Tony Doyle - University of GlasgowOutline EDG LCG GSC UK Core Grid GridPP2 EGEE Where do we go from here? Operations.

Slides:



Advertisements
Similar presentations
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Advertisements

John Gordon eScience Centre UK Deployment of LCG1 John Gordon CCLRC Escience Centre GridPP7, Oxford, July 2003.
John Gordon CCLRC eScience centre Grid Support and Operations John Gordon CCLRC GridPP9 - Edinburgh.
Stephen Burke - WP8 Status - 14/2/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
18 April 2002 e-Science Architectural Roadmap Open Meeting 1 Support for the UK e-Science Roadmap David Boyd UK Grid Support Centre CLRC e-Science Centre.
02/07/03 Grid Support Centre 1 UK Grid Support Centre Alistair Mills CLRC e-Science Centre
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
John Gordon and LCG and Grid Operations John Gordon CCLRC e-Science Centre, UK LCG Grid Operations.
1 Deployment of an LCG Infrastructure in Australia How-To Setup the LCG Grid Middleware – A beginner's perspective Marco La Rosa
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Tony Doyle GridPP – From Prototype To Production, GridPP10 Meeting, CERN, 2 June 2004.
Dave Kant Grid Monitoring and Accounting Dave Kant CCLRC e-Science Centre, UK HEPiX at Brookhaven 18 th – 22 nd Oct 2004.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
The National Grid Service Guy Warner.
Neil Geddes GridPP-10, June 2004 UK e-Science Grid Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
Steve Traylen Particle Physics Department EDG and LCG Status 9 th December 2003
Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
Stephen Pickles Technical Director, Grid Operations Support Centre University of Manchester Neil Geddes CCLRC Head of e-Science Director of the UK Grid.
John Gordon CCLRC e-Science Centre LCG Deployment in the UK John Gordon GridPP10.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Δ Storage Middleware GridPP10 What’s new since GridPP9? CERN, June 2004.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
The National Grid Service Mike Mineter
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Tier1A Status Andrew Sansum 30 January Overview Systems Staff Projects.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
Your university or experiment logo here The European Landscape John Gordon GridPP24 RHUL 15 th April 2010.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
The National Grid Service Mike Mineter.
The National Grid Service Mike Mineter
Welcome Grids and Applied Language Theory Dave Berry Research Manager 16 th October 2003.
Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
Stephen Burke – Sysman meeting - 22/4/2002 Partner Logo The Testbed – A User View Stephen Burke, PPARC/RAL.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
GridPP2 Data Management work area J Jensen / RAL GridPP2 Data Management Work Area – Part 2 Mass storage & local storage mgmt J Jensen
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
UK Grid Operations Support Centre All slides stolen by P.Clarke from a talk given by: Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations.
II EGEE conference Den Haag November, ROC-CIC status in Italy
The UK National Grid Service Andrew Richards – CCLRC, RAL.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
Regional Operations Centres Core infrastructure Centres
Gavin McCance University of Glasgow GridPP2 Workshop, UCL
Ian Bird GDB Meeting CERN 9 September 2003
UK Grid: Moving from Research to Production
UK GridPP Tier-1/A Centre at CLRC
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
The CCIN2P3 and its role in EGEE/LCG
The National Grid Service
Collaboration Board Meeting
Presentation transcript:

Tony Doyle - University of GlasgowOutline EDG LCG GSC UK Core Grid GridPP2 EGEE Where do we go from here? Operations

Tony Doyle - University of GlasgowEDG TB2 in development for some time. Application Testbed migrated to TB2.0 starting two weeks ago. Good representation by UK (5/12 in R-GMA) –RAL, RAL-PPD, IC, UCL up and running –Birmingham, Bristol, Cambridge, Lancaster, Manchester, and QMUL have all started installing. RLS at RAL for lhcb, biome, eo, wpsix, tutor and babar GOUT at IC and RB using it. The Information Catalog is at RAL also and people should look at for a browse around the testbed with R-GMA directly. gppui.gridpp.rl.ac.uk is a UI with CSF accounts. The top edgpro MDS is also at RAL to allow direct performance tests with R-GMA

Tony Doyle - University of Glasgow What’s Next? EDG2.0 can form the base of the GridPP grid for some time. Roll it out to BaBar and others Build its middleware into your projects Use it

Tony Doyle - University of GlasgowLCG1 10/13 sites running now including RAL –Mainly Tier1s, a few Tier2s LCG1_0_0 was an early cut of EDG2.0 –Doesn’t use R-GMA or SE –Now LCG1_0_1 –LCFGng or LCFG-lite –Centrally-generated configuration but there have been problems Pressure to commit resources to LCG –Experiments want to see resources before they commit to use –GridPP strategy is to be guided by EB Now for Tier2s –Supported by relevant Tier1 –Volunteers?

Tony Doyle - University of Glasgow UK Tier2s in LCG1 LCG doesn’t understand virtual Tier2, so all UK sites can join –but to prepare for DC, not just for the experience Still a place for EDG app-tb so we should spread across both grids Since RAL will support UK Tier2s, we will schedule Good to have one per Regional Tier2 Resources not important but effort is Volunteers from IC, Manchester, Cambridge, (ScotGrid later)

Tony Doyle - University of Glasgow What’s Next? Add UK Tier2s Build up resources with demand LCG1 has not yet formed a team –US relationship will be the difficult one –Federated Grids?

Tony Doyle - University of Glasgow Grid Support Centre 14 named staff at Rutherford, Daresbury, Manchester and Edinburgh. Operates the UK e-Science Certification Authority. – Provides a helpdesk for ‘first point of call’ queries. Website for advertising services provided. – Provides technical training and evaluations of middleware. Supports the Level-2 Grid project. –National Information Server for Core programme. –Publishing of site monitoring information in xml. Core support for the OGSA-DAI project.

