1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo.

Slides:



Advertisements
Similar presentations
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
Advertisements

A Data-Driven Monte Carlo Simulation Model of Vessel Movement in Harbors David Moser, Keith Hofseth, Shana Heisey, Richard Males, Cory Rogers HarborSym.
Roadway Development Operators’ Workshop ACARP project C18023 CM2010 – Continuous Miner automation Dr David Hainsworth Dr David C. Reid 3-6 March, 2009.
Simulation - An Introduction Simulation:- The technique of imitating the behaviour of some situation or system (economic, military, mechanical, etc.) by.
Project Management Lecture 16 Project management involves estimating the length of time to complete a project Once a project has been undertaken then a.
Introduction of Continuous Miner Monitoring at Clarence Colliery ACARP Roadway Development Workshop Introduction of Continuous Miner Monitoring at Clarence.
Research Update Automated Bolting and Meshing Project - C17018.
Unilever IT Career Framework Daryl Beck IT Excellence Thursday 6 th December 2007.
ACARP Presentation Developing Worker Problem Solvers Implementing Lean Techniques and Challenges.
Chapter 4 MODEL COMPONENT Decision Support Systems For Business Intelligence.
Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
Chapter 15 Application of Computer Simulation and Modeling.
SPREADSHEETS IN EDUCATION OF LOGISTICS MANAGERS AT FACULTY OF ORGANIZATIONAL SCIENCES: AN EXAMPLE OF INVENTORY DYNAMICS SIMULATION L. Djordjevic, D. Vasiljevic.
FIN 685: Risk Management Topic 5: Simulation Larry Schrenk, Instructor.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
Discrete-Event Simulation: A First Course Steve Park and Larry Leemis College of William and Mary.
Simulation.
SQM - 1DCS - ANULECTURE Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst.
Project Update: Law Enforcement Resource Allocation (LERA) Visualization System Michael Welsman-Dinelle April Webster.
SIMULATION. Simulation Definition of Simulation Simulation Methodology Proposing a New Experiment Considerations When Using Computer Models Types of Simulations.
Descriptive Modelling: Simulation “Simulation is the process of designing a model of a real system and conducting experiments with this model for the purpose.
Lab 01 Fundamentals SE 405 Discrete Event Simulation
Business process management (BPM) Petra Popovičová.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 ACARP PROJECT C17004 TOUGH SKIN – A SPRAY-ON POLYMERIC.
Computer Simulation A Laboratory to Evaluate “What-if” Questions.
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
Discrete Event Simulation in Automotive Final Process System Vishvas Patel John Ma Throughput Analysis & Simulations General Motors 1999 Centerpoint Parkway.
Dr. István Fekete: The Role of Integrated Risk Management in Organizations April11th, Budapest.
Research Update Automated Bolting and Meshing Project.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.
Applied Educational Systems ( or ) Explorations and Foundations in Technology tech center 21 Explorations and Foundations in Technology.
HIT241 - RISK MANAGEMENT Introduction
Case Study : Morcom Trading – P BSC 21
ACARP Roadway Development - Operators Workshop March 2008
Industrial Software Project Management Some views on project managing industrial and business software projects.
ACARP Australian Roadway Development Improvement Project ROADWAY DEVELOPMENT OPERATORS’ WORKSHOPS March 2009.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops September 2009 ACARP PROJECT C17004 UPDATE: TOUGH SKIN – A SPRAY-ON.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
13/2/08 Fundamental Analysis of Development Cycles at Xstrata NSW Mines ACARP Roadway Development Operator Workshops March 2008.
Online course: Multiculturalism in vocational guidance – Innovative tool for career counsellors’ professional development. Zuzanna Rejmer.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
1 “Production Management Software for the Coal Industry”
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
1 Material Flow System Concepting Multiple Carton SKUs Accumulation Unitization/Transport Storage/Retrieval Distribution * configuration * operating rules.
Recording the Context of Action for Process Documentation Ian Wootten Cardiff University, UK
OPERATING SYSTEMS CS 3530 Summer 2014 Systems and Models Chapter 03.
I-270/MD 355 Simulator: An Intelligent Online Traffic Management System Dr. Gang-Len Chang Nan Zou Xiaorong Lai University of Maryland Saed Rahwanji Maryland.
Materials for Lecture 19 Readings Chapter 14
Simulation Sesi 12 Dosen Pembina: Danang Junaedi IF-UTAMA1.
University of Wollongong RoadSIM Roadway Development Simulation System August/September 2009 RDTG Workshop G. Gray and O. Rojas – Simulation Modelling.
Dr Tracey England Discrete Event Simulation. OR Methods “Soft” methods Methods to help structure ill- structured problem situations Methods for more structured.
Road Investment Decision Framework
Personal Trip Assistance System. Intelligent Transport Systems Increase in traffic intensity  need for intelligent way for road usage.
REACH FOR POLYMERS A €480, month project aiming to increase the knowledge base of the European polymer industry, particularly SMEs, when complying.
UEP Steering Review December 2008 Exploring the use of MOLAND as a system to predict emissions from mobile sources Edward Casey Under the supervision.
Computer Simulation Henry C. Co Technology and Operations Management,
Business process management (BPM)
Hadoop and Spark Dynamic Data Models Amila Kottege Software Developer
Panel Discussion: Discussion on Trends in Multi-Physics Simulation
Chapter 6: Database Project Management
Unscented Kalman Filter for a coal run-of-mine bin
Business process management (BPM)
August/September 2009 RDTG Workshop
Chute Modelling Capabilities & Future Directions Paul Munzenberger
World-Views of Simulation
ACARP Project C16022 undergroundcoal.com.au
Presentation transcript:

