Think Change Be Change Lead Change CT PIT 2014 Emergency Shelter Project Staff Training January 2014 Training PowerPoint Provided by CCEH CT Coalition.

Slides:



Advertisements
Similar presentations
Presents: The Blue Ridge H M I S.
Advertisements

Overview and Introduction to HMIS Concepts: VA Community Contracts Part II: Data collection requirements, reporting requirements, AHAR, and Pulse.
2014 HUD Data Standards. New & Active Clients All ESG, CoC and SSVF funded agencies are required to begin collecting data on new and active clients based.
Point-in-Time Count/Survey & Homeless Needs Assessment.
HUD Homeless Program Data
Point In Time Count: Focus, Feedback and Planning Cathy ten Broeke, Director, MN Office to Prevent and End Homelessness Amy Stetzel, Project Manager, MN.
Metropolitan Washington 2013 PIT Count Training November 29, 2012.
2012 SuperNOFA Presented by: OC Partnership 1505 E 17 th Street Santa Ana, CA (714) HMIS Reports Training.
A SYSTEM IN TRANSITION: Shifting our priorities and programs to end homelessness Denise Neunaber North Carolina Coalition to End Homelessness securing.
2014 H OUSING I NVENTORY C OUNT (HIC): W HAT YOU NEED TO KNOW ! J ANUARY 14, 2013.
SERVICEPOINT 4.0 The importance of Annual Homeless Assessment Report (AHAR) and Entering Children into a household By NH-HMIS.
HMIS Homeless Management Information System. MISSION To provide standardized and timely information to improve access to housing and services, and strengthen.
2015 Point In Time Count: Broward County CoC Plan to End Homelessness
HOW TO MAKE HOMELESS POINT-IN-TIME (PIT) COUNT MORE SUCCESSFUL The Second Annual Nebraska-Western Iowa Symposium on Homelessness Homeless in the Heartland.
Annual Update on the Homeless Continuum of Care
General HMIS Resources Housing Inventory Count (HIC) And VA Programs.
Preparing for Your 2012 Housing Inventory and Point-in-Time Counts with Special Attention on Veteran Program Guidance November 1, 2011.
Presentation to the CCEH Annual Training Institute 5/8/14
Nutmegit.com Provided by: P W HMIS DATA COORDINATOR MEETING February 2013.
Data Standards and Reporting 2014 Updates and what they mean for your programs.
Nutmegit.com Provided by: P W HMIS DATA COORDINATOR MEETING January 2013.
Running the New HUD APR August wilderresearch.org Webinar Use the questions section in the bar on the right to ask questions ─ We will do our best.
1 The Point in Time Enumeration Process in Washington, D.C. Darlene Mathews The Community Partnership for the Prevention of Homelessness
Think Change Be Change Lead Change CT PIT 2013 Program Staff Training January 2013 Training PowerPoint Provided by CCEH CT Coalition to End Homelessness.
Homelessness in Delaware: Summary of the 2011 Point-in-Time Study.
2014 Homeless Management Information Systems (HMIS) Data Standards for ESG Presented by Melissa Mikel September
Supportive Services for Veteran Families (SSVF) Data Data Collection & Reporting: Basics Updated 5/22/14.
Including Youth in Your Community’s Point-in-Time Count, Part 1.
Conducting Better Point-in-Time Counts of Homeless Persons Erin Wilson Abt Associates Inc. Washington, DC July 9, 2007.
PARTNER’S MEETING JANUARY 2011 Safe Harbors. Agenda Welcome, introductions, agenda review Review of Safe Harbors restructure and next steps Safe Harbors.
2015 POINT IN TIME & HIC. Sheltered PIT Data 2015 People in Households with Children.
It’s Not Just Numbers: Implementing Point-in-Time Counts, Using HMIS, and Ensuring Data Accuracy Erin Wilson, Abt Associates Inc. Julie Eberbach, Iowa.
1. 2 INTRODUCTIONS Kathleen Wing 3 Volunteer Coordinator Manette Magera (321)
Think Change Be Change Lead Change CT PIT 2014 Permanent Housing Project Training January 2014 Training PowerPoint Provided by CCEH CT Coalition to End.
Counting the Homeless in Alaska Kris Duncan MSW Alaska Housing Finance Corp
Supportive Services for Veteran Families (SSVF) Data Data Collection & Reporting Basics.
Client-level Analysis of Emergency Shelters: Columbus and Franklin County, Ohio RLUS Steering Committee Presentation December 5, 2006.
MOVING FROM DATA TO ACTION ADDRESSING HOMELESSNESS THROUGH A RBA FRAMEWORK POINT-IN-TIME COUNTS.
Think Change Be Change Lead Change CT PIT 2014 Transitional Housing Project Training January 2014 Training PowerPoint Provided by CCEH CT Coalition to.
2014 POINT IN TIME COMMUNITY REPORT SHELTERED PERSONS REPORT.
2010 Florida HMIS Conference 1. Using HMIS to Inform Performance Measurement Outcomes Objective: –Enhance awareness and understanding on using HMIS to.
Point-in-Time Count January What Does It Mean to Count Homeless People? A “count” = collecting information about the sheltered and unsheltered homeless.
Prepared by Abt Associates for the U.S. Department of Housing and Urban Development The First Annual Homeless Assessment Report.
2016 St. Johns County Point In Time Count When: Thursday, January 28, 2016.
2015 POINT IN TIME & HIC. Homeless Survey Sectors.
Homeless Management Information Systems The Calgary HMIS - A joint initiative between the CHF and the Homeless Serving Sector in Calgary Date: April 21,
HMIS Data Quality Training 211 Orange County. Learning Objective This training is scheduled for 2 hours. Objective 1.Teach users how to find deficiencies.
HMIS Management Reports and Data Quality Training Last updated:1/26/2012.
Thursday, March 1, Agenda Status of Post Count Process Common Issues/Errors HMIS data Non-WISP data HIC Deduplication Impact of Service Based Counting.
Data Quality Tools & Best Practices Matthew D. Simmonds, Simtech Solutions Inc.
PIT/HIC Data Entry and Reporting
2017 Housing Inventory Count Webinar
2017 Housing Inventory Count Webinar
2017 Housing Inventory & Point-in-Time Night January 25, 2017
Point in Time Count/Housing Inventory Count Presentation
2017 HIC & PIT January 26, 2017.
Point In Time, 2017 CONTINUUM OF CARE FOR
HMIS Data Standards 2017 Changes
What is the Homeless Point-in-Time Count?
2016 Annual Homeless Assessment Report (AHAR)
Point-in-Time January 24, 2017
Minnesota’s Homeless Management Information System (HMIS)
Shelter Count Training
Pittsfield/Berkshire, Franklin, Hampshire Counties CoC
Annual Homeless Point-in-Time & Housing Inventory Count
an overall reduction of 13%.
System Performance Measures (SPMs) and Longitudinal System Analysis (LSA) Data Quality 2018.
Including Youth in Your Community’s Point-in-Time Count, Part 1
Housing Inventory Count (HIC) Report Training
2019 Data Standards September 4, Data Standards September 4, 2019.
Presentation transcript:

