Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.

Slides:



Advertisements
Similar presentations
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Advertisements

Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
ANTARES and KM3NeT John Carr Centre de Physique de Particules de Marseille IN2P3 / MICINN meeting Madrid, 12 Jan 2009.
Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” Technical.
Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
The ANTARES experiment is currently the largest underwater neutrino telescope and is taking high quality data since Sea water is used as the detection.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Antoine Kouchner Université Paris 7 Laboratoire APC - CEA/Saclay for the ANTARES collaboration Neutrino Astronomy: a new look at the Galaxy Astronomy Neutrino.
CEA DSM Irfu The ANTARES Neutrino Telescope A status report Niccolò Cottini on behalf of the ANTARES Collaboration 44 th Rencontres de Moriond February.
Piera Sapienza – VLVNT Workshop, 5-8 october 2003, Amsterdam Introduction and framework Simulation of atmospheric  (HEMAS and MUSIC) Response of a km.
V.Bertin CPPM / ANTARES Coll. - Moriond ANTARES : A deep-sea 0.1 km² neutrino telescope Vincent Bertin - CPPM-Marseille on behalf of the Antares.
SINP MSU, July 7, 2012 I.Belolaptikov behalf BAIKAL collaboration.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
Antares Neutrino Telescope Jean-Pierre Ernenwein Université de Haute Alsace (On behalf of the ANTARES collaboration) Rencontres de Moriond, 13/03/2005.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Timing calibration in NEMO M. Circella Istituto Nazionale.
Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Acoustic Calibration for the KM3NeT Pre-Production Module Alexander Enzenhöfer on behalf of the KM3NeT consortium VLV T 2011 Erlangen, –
The ANTARES detector: background sources and effects on detector performance S. Escoffier CNRS Centre de Physique des Particules de Marseille on behalf.
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
Time over Threshold electronics for an underwater neutrino telescope G. Bourlis, A.G.Tsirigotis, S.E.Tzamarias Physics Laboratory, School of Science and.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Status report on the Antares project Luciano Moscoso (DSM/DAPNIA, CEA/Saclay F Gif-sur-Yvette) (On behalf of the ANTARES collaboration)
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
PMT measurements in Antares Oleg Kalekin on behalf of Antares collaboration VLVnT 2011 Erlangen
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Control Considerations for the KM3NeT Very Large Volume neutrino Telescope” The.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
Simona Toscano In the frame of KM3NeT consortium VLV T workshop - Toulon, April 2008.
Development of combined sensors for UHE neutrino detection Alexander Enzenhöfer ARENA 2010 Nantes,
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
VLVNT’08 - ToulonM. Ardid – Positioning System of the ANTARES Neutrino Telescope Positioning system of the ANTARES Neutrino Telescope Miguel Ardid (IGIC.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
S.BEURTHEY CPPM/IN2P3 anémone ανεμώνη anemone Preliminary Development plan A ntares NEMO NE stor CATANIA 12 of March 2008.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Deep sea infrastructure: ROV M. Musumeci KM3NET meeting Paris October 2008.
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
ANTARES Lessons learned from its completion
Write-up and Definitions for Cost Model
Robert Lahmann VLVnT – Toulon – 24-April-2008
T. Eberl for Robert Lahmann and the Erlangen acoustic group
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Junction Boxes for KM3NeT
ANTARES time calibration
Sea Operations for “km3” neutrino telescope
Nanobeacon: A low cost calibration instrument for KM3NeT
Acoustic Measurements in ANTARES: Status and Aims
Presentation transcript:

Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

Contents 1.ANTARES apparatus (brief introduction) 2.Construction and maintenance operations 3.Experience gained during the process (key points) 2 VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

M. Circella, Apparatus status and plans 3 ANTARES ERC/FRB meeting, Paris, 8 March 2010 © F. Montanet 12 detection lines 25 storeys / line 3 PMTs / storey ~900 PMTs ~70 m 100 m 350 m 14.5 m Submarine links Junction Box 40 km cable to shore Anchor/line socket a storey ~2500 m depth The ANTARES apparatus

Hydrophone Rx (5 RX + 1 RxTx/line) Local Control Module (inside a titanium cylinder) Optical Beacon for timing calibration (blue LEDs) 17” glass sphere 10” PMT Ham. R (14 stages) Basic detector element: storey 4 (4 beacons/line) VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

The apparatus: key numbers and features 12 detection lines + instrumentation line 25 storeys/line, each with 3 optical modules and an electronics container (Local Control Module-LCM or Master Local Control module, MLCM) 5 sectors, each with up to 5 storeys, in each detection line---sectors are the basic functional units (for power, clock, data transmission) of the lines 885 optical modules installed in total for data acquisition, + acoustic positioning system and an optical beacon time calibration system, + AMADEUS (a prototype system for neutrino “acoustic detection”), + various devices for site monitoring and/or environmental sciences Original design: each line is connected to the underwater junction box by means of its own interlink cable---modified design for last lines: two lines are connected to the same junction box output by means of a y-shaped interlink cable 5 VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