1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo Rojas - SMS University of Wollongong

The Development Challenge Longwall mining is a cost effective means of extracting coal …..provided roadway development can keep pace… ACARP initiated a project to assist improving the roadway development process. 2

Modelling The Process ACARP recognised the need for modelling tools The concept of using dynamic simulation technology was proposed UOW and SMS worked with industry experts Modelling tools and Models developed. 3

Simulation Technology Methodology has numerous alias’s Monte Carlo Simulation Discrete Event Simulation Computer Simulation Simulation Modelling Dynamic Simulation 4

Simulation Technology But not this… 5 British Army WWI Horse Simulator

Simulation Technology In our context: Models operate over time Dynamic interactions between components Allow for randomness/variability in operations Provide animated displays ……provide WHAT IF analysis capability. 6

Scope Of Modelling Focus On Gate Road Development 2 heading development Modelling will cover operations from face to boot 7

Modelling System For Roadway Development Dynamic modelling system Allows Roadway Development options to be explored Predicts: Achievable development rates (days/1000m) Bottlenecks (including unrecorded delays) eg Miner waits on shuttle car Shuttle car waits on miner Boot end delays Traffic delays (car interactions) 8

Development Process 9

RoadSIM – toolkit + models 10

Model – Users 11

Model Setup Data Required To Set Up The Model Configuration (roadway dimensions) Miner cycle times Support times Shuttle Car Performance Operational Availability Planned Unplanned (randomly imposed on the model) 12

Running The Model Each Setup is replicated many times Each replication of the model has the same setup – but different possible unplanned events. Animation to confirm operations Reporting available in Excel for assessment.

Animated Display 14

Animated Display 15

Model Output Estimates of : Time to complete a Pillar Scheduled operating time per 1000m First coal to first coal time Exposure rates Metres/Running Hour Utilisation of time. 16

Miner Utilisation Definitions Output – Utilisation Definitions Utilisation …. 17 Calculated from random interactions in the model

Output – Exposure Rates 18

Case Study Mine Mine was selected to test models ability to reproduce past performance Mine 1: 2 Heading Operation 1 Bolter-Miner 1 Shuttle car 19

20 Case Study Mine – Historical Performance Mine 1 Stats Pillar Cycle Time (First coal to first coal)11days Exposure Rate (m/op. hour)1.8m/op. hr Exposure Rate (m/rep. run hour)4m/rep. run hr Delay Categories (% of Simulation Time) Mine Process Planned0.3 Mine Process Unplanned0.1 Outbye Services Unplanned16.2 Panel Engineering Planned3.6 Panel Engineering Unplanned3.9 Panel Process Planned16.3 Panel Process Unplanned3.1 Sequence Move Planned15.5 Unscheduled Planned14.4 Unrecorded Delay2.0

21 Case Study Mine – Model vs Historical

22 Case Study Mine – Model vs Historical

23 Case Study Mine – Model vs Historical

24 Case Study Mine – Model Exposure Rate

Exploring Options Simulation model can be used to explore alternative options These can include: Pillar length Shuttle car size Discharge rates Support times Others … 25

Exploring Options Impact of Support time 26

Exploring Options Impact of Shuttle Car Discharge Times 27

In Summary… ACARP project has resulted in a modelling tool for Australian industry RoadSIM is aimed at assisting in evaluating roadway development options Provides a What If tool to assist with process improvement. 28

Thanks for your attention …Questions ?? University of Wollongong