Think Change Be Change Lead Change CT PIT 2014 Emergency Shelter Project Staff Training January 2014 Training PowerPoint Provided by CCEH CT Coalition to End Homelessness 257 Lawrence St. Hartford, CT

Think Change Be Change Lead Change 2 CT PIT 2014 Count will be held on: Wednesday, January 29, 2014

Think Change Be Change Lead Change HUD mandate Collect data to inform efforts to end homelessness in Connecticut Help service providers and policy makers to better understand the needs of homeless people and design effective interventions Develop a consistent methodology for collecting reliable longitudinal data to measure progress towards ending homelessness. Purpose of CT PIT

Think Change Be Change Lead Change Q: What does an emergency shelter have to do for PIT? A: 1.Submit a bed count 2.Submit a population count 3.Make sure all HMIS data is entered and accurate

Think Change Be Change Lead Change Q: How do I submit a bed and population count? A: Through an online web form. You will have a login/password Link will be sent out ~ a week before the count

Think Change Be Change Lead Change Q: How do I make sure all HMIS data is complete and accurate? A: Run data quality reports beforehand Exit any open clients that are no longer at the program Make sure all questions are answered for all persons Update chronically homeless questions on intake assessment

Think Change Be Change Lead Change 7 CoCs will need to identify the number of beds within projects that are dedicated to veterans and youth. For dedicated youth beds, CoCs need to indicate the age group that the beds are dedicated to serve (i.e., only children under 18, only persons 18 to 24, or persons up to 24). New to PIT This Year

Think Change Be Change Lead Change 8 Population and Subpopulation Changes CoCs will be required to report race, ethnicity, and gender data for all persons counted. CoCs will be required to report population data for veteran households. Because CoCs are reporting the population data for veteran households the veteran subpopulation requirements have been removed. New to PIT This Year

Think Change Be Change Lead Change 9 Completing the Population and Bed Count

Think Change Be Change Lead Change 10 Population and Bed Count What’s the difference between the Bed Count and the Population Count? BED COUNT: Counting the # of BEDS/UNITS available at your project. The Bed Count takes an ‘inventory’ or shows project ‘capacity’ and ‘configuration’ on the night the Count. POPULATION COUNT: Counting the PEOPLE who stayed at your project on the night of the Count. The Population Count is like a ‘head count’ of people that were residing at each project on the night of the Count.

