sigma as seen at FNAL. Ground scheme may be different than FNAL…May need to re-run some tests with different grounding scheme.