Tony Doyle - University of Glasgow European Grid Support Centre Collaboration between CCLRC, CERN and KTH Sweden each providing 1 FTE Point of trusted reliability between major projects and middleware producers. Directly communicates with staff from Globus Alliance to ensure European issues faced having assisted with release. Website up and running though currently a skeleton of the final content. Attended EDG meeting in Barcelona to publicise and GGF-8 to guide User Services R.G. work.

Tony Doyle - University of Glasgow Globus 2 Training Course Designed for connection to the UK e-Science grid. Intended for system administrators of new sites who wish to add resources to the L2G. Describes how to configure Globus, GSI-SSH and ‘GITS’ to the currently accepted defaults. Being run in October at NeSC to 10 people. –Full –Can be run again if enough interest is shown.

Tony Doyle - University of Glasgow Future work for the GSC Retire UKHEP CA (UKHEP) –No new certificates unless VERY good reason. –CRLs weekly until September Support for GT-3/OGSA middleware. Enhancement of L2G into a production system. Replace current back-end CA technology. Support for EGEE How can GridPP make better use of GSC?

Tony Doyle - University of Glasgow UK L2G Core programme ‘Level 2 Grid’ –Globus, MDS, GITS, VOM –Not just Linux! JISC core grid –Cpu clusters at Oxford and Leeds –Data clusters at Manchester and RAL L3G = production service GT3 testbeds

Tony Doyle - University of Glasgow Welsh e-Science Centre Canolfan e-Wyddoniaeth Cymru Cambridge Newcastle Edinburgh Oxford Glasgow Manchester Cardiff Southampton London Belfast DL RAL Hinxton Oxford e-Science Centre Southampton Regional e-Science Centre

Tony Doyle - University of Glasgow One Grid? Probably optimistic to expect a single UK grid that is completely seamless –but we should try Self-defeating not to at least share a common middleware base and to interwork. Several initiatives to achieve an overlap –Heterogeneity is the current showstopper –GT3 shouldn’t be

Tony Doyle - University of GlasgowGridPP2 To move from testbed to production, GridPP plans a bigger team with a full-time Operations Manager. Resources will come from a share of a large amount of resources made available by Tier2 Centres who will also contribute to the team. The team will run a UK Grid which will belong to various grids (EDG, LCG,..) and also support other experiments

Tony Doyle - University of GlasgowEGEE 32M€ FP6 project –Another flagship EU Grid project –70 partners! In 10 Regions UK/Ireland –CCLRC, NeSC, TCD, UCL –Operations, Middleware, Training, Networking Operations is about half the budget –Will start with LCG as base operations grid

Tony Doyle - University of Glasgow EGEE Operations Resource Centres – all sites Regional Operations Centres (ROC) –At least one per region! Core Infrastructure Centres (CIC) –CERN, RAL, CNAF, CC-IN2P3

Tony Doyle - University of Glasgow Operational Roles Core Infrastructure Services (CIC) –Grid information services –Monitoring services –Resource brokering –Allocation and scheduling services –Replica data catalogues –Authorisation services –Accounting services Still to be defined fully in EGEE Core Operational Tasks (ROC) –Monitor infrastructure, components and services –Troubleshooting –Verification of new sites joining Grid –Acceptance tests of new middleware rreleases –Verify suppliers are meeting SLA –Performance tuning and optimisation –Publishing use figures and accounts

Tony Doyle - University of Glasgow LCG Operations RAL has led project to develop an Operations Centre for LCG1 –Applied GridPP and MapCenter monitoring to LCG1 –Dashboard combining several types of monitoring –Setup a web site with contact information, ….. –Developing Security Plan –Accounting the next priority

Tony Doyle - University of Glasgow ‘GridPP’ Monitoring

Tony Doyle - University of Glasgow

Today’s GridPP Operations 1.Support Team built from sysadmins. 4 funded by GridPP to work on EDG WP6, the rest are the usual site sysadmins. 2.Methods list, phone meetings, personal visits, job submission monitoring RB, VO, RC for UK use to support non-EDG use Planned to verify EDG releases but they have been too infrequent to test procedures 3.Rollout Experience from RAL in EDG dev testbeds and IC and Bristol in CMS testbeds 10 sites have been part of EDG app testbed at one time

Tony Doyle - University of Glasgow UK Production Grid The UK Team described earlier will be expanded with EGEE ROC and CIC posts to meet EGEE requirements To deliver an EGEE grid infrastructure that must also deliver to other communities and projects Could do this just within PP (Matching funding available – see opposite) but want to engage fully with UK Core programme Tier1 (16.5 FTE) UK Team (8 FTE) UK GSC (2 FTE) (2FTE) EGEE ROC (5 FTE) EGEE CIC (4.5 FTE)

Tony Doyle - University of Glasgow The UK Grid Teams Middleware –Needs support Resource Teams –Putting the fabric on the grid Support –Both of users and resource centres Grid Services –RBs, R-GMA, Vos, VOMS, MDS Monitoring –Networks, sites, services Tool Development Documention EDG, EGEE, GridPP2 Tier1, Tier2s, + ????? TB-Support New Team LCG GOC Ad hoc user documentation and EGEE deliverables.

Tony Doyle - University of GlasgowSummary Too Many Grids Break down the barriers Build a UK-wide team(s) to run a UK Grid –GridPP/EGEE can do this but need to engage with the rest of the UK programme A challenge!