" Current status and perspectives of Clean Development Mechanisms Buenos Aires, September 2003 Content of the presentation: The cdm.unfccc.int homepage.

Slides:



Advertisements
Similar presentations
Ongoing discussions on the formulation of National Appropriate Mitigation Actions (NAMAs) and their possible inclusion as market mechanisms in a post-2012.
Advertisements

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Contribution of CDM projects to sustainable development Case Study - Bolivia Sergio Jáuregui Consultant Santa Cruz, Bolivia, August 2004.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
An Update on the Clean Development Mechanism National Workshop on Baseline Methodologies CD4CDM Project (Phase II) Sami Kamel, Ph.D. UNEP RISOE Center,
Compilation and analysis of available information on ways and means to enhance equitable regional and subregional distribution of projects under the clean.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
ECONOLER INTERNATIONAL CDM/JI Office Canada Development of a Portfolio of CDM Projects in Indonesia Access to CDM & JI office of Canada facility Presented.
Pilot Project on the Use of Flexible Instruments for Climate Policy in Baden-Wuerttemberg: A Manual to Facilitate Companies Participation Fraunhofer Institute.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
Roster of experts of the clean development mechanism (CDM) 11 June 2003 Mikhail Vartanian & Kay Merce CDM / Cooperative Mechanisms.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
El Gallo Hydroelectricity Project PDD Analysis
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Barriers to the Successful Implementation of Kyoto Mechanisms (JI/CDM) in CEE and CIS Countries Marina Shvangiradze Ministry of Environment Protection.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Update on the CDM May 2004 UNFCCC/Cooperative Mechanisms CDM team.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Activities on regional distribution of Clean Development Mechanism (CDM) Projects With reference to LDCs.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Clean Development Mechanism
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Presentation title Africa Carbon Forum 13 April, 2018 Nairobi
Joint implementation and eligibility requirements
Presentation transcript:

" Current status and perspectives of Clean Development Mechanisms Buenos Aires, September 2003 Content of the presentation: The cdm.unfccc.int homepage COP/MOP, EB (+panels), DNA, DOE The Project Design Document (PDD) Small-scale CDM project activities Baselines Brazilian CDM project proposals New developments, internet CDM sites

The UNFCCC-CDM homepage

The COP/MOP responsibilities (a)Make decisions on the recommendations made by the Executive Board on its rules of procedure; (b)The designation of Operational Entities (c)Review annual reports of the Executive Board; (d)Review the regional and subregional distribution of DOEs and CDM project activities. (e)Assist in arranging funding of CDM project activities

The Executive Board (EB) The responsibilities of EB include: a) to supervise the CDM, under the authority and guidance of the COP/MOP; b) to make recommendation to the COP/MOP on further modalities & procedures for the CDM, as appropriate; c) to review and approve new methodologies related to baseline and monitoring plan; d) accreditation of operational entities; e) to develop and maintain the CDM registry;.f) to establish Panels (Accreditation & Methodology) and rosters of experts. The EB have had 11 meetings. The Meth panel 6 (meeting documents available).

Designated National Authorities (DNA) Parties participating in the CDM must designate a national DNA (13 Latin American, 3 Asian, 1 Arab countries have informed UNFCCC) The DNA issues statements on voluntary participation and confirmation that a CDM project contribute to sustainable development in the host country The DNA establish national rules, criterias for eligibility, sustainablility and approval

Accreditation of Designated Operational Entities (DOEs) At the moment 14 entities have applied for accreditation -7 from Western Europe -6 from Japan -1 from South Korea Applicant Entities (AE) from Africa and South America missing! At EB7 the “Procedures for accrediting operational entities by the EB for the CDM” was adopted (available on the UNFCCC-CDM home page). The procedure consist of: Desk review by an Accreditation Team (AT) On-site assessment by the AT Witnessing activity by the AT

Current sectoral accreditation Scopes The Operational Entity can at the present select to be accredited for the following sectoral scopes (the Meth-panel and the AP-panel are now coordinating their sectors):

Modalities and Procedures (M&P) for the CDM The M&P for CDM projects was adopted at COP7 in Marrakesh and is the content of Decision 17/C.P.7 A special M&P for small-scale CDM was adopted at COP8, and can also be found on the UNFCCC-CDM home page. The M&P describe the general rules for the CDM project cycle, and the Executive Board have developed more detailed rules in their first 10 meetings. At their seventh meeting the detailed rules for small-scale CDM were finalized. M&P for afforestation & reforestation project will be finalized at COP9 in Milano in December.

Content of the Project Design Document (PDD) The small-scale PDD contains the same sections (fewer annexes). The project duration can be 3*7 years or 1*10 years A ”Glossary of terms used in the CDM project design document” was finished at EB7.

Eligible technologies A list of eligible categories exist for small-scale CDM. No positive list exist for full-scale CDM, only a negative list: Nuclear Power is not eligible The only eligible sink projects for the first commitment period is Afforestation and Reforestation. COP 9 in december must decide on the Modalities and Procedures for other LULUCF projects. CDM projects must give real, measurable, and long- tem benefits related to mitigation of climate change. CDM projects must be additional in the host countries

Present eligible small-scale CDM project categories The project participants can themselves propose new categories incl. methodologies to the EB.

Baseline approaches  Existing actual or historical emissions, as applicable; or  Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment; or  Average emission of similar projects activities undertaken in the previous 5 years, in similar circumstances, and whose performance is among the top 20% of their category. According to the Modalities and Procedures for CDM §48 new baseline methodologies must be using one of the three approaches:

Procedure for approval of new methodologies At EB8 the “Procedures for submission and consideration of a proposed new methodology” was finalized.

The first 21 proposed new (baseline & Monitoring) methodologies sent to the EB Conclusion: Highest activity in South America. Only one energy efficiency improvement methodology.

Guidance/clarifications from the EB  4 guidance + 1 clarification document available  Tools for demonstarting additionality  Baseline emissions shall also be calculated ex-ante  New baseline methodologies shall be proposed together  The new methodologies shall only be described in annex 3+4 of the PDD  If there is an activity increase in a project, a separate baseline must be provided for that  The three types of small-scale CDM project activities are mutual exclusive.

Registration of CDM projects The CDM registry is being constructed. It will contain public information on all CDM projects: issuance, holdings, transfer and acquisition of CERs At the EB6, the following fees were decide for the registration of a CDM project. The fee for small-scale CDM projects has been reduced to 5,000 US$:

Small-scale CDM project project proposals The Aquarius Hydroelectric Project is a 4.2 MW grid connected run-of-river hydropower plant (with no dam or flooding) at Itiquira, Mato Grosso State, Brazil (DNV portefolio) UTE Barreiro fuel switch project: This steel plant uses charcoal from Eucalyptus. The wood tar from the vapours of the charcoal production + the blast furnace gas is used for a 12.9 MW power plant (Ecosecurities).

Other sources of CDM information have critical information on CDM project + information of CDM projects by country. Joint Implementation Quarterly: An electronic quarterly newletter about the latest CDM/JI developments: PointCarbon: News on the carbon trading markets: Climate-L: Montly newletter on the climate change policy process: UNEP Risø CDM capacity building projectwww.cd4cdm.org

New developments 23 July: The EU Commission proposal for linking the EU emission trading scheme with the CDM (&JI): No nuclear projects, hydro must follow the World Commission on Dams criteria, LULUCF maybe after COP-9. Tt trading of 6% of the total allowance a review is triggered – maybe followed by a 8% cap. The WB has launched 1) the Community Development Carbon Fund, 2) the BioCarbon Fund.