Construction of the apparatus Junction Box and long-distance electro-optical cable installed in – Junction Box in operation for almost 10 years! Various prototype lines operated in The 12 detection lines were installed between 2006 and 2008 – first lines in operation for more than 5 years! 6 Line being loaded on the ship Line deployment Line connection VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

Line recovery The automatic release of the anchor can be activated from the surface - no need to prior disconnect the line from its cable After release, the line will float up to the surface Line recovery is very similar to a time-inverted deployment operation 7 VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES Non-standard recovery of line 9 (hooked-up from the ship) The speaker on the ship after a line recovery – or was it before a line deployment?

Maintenance operations of the past 3 years Repair of the main electro-optical cable in summer 2008 Replacement of a few interlink cables, installation of new-design cables (y- and x-shaped) (remark: wet-mateable cables and connectors are among the most critical items in the apparatus) 3 lines (lines 12, 6, and 9) recovered, upgraded and reinstalled in Not discussed in this talk VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES ~90% of optical modules operational a few sectors h.s. Apparatus status at end of construction

Line recovered on March At time of recovery, 3 sectors out of 5 were not operational A leak was suspected in LCM6 During line recovery one OM reached the sea surface free… It was a faulty OM which had got free from storey 6 (due to failure of one screw) A leak was detected on LCM6, which contained about 1.2 l of water. The microleak (1.2 l in ~4 230 bars!) was located on the connector for the faulty OM Power problems developed inside the module Moral: without precautions, one faulty screw can lead to a failure of one complete line Line 12 investigations 9 See this slide in presentation-mode with “animations on”! Solution implemented in all recovered lines VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

10 Line 6 and 9 investigations Power box of MLCM of sector 5 of line 6 found faulty (no operation of the full sector) Problem on one output of the power module of line 9 (no operation of one sector) Both problems above showed up shortly after installation of the line => procedures modified so that more extended tests are performed onshore before deployment A small amount of water was found in LCM of storey 5; the leak seem to have taken place under low pressure, at the interface between the titanium cylinder and the top flange---the module had been re-opened and re-sealed soon before the first deployment (in non-optimal conditions) Moral: stick to the procedures! Water marks… VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

Flooded Optical Modules About 3% of the OMs installed are flooded, in most cases from the very beginning The recovery of line 9 allowed us to inspect two of them: the problem is due to a failure of the vacuum valves 11 VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES (One flooded OM recovered on line 9)

On the HV re-tuning procedure 12 Change of HV settings can compensate for OM gain drifts (at the cost of a full calibration for threshold settings, charge conversion parameters, time offsets) Most of the channels show a negative gain drift, hence they need a HV increase Typical HV change is in the range of a few tens of volts (see plot below for the very first tuning); for a small fraction of channels a change larger than 100 V is required The HV range of the PMT bases allow us to repeat this procedure at least for ~10 more times in the future Implication: no significant biofouling on the OMs! VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

Experience gained (management point of view) 13 Maintenance of deep-sea structures is possible, if it is well prepared (spares, facilities, expertise) A good Quality System is vital for construction as well as for apparatus operation and maintenance A detailed Analysis Risk has to be performed before finalizing the design, and then constantly revised – beware: this can be a very tricky business! Stick to the (carefully defined) procedures! Extensive tests have to be performed on everything; precautions against failure of anything should be adopted VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

14 Upgrades Nanobeacons installed on 3 OMs of one line Modified LED beacons installed on two lines Next: laser beacon and acoustic emitter installed on the instrumentation line; prototype KM3NeT DOM(s) proposed to be installed as well VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES

Conclusions 15 ANTARES shows that construction AND maintenance of a large apparatus in the deep sea is possible After the long maintenance campaign of the past 2 years (3 lines recovered, upgraded and reinstalled) the apparatus is again in stable data taking conditions, in the full 12-line configuration, since November 2010 – remark: 3 lines in 2 years was just the level of maintenance expected. Line problems due to old failures. Rest of the apparatus is stable. The loss of OMs is at the level of 1.5% of available channels per year => Data taking extended to 2016 Some KM3NeT-oriented upgrade performed on the recovered lines + plan to install prototype(s) of KM3NeT DOM on the instrumentation line Secondary Junction Box of Ifremer installed for associated science purposes Important experience gained during these activities, useful for KM3NeT design VLVnT11, Erlangen, 13 October 2011M. Circella, INFN Bari: Maintenance of ANTARES