SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 1 Office of Science NCSX Project Review of NCSX April 8-10, 2008 Cost and Schedule Ron.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Office of Project Management Metrics Report Presentation
Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
S/W Project Management
IT Project Management Cheng Li, Ph.D. August 2003.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
PLANNING AND SCHEDULING
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
NCSX Project Risk Management & Contingency Analysis Chris Gruber March 13, 2008.
Assigning Resources A schedule is not complete until all the resources necessary to complete the project have been committed or assigned.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
SacProNet An Overview of Project Management Techniques.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
1 Alternative EVM Applications Not a One-Size-Fits-All.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
NCSX PROJECT OVERVIEW AND MANAGEMENT James L Anderson NCSX Project Manager August 15, 2007.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
PPPL is Committed to the Success of NCSX Rob Goldston, Director Princeton Plasma Physics Laboratory August 15, 2007.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Supplier Management Can’t live with them, Can’t live without them!
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Management W. J. Foyt
Systems Analysis and Design in a Changing World, 4th Edition
Establishing and Managing a Schedule Baseline
LSST Project EVMS Performance Overview Kevin E
External Independent Review (EIR)
Project Management Chapter 11.
Linac Coherent Light Source (LCLS)
Presentation transcript:

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 1 Office of Science NCSX Project Review of NCSX April 8-10, 2008 Cost and Schedule Ron Strykowsky

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 2 Topics Baseline Formulation Process Basis and Assumptions Results Cost Contingency Schedule Staffing Project Control Processes EIR Summary Assessments Summary

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 3 Baseline Formulation Process Job Managers Reviewed and Updated WAF’s (realistic not best case) Additional scope per August Lehman review recommendations Critically reviewed all job estimates to reflect current design maturity & experiences to date Internal Engineering Department Review for Critical and Large Job Estimates Assigned labor resources to tasks Updated overhead and labor rates Updated resource Loaded Schedule Focus on critical path optimization Off critical path scope (maximize free float) Fit Program funding targets Expanded and quantified project risks Contingency analysis process (probabilistic approach) March PU Review Submit New Baseline Proposal to OFES March 26 Office of Science Review April 8-10 Submit Baseline Change Proposal to OECM April 21 External Independent Review May The WAF’s are the basis of all estimates The resource loaded schedule is the master schedule and cost estimate data base

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 4 Work scope organized and documented in the Work Breakdown Structure

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 5 The WAF is the basis of all estimates Work Authorization Forms (WAF’s) –Disciplined and uniform approach for all work –Excel based spreadsheet including; Table 0 – Work scope description and approvals Table I – Design Labor (usually in man-hours or FTEs) – (priced in Primavera) Table II – Materials and supplies - usually direct procurements of materials and components (direct dollars) (priced in Primavera) Table III – Fabrication and assembly operations (combination of labor hours and material and supplies needed to support these operations) Table IV – Estimate uncertainty and Risk –Job Manager assessment of design maturity/complexity and identification of residual risks that should be included in the Risk Register Basis of estimate categorized and summarized in each WAF

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 6 Key Planning Basis and Assumptions ETC forward from February 1 st, 2008 Cost Incurred from April 1, 2003 (MIE project inception) Every Job Reviewed, most re-estimated GPP and Infrastructure not part of MIE project. (Shown in the resource loaded schedule. Progress coordinated and tracked by Erik Perry) Program BA constraints Institutional Overhead Rates (CAS Compliant) Standard work week 8hrs/day 5 days/ week (Exceptions; Field period assy (sta3 FPA#3, station 5, and Final Machine assy make use of select 2 shift operations). No overtime or Saturday work planned. Overtime and Saturday used to maintain schedule. Holidays Contingency Allocation by fiscal year (commensurate with risk & cost uncertainty) Task durations - more detail on critical path and near term

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 7 Based on deliverables and/or tasks identified by the job managers Input varied from resource loaded schedules to deliverables and resource estimate only Established tasks, internal milestones (PDR’s, FDR’s, contract awards) Task durations based on realistic resource loadings & crew sizes Logically linked (2,170 tasks, 2700 links, 2900 individual resource loadings) Non-critical path tasks scheduled within BA constraints with free float to critical path Schedule iterated based on Optimizing the critical path. (use of 2 shift operations, floor space for assembly tasks, crane utilization studies) Maximizing free float for non critical path tasks (ie procurements) Front end loading system designs Annual contingency set-asides Resource leveling exercises to optimize techs and key engineers (did not impact critical path or cost) Scheduling - Process

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 8 Cost Basis - Resource types and Rates Resource Types, labor and overhead rates Overhead and escalation rates Labor Skills (hourly rates) Non-Labor Resource

