Group 3 Proposal Ryan Boak Douglas Gobeski Justin King Michael Priebe Daniel Raphael Mark Rogers Becca Wahmhoff Bryan Witherspoon.

Slides:



Advertisements
Similar presentations
J.M. Gabrielse VEX Lifts (Devices that extend upwards) Lab Rats’ 2008 Bridge Battle Robot.
Advertisements

Clutch Fundamentals Chapter 69.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
Interaction Devices By: Michael Huffman Kristen Spivey.
Power, Torque and Robot arms An intro. VEX Arms Robert’s ARL robot in 2006.
Modular Crane Control System (MCCS)
Connecticut Corsair Senior Design Simulator Refurbishment EE Design Team 194.
Exhaust Emissions Analyzer Introduction In a day when global CO 2 levels are one of the greatest concerns of society, surprisingly few advances have been.
GO KART FOR SHANE CLIENT CONTACT: Shane Davis, 6 Sunrise Drive, Columbia CT TEAM 3: Jeff Marcelus Bramatej Meka Raymond.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
Wireless Controller Steven Mays Faculty Advisor: Frank Hludik Start Date: 10/27/09 End Date: May 2010.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
Justin Heyer Ted Keppner. Build an autonomous barn floor scrapper Needs to be able to be adapted to multiple barns Solutions to clean either slotted/solid.
Chapter 1 Information Technology, The Internet, And YOU.
The Ultimate Surveillance Vehicle Nicholas Sanders Matthew Kozlowski Matthew Sommer Jeff Graw.
Requirements Analysis Lecture #3 David Andrews
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
TEAM SYNTH: Design Proposal EE 41430, Fall 2007 John Simmons William Andrews Angela McKenzie.
R I T Team Members: Nandini Vemuri → Team Lead, System Testing, Motor Expert Jason Jack → GUI Design, Microcontroller Expert, Website Administrator John.
Detailed Design Review Project P13363 Members: Justine Converse (IE) James Cover (CE) Alexander Eschbach (EE) Jason Hang (ME) Ashley Trode (EE) Guide:
DESIGN OF MODERN INTEGRAGTED LABORATORY-STATION (ILS) FOR ENGINEERING EXPERIMENTAL COURSES M. Kostic, Srinivasa Rao Vaddiraju, Srinivas.
Design and Implementation of Metallic Waste Collection Robot
Team Bob ME 4182 Capstone Design Michael Galvin Rick Rogers Jennifer Edwards Hayato Shimizu Louay Abdul-Hadi.
Commerce, a.s., Bratislava
VEX Robotics Platform and ROBOTC Software
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
Slide # 1 Velocity sensor Specifications for electromagnetic velocity sensor Velocity sensors can utilize the same principles of displacement sensor, and.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid Advisor: Dr. Becker-Gomez 1RC Camera Car SDR.
Introduction to the VEX ® Robotics Platform and ROBOTC Software © 2012 Project Lead The Way, Inc.Principles of Engineering.
F.A.C.T. Turret Team 9 Anthony Ragghianti David Fixter Danny Smith Jack Hunt Joseph Potter.
PRINCIPLES OF OPERATION
INTRODUCTION “Big Red” Torin Aluminum Jack “Big Red” Torin Aluminum Jack 3000 lb capacity 3000 lb capacity Gross weight 48 lbs Gross weight 48 lbs High.
ISU Science Center : Phase 3 : Dec Speedometer Station This station matches two areas of study into one cohesive system. Current will be induced.
Control Systems Engineering
Location-Aware Image Database Yung-Hsiang Lu Center for Wireless Systems and Applications (CWSA) School of Electrical and Computer Engineering.
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Pool Player Bot Final Presentation Jiaying Zhang Mechanical Engineering.
J.M. Gabrielse Robotics – Bell Work 12/10/2014 On a half sheet of paper, list the types of gears that are used to convert rotational motion to linear motion.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Mid-Semester Presentation Senior Design October 5, 2010
Final Presentation Senior Design November 30, 2010.
ELECTROMAGNETS By wilf And Michael.
Mid – Semester Presentation Senior Design February 25, 2010.
M. Zareinejad 1. 2 Outline # Sensors –––– Sensor types Sensor examples #Actuators Actuator types Actuator examples ––––
IN 1900 ICT Project Final Presentation. Group name : Code Squad.
May07-02: Parking Meter Clint Hertz: Team Leader Austyn Trace: Communications Nick Hollander Christian Baldus.
Robotic Arm and Dexterous Hand Preliminary Design Review November 12, 2004.
Electrical and Computer Engineering Preliminary Design Review Team 22: Driver Assist.
Electrical and Computer Engineering Midway Design Review Team 22: Driver Assist.
Dead Bulb Walking Greg Drewry Clint Huxtable Jared Jones Brandon Sneed.
Keyboard mode: First Touch Second Touch if2is2mf2ms2rf2rs2ps2 if1abcdfg[space] is1hejklm[backspace] mf1npiqrs[return] ms1tvwoxz[period] rf10123u4[sym]
Introduction to VEX® components
Dec06-02: Parking Meter Ryan King: Team Leader Kristen Goering: Communications Justin Smith John Scapillato.
VEX Lifts (Devices that extend upwards)
Clutch Fundamentals.
VEX Lifts (Devices that extend upwards)
Zach Bolotin Cody Hatch Robert Swartz
Brendon Knapp, Edmund Sannda, Carlton Allred, Kyle Upton
‘SONAR’ using Arduino & ultrasonic distance sensor
R.A.W. Remote Armwrestling
Teacher training resource: Robotic Assembly
Solo-1 ARF Airplane Team 4: Joshua Shawala (Team Leader) Darth Fitch
Moto-eV Team 13 Michael Stuckenschneider Loren Garby Arin Chakraverty
James Sigler, Mohammed Allahyani, Khalid Alghamdi, Yu Sun
Input devices A piece of equipment that allows the user to give instructions and input data to the computer.
VEX® Robotics Platform and ROBOTC Software
Teacher training resource: Robotic Assembly
Presentation transcript:

