1 PoGO spring-8 BeamTest preparation Tsunefumi Mizuno and others June 2, 2003 at teleconference.

Slides:



Advertisements
Similar presentations
Dante Nakazawa with Prof. Juan Collar
Advertisements

VETO Analysis Update Michael Wood University of Massachusetts, Amherst Outline Introduction and basics Reconstruction packages Efficiencies Simulation.
Figure 5. Histogram of the decay constant. Black curves: raw histograms; Blue curve: Gaussian fit to the histogram from the 20GS/s waveform; Red curve:
Introduction to QuarkNet Lab Summer 2012 R. Mountain, M. Soderberg, S. Blusk with Erika Cowan, Anna Fadeeva, Dylan Hsu, Emily Kraus.
The Angra Neutrino Detector Detector, VETO and electronics conceptual design Laudo Barbosa (May 18th, 2006) Centro Brasileiro de Pesquisas Físicas (CBPF)
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
VELO Beamtest Trigger VELO meeting 08/12/2005 Jianchun (JC) Wang Syracuse University.
1 Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting June 20, 2007.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
Pocket Multi-channel Signal Analyzer IIntroduction Key Features Applications Key Specifications Hardware Connections.
DAQ_HowTo_ ppt1 How to use DAQ for Argonne Beam Test Tsunefumi Mizuno November 07, 2003 History.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Data Acquisition Data acquisition (DAQ) basics Connecting Signals Simple DAQ application Computer DAQ Device Terminal Block Cable Sensors.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Beam Profile Monitor Status Immediate Objective Materials needed Projections Conclusion Anthony Tatum University of North Carolina Wilmington.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
First Results from T3B Calice AHCAL Meeting – Desy, January 2011 Christian Soldner Max-Planck-Institute for Physics.
Background measurements and simulation Hayg Guler Marc Verderi LLR – Ecole polytechnique ATF2 project meeting, June 2009.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
1 Report on analysis of PoGO Beam Test at Spring-8 Tsunefumi Mizuno July 15, 2003.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Rl/ic/ukdmc cPCI - DAQ for NaI Crystals. rl/ic/ukdmc DC MS/s (*) Sampling Rate simultan. on all channels 150 MHz (*) Bandwidth 128 kpoints per.
Calibration of the new Particle Identification Detector (PID) Tom Jude, Derek Glazier, Dan Watts.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PoGO_G4_ ppt1 Study on Key Properties of PoGO by Geant4 Simulator January 28, 2004 Tsunefumi Mizuno History of changes:
We report the result of a beam test on a prototype of Astronomical hard X-ray/soft gamma-ray Polarimeter, PoGO (Polarized Gamma-ray Observer). PoGO is.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
1 Report on analysis of PoGO Beam Test at Spring-8 Tsunefumi Mizuno July 15, 2003 July 21, 2003 revised August 1, 2003 updated.
Geant4 simulation for Balloon Flight Jan. 16, 2001 Software Workshop at SLAC Tsunefumi Mizuno.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
Current Monitor System (1606) AJ Pikul Barath Parthasarathy Jason Stock Maya Dubrow.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Progress report of the GLAST ACD Beam Test at CERN (Backsplash study) simulation and analysis Tsunefumi Mizuno, Hirofumi Mizushima (Hiroshima Univ.) and.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 Study of scintillator/PMT properties for PoGO experiment August 25, PoGO Teleconference Tsunefumi Mizuno BGO Transmission.
PoGO_collimator_ ppt1 Study of PoGO background dependence on the collimator material/slow scintillator threshold April 21, 2004 Tsunefumi Mizuno.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
Proton Test Beam Experimental Program Overall objective: Study response of modified monochrome DC Plasma Display Panels to low energy proton beam. Energy.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
PoGO_G4_ ppt1 Study of optimized fast scintillator length for the astronomical hard X- ray/soft gamma-ray polarimeter PoGO November 1, 2004 Tsunefumi.
PoGO_G4_ ppt1 Study of BGO/Collimator Optimization for PoGO August 8th, 2005 Tsunefumi Mizuno, Hiroshima University/SLAC
ArgonneResult_ ppt1 Comparison of data and simulation of Argonne Beam Test July 10, 2004 Tsunefumi Mizuno
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
ArgonneResult_ ppt1 Results of PoGO Argonne Beam Test PoGO Collaboration meeting at SLAC, February 7, 2004 Tsunefumi Mizuno
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 Report on analysis of PoGO Beam Test at Spring-8 Tsunefumi Mizuno July 15, 2003 July 21, 2003 revised.
O Tsunefumi Mizuno, Tuneyoshi Kamae, Jonny Ng, Hiroyasu Tajima (SLAC), John W. Mitchell, Robert Streitmatter (NASA GSFC), Richard C. Fernholz, Edward Groth.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
Geometry of the ACD Beam Test at CERN (2002) Tsunefumi Mizuno Overview of the Setup: p.2 ACD tile configuration: pp.3-4 Sn Calorimeter:
HERD Prototype Beam Test
Charge collection studies with irradiated CMOS detectors
SLAC: SiD AHCAL Status and Update Ross McCoy, Andrew Myers, Andy White.
June 1, 2004 Tsunefumi Mizuno Expected Modulation Factor of PoGO calculated with Geant4 Simulator with PoGO-fix June 1, 2004 Tsunefumi.
HERD Prototype Beam Test
BESIII EMC electronics
High Granularity Calorimeter Upgrade Studies
Presentation transcript:

1 PoGO spring-8 BeamTest preparation Tsunefumi Mizuno and others June 2, 2003 at teleconference

2 DAQ setup plan Except for 8 PMTs that will be shipped from Princeton, we have already purchased/borrowed all devices. (Most of them are yet to be configured!)

3 Current status We plan to use waveform analyzers that record waveform like a digital oscilloscope does. So far, we have configured single channel data acquisition. Configuring the multichannel/multicard data acquisition is underway. To get the deposit energy distribution, we pickup peak voltages of each event and fill them to a histogram. A sample histogram of the fast scintillator and 241 Am is shown here.

4 To do lists Hardware Configuring multichannel/multicard data acquisition. Implementing the veto while data recording. Calibration of 7 PMTs and scintillators. To adjust the high voltage and shaping amplifier. Software To prepare quick-look software to show histograms during data acquisition. To prepare the EGS4/Geant4 simulation program for this Beam Test.