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 9 Contingency - Process Structured process - probabilistic risk analysis based (Monte Carlo Analysis) Objective was to assess and analyze all areas of uncertainty and risk that might affect the cost and schedule estimates Project Risk Registry key input (grown from 36 to 88 risks & monitored monthly) Job Manager and Project Team input Cost and schedule contingencies quantified Contingency Allowance Range – 95%, 90% and 80% confidence levels analyzed Chris Gruber to provide comprehensive analysis

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 10 Contingency – Results

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 11 Results – Cost Reconciliation

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 12 Results – Cost Detail by Job

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 13 Results – Cost/Percent Completion

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 14 Results – Program BA Profile Delayed research start Contingency distribution tempered by maximizing non-critical path free float (i.e. provide margin for vendor delays)

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 15 Results – Schedule (Summary) Critical path through field period assembly, final machine assembly and start-up operations Major procurement of components as well as ancillary system have ample schedule margin (months off critical path)

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 16 Critical Procurements Well Off Critical Path

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 17 Results – Milestones Milestones provide good metric of schedule progress Distribution of milestones reasonable

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 18 Results – Resource Loaded Schedule Resource skill and hours (from WAF) Cost (= hours x rates) Total float in working days (~1 month = 21 days) Planning assumption: 1 shift per day or 2 shifts per day

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 19 Staffing Requirements- Technicians Staffing requirements achievable and being satisfied TFTR D&D manpower profile for comparison Current level

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 20 Staffing Requirements- Engrs & Designers Needs being met with new hires to provide depth & backup

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 21 Staffing Requirements- ORNL & Metrology

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 22 Project Controls Systems Implemented August 2007 Proposed Baseline used as interim baseline for tracking Weekly Project Meeting –Safety –Weekly look-ahead schedule (RLM led discussion) –Follow-up actions Monthly Project performance assessment meetings ─ Schedule progress ─ Level 2 & 3 milestones ─ Cost and Staffing ─ Issues ─ Risk Registry ─ ETC changes Monthly Reporting –Management summary overview –Cost performance (EVMS) reports –Variance analysis at job level –Risk Registry –Trending (performance, contingency, ETC) –Milestones –Critical Path –RLM Prepared variance analysis (with help of Job Managers) Monthly Director's Office and Princeton University Review Customer meetings (IPT, Weekly, Quarterly) 6-month bottoms-up ETC Change Control –Engineering Change Proposals (ECP) –5 processed since August 2008 (technical only)

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 23 EIR Summary Assessments 1.Resource loaded Schedule Organized by WBS (refer to WBS and WBS Dictionary) Resource estimate loading based on detail WAF (see detailed WAF packages). Estimates basis; National Standards, Engineering Judgement/Experience, Estimates/Data from External Sources (e.g., W7X, ATF, etc.), Previous PPPL/ORNL Experience (e.g., TFTR, NSTX, PLT, etc.), Prototype Data/Test Results, Catalogue Price/Vendor Quote, Placed Contracts, Actual experience for NCSX Work Task durations based on realistic manpower loadings and crew sizes. Balance of task durations based on reasonable loadings Schedule detail commensurate with schedule criticality (e.g. wbs 18 job minimum task duration 1 day). Proposed baseline BCWS and contingency profile consistent with anticipated funding levels. Shows estimate detail and priced cost estimate (see resource loaded schedule)

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 24 EIR Summary Assessments (continued) 2.Key Project Cost and Schedule Assumptions Standard 8 hour/day 5 day/week work assumed except where 2 shift operations called out in resource loaded schedule. (see slide 10 & 11) Institutional overhead and labor rates utilized (see slide 12) Contingency quantified based on estimate uncertainty and risk using Monte Carlo simulation plus a subjective increment based on project management experience. (see slides 13 & 14 and detailed contingency analysis) Contingency distributed annually consistent with needs.

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 25 EIR Summary Assessments (continued) 3.Critical Path See critical path plot on wall See detail Primavera predecessor & successor report for logic linkages 4.Funding Profile Project proposed baseline consistent with preliminary guidance (see slide 20) 5.Work Breakdown Structure Resource loaded schedule is organized by WBS (see WBS and WBS Dictionary)

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 26 SUMMARY Project has followed a disciplined path for updating its ETC highlighted by; Formal & consistent basis of estimate Independent reviews by PPPL engineering and PU Focus on obtaining realistic estimates from job managers Project has followed a methodical process for quantifying cost as well as schedule contingency. Project has expanded its risk registry and incorporated into monthly status review meetings Project has proposed a sound baseline cost estimate backed-up by a resource loaded schedule and detailed estimate basis. Project is monitoring, reporting and communicating performance to stake holders.

SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 27 DETAILED STAFFING BACKUP