Group 3 Proposal Ryan Boak Douglas Gobeski Justin King Michael Priebe Daniel Raphael Mark Rogers Becca Wahmhoff Bryan Witherspoon

Visual/Motion Ship Simulator Project sponsor is PI Engineering located in Williamston, MI Project sponsor is PI Engineering located in Williamston, MI Specializes in simulation Specializes in simulation Project involves putting together a tug boat simulator Project involves putting together a tug boat simulator Requires careful planning between software, electrical, and mechanical components Requires careful planning between software, electrical, and mechanical components Design Team: 2 CpEs, 2 EEs, 4 MEs Design Team: 2 CpEs, 2 EEs, 4 MEs

Simulation Software and Computer Computer mounted in the front of the simulator Computer mounted in the front of the simulator Use of the Virtual Sailor program Use of the Virtual Sailor program Simulates variety of conditionsSimulates variety of conditions Program uses input signals from throttles and wheel Program uses input signals from throttles and wheel Outputs to 5-10 gauges and platform Outputs to 5-10 gauges and platform 2 wave files generated, one for sound and one for outputs2 wave files generated, one for sound and one for outputs Picture taken from

Simulation Software Continued Input/Output interface with hardware will have to be designed Input/Output interface with hardware will have to be designed Developer provided an outputs objectDeveloper provided an outputs object Full capability is not built in with the softwareFull capability is not built in with the software Keyboard inputs will have to be replaced by simulator inputsKeyboard inputs will have to be replaced by simulator inputs Outputs will have to go to the microcontroller in real-timeOutputs will have to go to the microcontroller in real-time Picture taken from

A Gauge for Success! Custom Built Gauges Custom Built Gauges Patent Pending Position Sensing Patent Pending Position Sensing Software Controlled Software Controlled Customizable Faces Customizable Faces Backlighting Backlighting Waterproof Waterproof

Which Way is North? Actual Soo River Belle Compass Actual Soo River Belle Compass Software Controlled Software Controlled Replacement Magnetic Field Replacement Magnetic Field Multiple Phase Position Sensing Multiple Phase Position Sensing

Steering Has to stand up to punishment Has to stand up to punishment 4 total revolutions 4 total revolutions Transmits position information with a potentiometer Transmits position information with a potentiometer Chain-driven hydraulic system to provide “stops” at extremes of rotation Chain-driven hydraulic system to provide “stops” at extremes of rotation Design/analysis focus on matching displacement volumes and gear ratios, and mechanical strength Design/analysis focus on matching displacement volumes and gear ratios, and mechanical strength Picture taken from

Motion Platform  The motion platform will be created by modifying an existing Quasi- Motion™ Servo Controlled Tipper Platform.  The platform will be extended to approximately 6’ x 8’.  The extension will most likely be raised about a foot over the original tipper with supports attaching to the corners of the platform.  The platform must be raised up far enough so that it doesn’t hit the floor during tipping.  A diagram of motion will be drawn up to show the range of motion of the tipping platform.

Design Considerations for the Motion Platform Pivot Point Pivot Point One of the main factors to affect the realism of motion.One of the main factors to affect the realism of motion. Should be as close to the actual C.G. of the ship as possible.Should be as close to the actual C.G. of the ship as possible. This will be limited by the size of the motion platform. This will be limited by the size of the motion platform. Balancing Masses Balancing Masses Since most of the weight will be in the front of the cabin, balancing masses will be provided in the rear.Since most of the weight will be in the front of the cabin, balancing masses will be provided in the rear.

Spacing of Bellows Spacing of Bellows Since the bellows have a finite strength with which to lift the cabin, they may need to be spaced further out.Since the bellows have a finite strength with which to lift the cabin, they may need to be spaced further out. This would require modification of the motion platform, and will be avoided if possible. This would require modification of the motion platform, and will be avoided if possible. Spaced bellows will be able to support more weight, but won’t be able to move the cabin as much.Spaced bellows will be able to support more weight, but won’t be able to move the cabin as much. Design Considerations for the Motion Platform

Pilot House Cabin Capacity: 1-2 people Capacity: 1-2 people Entirely enclosed Entirely enclosed Back entrance door Back entrance door Rectangular windows Rectangular windows Computer screens viewing window Computer screens viewing window Plywood, L- Brackets, Nuts & Bolts Plywood, L- Brackets, Nuts & Bolts Realistic & fun Realistic & fun

Conclusion Project sponsor is PI Engineering Simulator design requires communication across multiple disciplines Software, electrical, and mechanical components Design challenges Portability