11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Fred Nobrega October 3,  Cable is mechanically unstable, 40 x 0.7 mm dia. strand, mm wide.  PC01 had >5 popped strands on each layer, roped.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Last week first slide: Planning “Best Guess” Short Plan “best guess” – collared coils 102/104 “dry test" next week – Mirror MBHSM101 : collared coils 105/101.
Program overview: motivation, target parameters, timeline A.V. Zlobin 15 T dipole design review 28 April 2016.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
Rodger Bossert/Shlomo Caspi
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
11T Dipole – Single Aperture 2m Model
ERMC/RMM activities May 2017
Far Detector Activities Late 2017 – Early 2018
the MDP High Field Dipole Demonstrator
Analytical Cost Model (16 T dipole)
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Presentation transcript:

11 T Dipole Status at FNAL Fred Nobrega January 21, 2014

MBHSP03 Cold Mass Status Structure – Collar packs welded & installed – Begin collar keying – Yoke & Al clamps available – 1 m bolt on skin currently being used by MBHSM01 Schedule – Key, 1 week – Yoke, 1-2 weeks – Disassemble MBHSM01 for bolt-on shell, ~1 wk – Final assembly, 4-5 weeks starting 14 Feb 2014 – VMTF, 21 Mar 2014 January 21, T Dipole Status at FNAL, Fred Nobrega2

Coils MBH11 & 12 MBH11 – Being prepped for impregnation – Currently on hold due to technician family health issue – Earliest impregnation: week of 3 Feb, most likely week of 10 Feb. MBH12 – Layer 2 winding in progress, 8 turns remain. – Coil cure by Friday, 31 Jan. – Coil reaction prep on hold until tooling & Tech’s available End of 11 T coil winding! January 21, T Dipole Status at FNAL, Fred Nobrega3

MBHSM01 Disassembly Begins in the next few weeks – Need bolt on skin from mirror magnet for MBHSP03 Remove Al clamps and yoke? TBD – Locate inner coil spot heater failure and repair – Retest January 21, T Dipole Status at FNAL, Fred Nobrega4

11 Tesla Procurement Status MM 2-in-1 yoke laminations complete 1 m magnet yoke laminations for 2-in-1 – Vendor promised Friday 17 Jan 2014 – Inspection 2-in-1 shell welding contact tooling, Fermi machine shop, 90% complete. – Subset of tooling used for 1m bolt on skin assy January 21, T Dipole Status at FNAL, Fred Nobrega5

Next up… 2 in 1 Mechanical Model 2 in 1 magnet, MBSDP01 (MBHSP02 & 03) MBHSP04 (coils MBH11 & 12) January 21, T Dipole Status at FNAL, Fred Nobrega6 MBHSP03 2in1 MM