Think Change Be Change Lead Change 11 Population and Bed Count Once you are in the PIT database… Basic information about the program Verify that the programs you are seeing are yours – and that none are missing Number of beds/units on-line at the time of the Count Number of persons by gender, race, and ethnicity

Think Change Be Change Lead Change 12 Bed Count Represents your projects capacity, it is the Inventory of the number of beds / units available on the night of the count - whether or not they are occupied. If your project’s configuration of beds/units changes over time or due to need, the Bed Count should reflect the configuration of your program ON THE NIGHT OF THE COUNT

Think Change Be Change Lead Change 13 Reporting Target Populations A population is considered a "target population" if at least three-fourths (75 percent) of the clients served by the project fit the target group descriptor. Projects that do not target specific populations or that have opted not to track Target Population A may leave this data field blank Target Population B designation is used if your project serves only DV or HIV/AIDS sub-populations Reporting Program Info

Think Change Be Change Lead Change 14 Bed Count Inventory Type Current inventory (C): Beds and units that were available for occupancy on or before January 31, New inventory (N): Beds and units that became available for occupancy between February 1, 2013 and January 31, Inventory designated as ‘New’ should represent an increase in capacity for the project from the previous year. Under development (U): Beds and units that were fully funded but not available for occupancy as of January 31, 2014

Think Change Be Change Lead Change 15 Bed Count The number of beds and units available for… A.Households without children: Beds and units are intended for households with adults only. This includes households composed of unaccompanied adults and multiple adults. B. Households with at least one adult and one child: Beds and units intended for households with (at least) one adult and one child. C. Youth Households: Beds and units intended for households composed exclusively of persons… Only children under 18 Only persons 18 to 24 or Persons up to 24.

Think Change Be Change Lead Change 16 Bed Count Bed Inventory Veteran Bed Inventory: The number of beds that are dedicated to house homeless veterans and their families. Youth Bed Inventory: The number of beds that are dedicated to house homeless youth. Additionally, you will need to identify if the beds are dedicated to serve…. Only children under 18 Only persons 18 to 24 or Persons up to 24.

Think Change Be Change Lead Change 17 Bed Count Seasonal Beds are available to individuals or families on a predictable schedule at certain times of the year only – you MUST specify the time-frames that the beds are online Overflow Beds/Vouchers are available to individuals or families at peak times of demand and can include mats/spaces in shelter & payments for hotel stays

Think Change Be Change Lead Change 18 Bed Count Which BEDS should NOT be counted?  Do not count beds/units that are not specifically designated for homeless people (i.e. Do not count beds/units at mental health or substance abuse programs if they are not designated for homeless people. Also do not count beds/units at DCF funded programs.)  Do not count beds that are not actually available on the night of the count (e.g. beds in development and beds off-line for repairs).  Do not count cribs

Think Change Be Change Lead Change 19 Bed Count Hotel/motel VOUCHERED BEDS Count the # of overflow beds that each voucher provides, not the number of vouchers. Example: If your project gives a motel voucher to a family of four, include four overflow beds in your bed count (not 1 voucher)

Think Change Be Change Lead Change 20 Population Count A head count of all persons – Adults & Children – staying in your emergency shelter on the night of the count

Think Change Be Change Lead Change 21 Population Count A.Persons in households with at least one adult and one child. This category includes households with one adult and at least one child under age 18. B. Persons in households without children. This category includes single adults, adult couples with no children, and groups of adults. C. Children Only Households D. Veteran households with and without children.

Think Change Be Change Lead Change 22 Population Count Counting people sheltered through a hotel/motel voucher Count the number of people that each voucher is providing for, not the number of vouchers themselves. Example: If your program gives a motel voucher to a family of four, include those four people in your ‘Households With Children’ count (not 1 voucher)

Think Change Be Change Lead Change Collecting Client Demographics

Think Change Be Change Lead Change 24 For emergency shelters… collecting client demographics = doing your everyday shelter intake in HMIS Collecting Client Demographics

Think Change Be Change Lead Change 25 GET PREPARED NOW. Emergency shelters: Run your E800 in ART Every single data point should be at a completion rate of 95% or higher. Collecting Client Demographics

Think Change Be Change Lead Change 26 Who uses paper surveys to collect client demographic data? Identify your shelter projects from the three categories below: 1. Those that use HMIS 2. Those that do not use HMIS, and serve any homeless person who comes to the door 3. Those that do not use HMIS, and ONLY serve DV, or youth population Category 1: Client demographics will be pulled from HMIS. NO paper surveys here. Category 2: Client demographics are not captured. NO paper surveys here. Category 3: Adult clients are to complete a paper survey on the night of the count. Collecting Client Demographics

Think Change Be Change Lead Change 27 Wrap-Up Questions? Comments? Brian Roccapriore, Director of HMIS and Strategic Analysis x110 or